Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Manual J Report
Job: wri htsoft' Manual S Compliance Report Date: October 16, 2025 Entire House By: Rapid Creek Mechanical For: Luis Vargas, UnityMountain Builders -34 aC- leRidge Dr., Parachute, C081635 !!�qrrd-+ 1pdaled Cooling v v Design Conditions Outdoor design DB: 97.7°F Sensible gain: 27489 Btu Entering coil DB: 77.9°F Outdoor design WB: 61.2°F Latent gain: 0 Btu Entering coil WB: 62.3°F Indoor design DB: 75.0°F Total gain: 27489 Btu Indoor RH: 50% Estimated airflow: 1200 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: RUNTRU Actual airflow: 1200 cfm Sensible capacity. 25200 Btu Latent capacity. 10800 Btu Total capacity: 36000 Btu Design Conditions Outdoor design DB: -2.0°F Indoor design DB: 70.0°F Model: A4AC3036A1+A4MXB4248AC6+A951X080BU4SA 92% of load 0% of load 131% of load SHR Heat loss 70% 61837 Btu h Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: RUNTRU Actual airflow: 1200 cfm Output capacity. 77000 Btu Model: A951X080BD4S°"' 125% of load Meets all requirements of ACCA Manual S. Entering coil DB Temp. rise: 66.2°F S 50 °F V 2025-Oct-27 07:04:37 'rr�9~� Right -Suite® Universal 2023 23 0 01 RSU62085 Page 1 .�1C,1r�+11 .. 8\Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc =MJ8 Front Door faces: E A%tt.__ /M%%—►ee ACCK Ar o� t:ar ""-b d:c-m Contractor: Mechanical license: Building plan #: Home address (Street or Lot#, Block, Subdivision) Ga rfie Id County Header Information REQUIRED ATTACHMENTS Manual J1 Form (and supporting worksheets): or MJ1AE Form' (and supporting worksheets): OEM performance data (heating, cooling, blower): Manual D Friction Rate Worksheet: Duct distribution sketch: 310 Eagle Ridge Dr., Entire House HVAC LOAD CALCILATICN QRC M1401.3 DeslgrLCortditions Winter Design Conditions Outdoor temperature: -2 °F Indoor temperature: 70 °F Total heat loss: 61837 Btuh Summer Design Conditions Outdoor temperature: 98 °F Indoor temperature: 75 °F Grains difference: -39 gr/lb @50% RH Sensible heat gain: 26767 Btuh Latent heat gain: 0 Btuh Total heat gain: 26767 Btuh Building -Construction -information Building Front Door faws East North, East, West, South, Northeast, Northwest, Southeast, Southwest Number of bedrooms: 4 Conditioned floor area: 1835 ftz Number of occupants: 4 Form RIPER 1 15 Mar 09 ATTACHED Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Windows Eave overhang depth: 0 ft Internal shade: none Blinds, drapes, etc. Number of skylights: 0 WAC r UIPM ENT SELECTION4013) Heating-EquipmentData Cooling -Equipment Data Blower Data Equipment type: Gas furnace Equipment type: Split AC Heating cfm: 1200 Furnace, Heat pump, Boiler, etc. Air conditioner, Heat pump, etc. Cooling cfm: 1200 Model: RUNTRU Model: RUNTRU Static pressure: 0 in H2O A951 X080BD4S"' A4AC3036A1 Fan's rated external static pressure for design Heating output capacity: 77000 Btuh Total cooling capacity: airflow 0 Btuh Heat pumps -capacity at winter design outdoor conditions Sensible cooling capacity: 0 Btuh Aux. heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT D IST RIBUTIONsl Design airflow: 1200 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESR 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length (TEL): 0 ft Sheet metal Available static pressure (ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Friction Rate = ASP + (T EL x 100) Contractor's printed name: Contractor's signature: on Date: Rig ht-Suite@ U niversal 2023 23.0 01 RSU62085 Job: + wrightsoft` Load Short Form Date: October 16, 2025 Entire House By: Rapid Creek Mechanical Pp ect Information For: Luis