Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-08-25-9430 MARCELINO HOLGUIN 1,200 SQ FT Accessory Dwelling Unit (ADU)/ADU GARAGE WITH AN ATTACHED 3,040 SQ FT PRIVATE USE'AUTO BARN' TBD Harvest Ln, New Castle Gilead Gardens Lot 9 - 218107203009 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECTTO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION. 6) OPEN HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 2,500 PSF AS SPECIFIED BY THE GEOTECH. 7) PROPANE FUEL TYPE SPECIFIED -SEE ATTACHED PROPANE GUIDE. 8) PRE -FABRICATED ROOF TRUSSES. PROVIDE ENGINEERING AT FRAMING INSPECTION. 9) RADON GAS TESTING: SEE PLAT NOTE #2 AND PLAN NOTE #1 ON ATTACHED A2.0. 10)SEPTIC SYSTEM REVIEW /APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN -OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. 1 1) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25 FT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 12) BLOWER DOOR TEST IS REQUIRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. SEE PLAN ATTACHMENT FOR SMALLER RESIDENTIAL DWELLINGS UNITS. jZ 13) PRESCRIPTIVE PATH WITH RESCHECK CHOSEN FOR ENERGY COMPLIANCE OF THE HOME DESIGN. SEE ATTACHED COOL CALC MECHANICAL SPECIFICATIONS AND REPORTS. ALL NEW HOMES TO HAVE WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE ml507.3.3(1) AND (2) AS STAMPED ON SHEET A5.0) 14) PLANS REVIEWED FOR PRIVATE ADU / GARAGE FOR OWNER'S PERSONAL USE - STRUCTURE NOT REVIEWED FOR ANY FUTURE COMMERCIAL BUSINESS USE OR OCCUPANCY. FUTURE CHANGE IN BUILDING OCCUPANCY AND/OR LAND USE, SUBJECT TO NEW APPLICATION REVIEW BY GARFIELD COUNTY COMMUNITY DEVELOPMENT FOR COMPLIANCE WITH ADOPTED BUILDING CODES AND LAND USE REGULATIONS. INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK. LOCATE ALL UTILITIES PRIOR TO ANY WORK. 811 IS THE STATE UTILITY LOCATE NUMBER CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF ROAD OR NON -SEEDED AREA. PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED. PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION. MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERTY, DRAINAGE SHALL NOT ENTER NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE FOLLOW ENGINEERED PLANS. VERIFYANY CHANGES WITH THE ENGINEER. Z &) �- Z' G-0i�//?, or2s