Loading...
HomeMy WebLinkAboutBlower Door Test Report Page 1 of 1 11/13/2025 P.O. Box 1434, Edwards, CO 81632 | P: 970.306.4237 | E: jason@north39energy.com Placek Residence Air Infiltration & Ventilation Flow Testing Report Test Date: November 12th, 2025 Builder: Crystal Constructors Inc. Contact: Joh Placek Site Address: 363 Rapids View Lane, New Castle, CO Site Visit By: Jason Weingast Background The project goal is to undergo testing at the final point in construction to determine if the unit meets the IECC requirements for infiltration and ventilation. North 39 Energy was contracted to perform a final blower door test to determine total air infiltration and ventilation flow testing. The blower door testing must show a tested value of 3 ACH50 or lower in order to comply with the IECC. The ventilation flows must achieve 20cfm per bathroom for continuous ventilation per R303.3. Site Observations Construction of the building envelope was complete. All exterior openings were shut and locked and interior doors were open. The blower door test was performed in an exterior door. The pressure probe was placed outside. The ventilation test was performed in each bathroom. Blower Door Test The unit was depressurized, utilizing blower door testing equipment to a pressure of -50 Pa. At the test pressure, the CFM50 was recorded, in order to determine the ACH50. The blower door air leakage resulted in the following measurements: 1.4ACH50 Ventilation Flow Test An exhaust fan flow meter was installed on the bathroom exhaust units of the home. The cfm exhaust flow was measured for each fan. The bathroom ventilation testing resulted in the following measurements: 23, 24 & 27cfm. Please call with any questions or concerns. Jason Weingast HERS Rater & IECC/HERS Compliance Specialist NORTH 39 ENERGY Expert Energy Consulting & Verification Services