Vargas, Unity Mountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Design • • Htg Clg Infiltration Outside db (°F) -2 98 Method Simplified Inside db (°F) 70 75 Construction quality Average Design TD (°F) 72 23 Fireplaces 1 (Average) Dailyrange - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 61 -39 HEATING EQUIPMENT COOLING EQUIPMENT Make RUNTRU Make RUNTRU Trade RunTru Trade RUNTRU Model A951X080BD4S*** Cond A4AC3036A1 AHRI ref 204606338 Coil A4MXB4248AC6+A951X080BU4SA AHRI ref 205012936 Efficiency 95 AFUE Efficiency 12.0 EER, 14 SEER Heating input 80000 Btuh Sensible cooling 25200 Btuh Heating output 77000 Btuh Latent cooling 10800 Btuh Temperature rise 70 °F I-otal cooling 36000 Btuh Actual air flow 1200 cfm Actual air flow 1200 cfm Air flow factor 0.020 cfm/Btuh Air flow factor 0.044 cfm/Btuh Static press ure 0 in H2O Static press ure 0 in H2O Space thermostat Load sensible heat ratio 1.00 ROOM NAME Area Htg load Clg load =HtgAVFClg AVF (ft2 (Btuh) (Btuh) (cfm) Master Bath 134 5359 1648 106 73 Bed 2 169 5243 3627 104 161 Bath 78 2001 707 40 31 Bed1 149 4768 3562 94 158 Mech Room 24 806 129 16 6 WIC 26 397 39 8 2 Laundry 79 1223 761 24 34 Living 451 17892 7279 354 322 Kitchen 403 11086 2998 220 133 Master Bed 239 9427 5989 187 265 Master Closet 84 2388 358 47 16 Bold/italic values have been manually overridden Calculations approved byACCAto meetall requirements of Manual J 8th Ed. $r Wri9htspf.t. Rig ht-Suite® Universal 2023 23.0.01 RSU62085 Ilm ... 8\Docu ments\Wrig htsof t HVAC\310 Eagle Ridge. rup Calc = MJ8 Front Door faces. 2025-Oct-27 07:04:37 Page 1 Entire House 1835 60590 27096 1200 1200 Other equip loads 1247 393 Equip. @ 1.03 RSM 28231 Latent cooling 0 i TOTALS 1835 ' 61837 28231 ' 1200 ' 1200 Bold/italic values have been manually overridden Calculations approved byACCAto meetall requirements of Manual J 8th Ed. 2025-Oct-27 07:04:37 � 1 4 vvrigh.tsof't" Right -Suite® Universal 2023 2M.01 RSU62085 Page /R & ...6\Documents\Wrightsoft HVAC\310 Eagle Ridge-rup Calc = MJ8 Front Door faces: E Job: }�+ wri htsoftb Building Analysis Date: October 16, 2025 9 Entire House By: Rapid Creek Mechanical Proiect Information For: Luis Vargas, Unity Mountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 ° N Outdoor: Heating Dry bulb (°F) Dailyrange (°F) - Wet bulb (°F) Wind speed (mph) 15.0 Design Conditions Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H j Method 61 Construction quality 7.5 Fireplaces Heatin Component BtuhV Btu %of load Walls 3.6 6265 10.1 Glazing 41.0 10106 16.3 Doors 20.9 1503 2.4 Ceilings 1.6 2907 4.7 Floors 11.2 20615 33.3 Infiltration 5.3 8824 14.3 Ducts 10369 16.8 Piping 0 0 Humidification 0 0 Ventilation 1247 2.0 Adjustments 0 Total 1 61837 100.0 Coolin Co m qi t Btu h/fC Btu h % of load Walls 1.0 1666 6.1 Glazing 43.7 10758 39.1 Doors 5.7 410 1.5 Ceilings 1.2 2174 7.9 Floors 0 0 0 Infiltration 0.8 1244 4.5 Ducts 8523 31.0 Ventilation 393 1.4 Internal gains 2320 8.4 Blower 0 0 Adjustm ents 0 Total 27489 100.0 Latent Cooling Load = 0 Btuh Overall U-value = 0.150 Btuh/ft2- °F, Window / Floor Area =13.4 % Data entries checked. Heat70ng Cooling 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) �"ZSS Vcmdanan Duds Glazing inf Ilrat on Doom Flows Qaang Bold/italic values have been manually overridden Walls Cther lrto. Gains u umration Ceilings K=- 2025-Oct-27 07:04:37 i* wrigtytsoft ��t+- Right-Suite®Universal 202323.0.01 RSU62085 Page 1 AFM 8\Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc = MJ8 Front Door faces: E -�+ wrightsoft„ Component Constructions Entire House Project Information. For: Luis Vargas, Unity Mountain Builders 310 Eagle Ridge Dr., Parachute, CO81635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 ° N Outdoor: Heating Dry bulb (T) -Z Dailyrange (T) - Wet bulb (° F) - Wi nd s peed (m ph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Or Area U-value Insul R Htg HTM Loss Clg HTM Gain Construction descri„tions M W Btuh/W-'F ft'-'F/Btuh Btuh/ft Btuh Btuh/ft Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" in 332 0.065 21.0 4.68 1555 1.24 414 gypsum board int fnsh, 2"x6" wood firm, 16" o c stud a 320 0.065 21.0 4.68 1496 1.24 398 s 192 0.065 21.0 4.68 897 1.24 239 w 495 0.065 21.0 4.68 2317 124 616 all 1339 0.065 21.0 4.68 6265 1.24 1666 Partitions 397 0 0 0 0 0 0 12C-Osw Windows 1 D-c2ov- 2 glazing, clr outr, air gas, vni firm mat, clr innr, 1/4" gap, 1/4" n 40 0 570 0 41.0 1642 23.8 954 e 73 0.570 0 41.0 2975 65.9 4776 thk; 6.67 ft head ht 45 0.570 0 41.0 1847 23.8 1073 s w 44 0.570 0 41.0 1796 65.9 2882 w 45 0.570 0 41.0 1847 23.8 1073 all 246 0.570 0 41.0 10106 43.7 10758 Doors n 48 0.290 10.5 20.9 1002 5.70 274 11 PO: Door, mtl pur core type 24 0.290 10.5 20.9 501 5.70 137 s all 72 0.290 10.5 20.9 1503 5.70 410 Ceilings Attic celing. asphalt shingles roof mat. r-49 ce+l ins. 5/8" gypsum board 1835 0.022 49 0 1 2907 1. 18.58 2174 int fnsh Floors Fir floor, firm flr, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 1835 0.312 15.0 11.2 20615 0 0 2025-Oct-27 07:04:38 WlitsoflC" Rig ht-Suite® Universal 2023 23.0 01 RSU62085 Page 1 ACCK .. 8\1DocumentsMrightsoft HVAC\310 Eagle Ridge rup Calc = MJ8 Front Doorfaces: E + wrightsoft- Component Constructions Master Bath For: Luis Vargas, UnityMountain Builders 310 Eagle Ridge Dr., Parachute, CO81635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -Z Dailyrange (T) - Wet bulb (° F) - Wind speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) or Area U-value insul R Htg HTM Loss Clg HTM Gain Construction descrit„ltions M ft' Btuh/ft2-°F ft-°F/Btuh Btuh/fl Btuh Btuh/ft' Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" n 94 0.065 21.0 468 438 1.24 116 gypsum board int fnsh, 2"xT wood frm, 16'. o.c. stud a 98 0.065 21.0 4.68 456 1.24 121 all 191 0.065 21.0 4.68 894 1.24 238 Partitions (none) Windows 1 D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" n thk; 6.67 ft head ht e all Doors (none) Ceilings Atlic cel ing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm fir, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 10 0.570 0 41.0 410 23.8 238 8 0.570 0 41.0 308 65.9 494 18 0.570 0 41.0 718 41.9 733 134 0.022 49.0 1.58 213 1.18 159 134 0.312 15.0 112 1507 0 0 =1= 2025-Oct-27 07:04:38 TT wrightsof - Right -Suite® Universal 2023 23 0 01 RSU62085 Page 2 ACC , B\Documents\Wrightsoft HVAC\310 Eagle Ridge.rup Cale = MJ8 Front Door faces: E + wrightsoft- Component Constructions Bed 2 Project I• • For: Luis Vargas, Unity Mountain Builders" 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 ° N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (° F) - 11Ui nd s peed (m ph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Or Area U-value insul R Mg HTM Loss Clg HTM Gain Construction descrintlOn$ M ft' Btuh/ft'-°F ft-°F/Btuh Btuh/W Btuh Btuh/ft Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" a 78 0.065 21.0 4.68 365 1.24 97 gypsum board int fnsh, 2"x6" wood frm, 16" o c. stud s 1 0.065 21.0 4.68 4 1.24 1 all 79 0.065 21.0 4.68 369 1.24 98 Partitions (none) Windows 1 D-c2ov 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1 /4" a 30 0.570 0 41.0 1231 659 1976 thk; 6.67 ft head ht Doors (none) Ceilinqs Attic cet ing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 169 0.022 49.0 1.58 268 1.18 200 int fnsh Floors Fir floor, frm flr, 12" thkns, hrd wd fir fnsh, tight crwl ovr, r-15 wall insul 169 0.312 15.0 11 2 1899 0 0 2025-Oct-27 07:04:38 A_:__4�1- wrightsoft- Right-SuiteC� Universal 2023 23.0 01 RSU62085 Page 3 .CICIK .. 8\Documents\Wrightsoft HVAC\310 Eagle Ridge.rup Calc = MJ8 Front Door faces: E Job: wri htsoft` Component Constructions Date: October 16, 2025 Bath By: Rapid Creek Mechanical Project Information For: Luis Vargas, UnityMounlain Builders 310 Eagle Ridge Dr., Parachute, CO81635 Design C• • • Location: Indoor: Heating Cooling Grand Junction Regional, CO, US Indoor temperature (°F) 70 75 Elevation: 4858 ft Design TD (°F) 72 23 50 Latitude: 39°N Relative humidity (%) 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 60.9 -39.0 Dry bulb (T) -2 98 Infiltration: Dailyrange (°F) - 28 ( H ) Method Simplified Wet bulb (°F) - 61 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or M Area U-value Insul R ft, Btuh/W-T ft'-°F/Btuh Mg HTM Loss Clg KrM Gain Btuh/ff Btuh Btuh/ft2 Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" a 43 0.065 21.0 4.68 201 1.24 54 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 1 D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" e 5 0.570 0 41.0 205 65.9 329 thk; 6 67 ft head ht Doors (none) Ceilings Attic cepng, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 78 0.022 49.0 1.58 123 1.18 92 int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd fir fnsh, tight crwl ovr, r-15 wall insul 78 0.312 15.0 11.2 874 0 0 2025-Oct-27 07:04:38 ti wri htsof[ ^� '�., _. Right-Suite®Universal 202323.0.01 RSU62065 Page ACCk ...8\Documents\Wrightsoft HVAC\310 Eagle Ridge.rup Calc = MJ8 Front Door faces: E Job: wri htsoft- Component Constructions Date: October 16, 2025 9 Bed 1 By: Rapid Creek Mechanical For: Luis Vargas, UnityMountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Design C• • • Location: Indoor: Heating Cooling Grand Junction Regional, CO, US Indoor temperature (T) 70 75 Elevation: 4858 ft Design TD (T) 72 23 Latitude: 39°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 60.9 -39.0 Dry bulb (T) -Z 98 Infiltration: Dailyrange (T) - 28 ( H ) Method Simplified Wet bulb (°F) - 61 Construction quality Average Wi nd speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions p Or Area U-value Ins ul R tl' Btuh/ft -'F ft'-'F/Btuh Htg HTM Loss Clg HTM Gain Btuh/R' Btuh Btuh/ft Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" a 65 0.065 21.0 4.68 305 1.24 81 gypsum board int fnsh, 2"x6" wood frm, 16" o c. stud Partitions (none) Windows 1 D-c2ov 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" a 30 0.570 0 41 0 1231 65.9 1976 thk; 6.67 ft head ht Doors (none) Ceilings Attic ceTng, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 149 0.022 49.0 1.58 236 1.18 176 int fnsh Floors Fir floor, frm fir, 12" thkns, hrd wd fir fnsh, tight crwl ovr, r-15 wall insul 149 0.312 15.0 11 2 1673 0 0 2025-Oct-27 07:04:38 41- wrigltitsvf .' Right -Suite® Universal 2023 23 0.01 RSU62085 Page 5 AiO .8\Documents\Wrightsoft HVAC\310 Eagle Ridge.rup Calc =MJ8 Front Doorfaces: E + wrightsoftn Component Constructions Mech Room For: Luis Vargas, Unity Mountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 ° N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (T) - Winds peed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Construction descri„tion$ Or Area U-value Insul R Mg HTM Loss Cig HTM Gain M ft' Btuh/ft'-OF ft'-°F/Btuh Btuh/ft' Btuh Btuh/ft' Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" a 36 0.065 21 0 4.68 168 1.24 45 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw Windows (none) Doors (none) Ceilinqs Attic celTing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 55 0 0 0 0 0 0 24 0 022 49.0 24 0.312 15.0 1.58 38 1.18 28 11.2 270 0 0 2025-Oct-27 07:04.38 wrightsnft' Right-Suite®Universal 2023 23 0 01 RSU62085 Page 6 ACCA ...8\Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc = MJ8 Front Doorfaces: E Job: Date: October 16, 2025 By: Rapid Creek Mechanical +++ wrightsoft- Component Constructions wic Project Inf• • For: Luis Vargas, UnityMountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (T) - Wi nd speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Construction descrirltions Or Area U-value Insul R Rg HTM Loss Clg FfTM Gain n ft' Btuh/ftz-OF ft'-°F/Btuh Btuh/ft2 Btuh Btuh/ft' Btuh Walls (none) Partitions 59 0 0 0 0 0 0 12C-Osw Windows (none) Doors (none) Ceilings Attic cel ing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 26 0.022 49.0 int fnsh Floors CIF floor, frm fir, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 26 0.312 150 wrightsoft Right -Suite® Universal 2023 23 0.01 RSU62085 jCCA . 8\Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc = MJ8 Front Doorfaces: E 1.58 41 1.18 30 11.2 288 0 0 2025-Oct-27 07:04:38 Page 7 + wrightsoft' Component Constructions Laundry Project Information For: Luis Vargas,UnityMountainBuilders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (° F) - Wi nd speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: Octobe r 16, 2025 By: Ra pid C ree k Me chan ical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Construction descrirnftions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain M � ft' Btuh/ft'-°F ft'-°F/Btuh Bluh/ft' Btuh Bluh/W Btuh Walls (none) Partitions 12 C-Osw Windows (none) Doors (none) Ceilings Attic cei ing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr, floor, frm fir, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 110 0 0 0 0 0 0 79 0.022 49.0 1.58 125 1.18 94 79 0.312 15.0 11.2 888 0 0 2025-Oct-27 07:04:38 ff �°�F Wf Igh>kSaft' Right -Suite® Universal2023 23.0 01 RSU62085 Page 8 .�M - 8\Documents\Wrightsoft HVAC\310 Eagle Ridge.rup Calc = MJ8 Front Door faces: E + wrightsoft- Component Constructions Living Project Inf• • For: Luis Vargas, UnityMounfain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (T) - Wi nd s peed (m ph) 15.0 Indoor: Ind cor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Or Area U-value Ins ul R Mg IirM Loss Clg KrM Gain Construction descriptions f6 Btuhlftl-'F 82-'F/Btuh Btuh/t' Biuh Btuh/R' Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" n 19 0.065 21.0 4.68 89 1.24 24 board int fnsh, 2"x6" wood frm, 16" o.c. stud s 191 0.065 21.0 4.68 894 1.24 238 gypsum w 203 0.065 21.0 4.68 948 1.24 252 all 413 0 065 21.0 4.68 1930 1.24 513 Partitions 12C-Osw Windows 1 D-c2ov. 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1 /4" s thk; 6.67 ft head ht w w all Doors 11 PO: Door, mtl pur core type s Ceilings Attic ceiling, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Fir floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 173 0 0 0 0 0 0 45 0.570 0 41.0 1847 23.8 1073 3 0.570 0 41.0 103 659 165 45 0.570 0 41.0 1847 23.8 1073 93 0.570 0 41.0 3796 25.0 2311 24 0.290 10.5 20.9 501 5.70 137 451 0.022 49.0 1.58 715 1.18 535 451 0 312 15.0 11.2 5070 0 0 2025-Oct-27 07:04:38 �= wrFgiF�rsnrt' Right -Suite® Universal 2023 23.0.01 RSU62085 Page 9 MCA ...8\1Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc = MA Front Doorfaces: E + wrightsoft- Component Constructions Kitchen Proiect Information For: Luis Vargas, Un ityMountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Or2nd Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (° F) - Wind speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Or Area U-value Insul R Htg HTM Loss Clg HTM Gain Construction descri„ tlOn$ r ft' Btuh/ft2-OF ft OF/Btuh Btuh/W Btuh Btuh/R' Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" n 116 0.065 21.0 4.68 541 1.24 144 board int fnsh, 2"x6" wood frm, 16" o.c. stud w 110 0.065 21.0 4.68 512 1.24 136 gypsum all 225 0.065 21.0 4.68 1053 1.24 280 Partitions (none) Windows 1 D-c2ov 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1 /4" gap, 1 /4" w 11 0.570 0 41.0 462 65.9 741 thk; 6.67 ft head ht Doors n 48 0.290 10.5 20.9 1002 5 70 274 11 PO: Door, mtl pur core type Ceilings Attic celTing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 403 0.022 49.0 1 58 638 1.18 477 int fnsh Floors Fir floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul 403 0.312 150 11.2 4521 0 0 2025-Oct-27 07:04:38 wlrig.htsoft- Right -Suite® Universal 2023 23 0.01 RSU62085 Page 10 , CCA ...8\Documents\Wrightsoft HVAC\310 Eagle Ridge rup Calc = MJ8 Front Door faces: E + wrightsoft` Component Constructions Master Bed For: Luis lfargas, UnityMountain Builders 310 Eagle Ridge Dr., Parachute, CO81635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 °N Outdoor: Heating Dry bulb (T) -2 Dailyrange (T) - Wet bulb (° F) - Wi nd speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Or Area U-value Insul R Htg HTM Loss Clg HTM Gain Construction descriptions ft' Btuh/fF--'F ft'-'F/Bt°h Btuh/ft' Btuh Bt°h/fF 6tuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8'. n 104 0.065 21.0 4.68 488 1.24 130 board int fnsh, 2"x6" wood frm, 16" o.c. stud w 93 0.065 21.0 468 435 1 24 116 gypsum all 197 0.065 21.0 4.68 923 1.24 246 Partitions (none) Windows 1 D-c2ov: 2 glazing, clr outr. air gas. vnl frm mat, cir innr, 1/4" gap. 1/4" n thk; 6.67 ft head ht w al! Doors (none) Ceilings Attic celTing, asphalt shingles roof mat, r-49 cell ins, 5/8" gypsum board int fnsh Floors Fir Floor, frm fir, 12" thkns, hrd wd fir fnsh, tight crwl ovr, 05 wall insul 30 0.570 0 41.0 1231 238 715 30 0.570 0 41.0 1231 65.9 1976 60 0 570 0 41.0 2462 44.9 2692 239 0.022 49.0 1.58 378 1.18 283 239 0.312 15.0 11.2 2680 0 0 2025-Oct-27 07:04:38 �T Wright ---Oft' Right -Suite@) Universal 2023 23.0 01 RSU62085 Page 11 ACCK ... 8\Docu ment s\Wrig htsof t HVAC\310 Eagle Ridge rup Calc = MJ8 Front Door faces: E + wrightsoft, Component Constructions Master Closet For: Luis Vargas, UnityMountain Builders 310 Eagle Ridge Dr., Parachute, C081635 Location: Grand Junction Regional, CO, US Elevation: 4858 ft Latitude: 39 ° N Outdoor: Heating Dry bulb (T) -Z Dailyrange (T) - Wet bulb (° F) Wi nd speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 98 Infiltration: 28 ( H ) Method 61 Construction quality 7.5 Fireplaces Job: Date: October 16, 2025 By: Rapid Creek Mechanical Heating Cooling 70 75 72 23 50 50 60.9 -39.0 Simplified Average 1 (Average) Construction descrir„ltions or Area U-value Insul R Kg KrM Loss Clg KrM Gain r ft, Btuh/ft'-°F ft'-°F/Btuh Btuh/ff Btuh Btuh/ft' Btuh Walls 12F-Osw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings Attic celTing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Fir floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crwl ovr, r-15 wall insul w 90 0.065 210 4.68 421 1.24 112 84 0.022 49.0 158 133 118 100 84 0.312 15.0 11.2 945 0 0 2025-Oct-27 07:04:38 wrl h[soft' Right-Suite®Universal 2023 23 0.01 RSU62065 Page 12 �� ... 8\Docu ments\Wrig htsof t HVAC\310 Eagle Ridge.rup Calc = MJ8 Front Door faces: E