HomeMy WebLinkAboutHUD Determinations and Compliance FindingT"015� 'rk4g- U wo�5 w %Jwkqrls
U.S. Department of Housing and Urban
Development
rr �I r 451 Seventh Street, SW
Washington, DC 20410
oe"'oe www.hud.gov
espanol.hud.gov
Environmental Assessment
Determinations and Compliance Findings for HUD -assisted Projects
24 CFR Part 58
Project Information
Project Name: Aster Place
Responsible Entity: Garfield County
Grant Recipient (if different than Responsible Entity): Lincoln Avenue Communities
State/Local Identifier:
Preparer: John Leybourne, Planner III
Certifying Officer Name and Title: TBD
Consultant (if applicable): Partner Engineering and Science, Inc. — 25-486627.2
Direct Comments to: John Leybourne, Planner III
Project Location: SWC of South Battlement Parkway and Stone Quarry Road, Parachute
Colorado, 81635
Additional Location Information:
The subject property is located on the southwestern corner of the South Battlement Parkway and
Stone Quarry Road intersection within a residential and commercial area of Garfield County,
Colorado.
The adjoining properties consist of Willow Park Apartments to the north across South Battlement
Parkway; US West Communications to the northeast across the intersection of South Battlement
Parkway and Stone Quarry Road; Maverik Adventure's First Stop to the east across Stone Quarry
Road; Grand Valley Fire Protection District to the southeast across Stone Quarry Road; Dollar
General and condominiums to the south; and vacant land to the west across Battlement Creek Trail.
Description of the Proposed Project [24 CFR 50.12 & 58.32; 40 CFR 1508.25]:
The subject property is proposed for the development of a multi -tenant, affordable rental housing
complex. The development will consist of two (2), split two- and three-story apartment buildings
consisting of 58 total residential units, a single -story clubhouse, a pavilion including playground
equipment, a 97-space parking area including 6 accessible spots, and all supporting development
(roadways, garbage enclosures, signage, sidewalks, utilities, etc.). The unit breakdown will include
14 one -bedroom units, 28 two -bedroom units, and 16 three -bedroom units. The spread of
affordability anticipated for the proposed units will include eight (8) units directed to those making
30% of the Area Median Income (AMI), five (5) units directed to those making 40% of the AMI,
four (4) units directed to those making 50% of the AMI, fifteen (15) units directed to those making
60% AMI, fifteen (15) units directed to those making 70% AMI, and eleven (11) units directed to
those making 80% of the AMI.
This report is being prepared in support of the distribution of eight (8) Project -Based Vouchers for
the proposed development through the Housing Authority of Garfield County.
Statement of Purpose and Need for the Proposal [40 CFR 1508.9(b)]:
The subject property is proposed for new construction with PBV financing. The development will
meet Garfield County's 2030 Comprehensive Plan that has objective focused on providing a range
of housing types, costs, and tenancy options that ensure current and future residents affordable
housing opportunities in safe and efficient residential structures. In addition, one of the key points
is that there are opportunities for greater collaboration between Garfield County Housing
Authority and other involved county agencies as well as creating more availability of workforce
and affordable housing directly linked to attracting and retaining a qualified work force. The
policies in the Comprehensive plan include ensuring that current land use planning objective
promote affordable housing and encouragement of affordable workforce housing near regional
centers. In the 2020 update of the Comprehensive Plan, the estimated housing needs by Area
Median Income (AMI) in the New Castle to Parachute Area of Garfield County is focused on
AMI% of 121% and above. The proposed project will cap AMI% at 80%, allowing for much
needed affordable housing in the area.
The property is needed to provide multi -tenant affordable housing and will create an affordable
rental housing option in close proximity to high quality transit and a living environment that is
safe, lively, and creates a strong sense of community. The proposed units and project amenities
will be reasonable compared to the direct competition in the market area. The unit type will
facilitate strong leasing activity and will provide 100 percent affordable housing for the immediate
area.
Existing Conditions and Trends [24 CFR 58.40(a)]:
The subject property currently consists of approximately 6.38 acres of vacant land with no current
onsite operations. According to available historical sources, the subject property was agricultural
with a farmstead in the western portion from as early as 1937 until 1993. The farmstead was
removed by 2005, and the subject property has appeared to be vacant land since 2009.
The surrounding area of the subject property consists of residential developments to the immediate
north and southwest, and commercial developments to the east and southeast. The proposed project
will provide an affordable housing opportunity in an area where such opportunities are limited,
near major arterial roadways for Parachute, Colorado, that provide access to highways, commercial
shopping, and career opportunities.
Funding Information
Grant Number HUD Program Funding Amount
TBD Project -Based Voucher $2,469,120
Estimated Total HUD Funded Amount: $2,469,120
Estimated Total Project Cost (HUD and non -HUD funds) [24 CFR 58.32(d)]: $25,116,812
Compliance with 24 CFR 50.4, 58.5, and 58.6 Laws and Authorities
Record below the compliance or conformance determinations for each statute, executive order, or
regulation. Provide credible, traceable, and supportive source documentation for each authority. Where
applicable, complete the necessary reviews or consultations and obtain or note applicable permits of
approvals. Clearly note citations, dates/names/titles of contacts, and page references. Attach additional
documentation as appropriate.
Compliance Factors:
Are formal
Compliance determinations
Statutes, Executive Orders,
compliance
and Regulations listed at 24
steps or
CFR §58.5 and §58.6
mitigation
required?
STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR 50.4
and 58.6
Airport Hazards
Yes No
The project site is not located within 15,000 feet
®
of a military airport or 2,500 feet of a civilian
24 CFR Part 51 Subpart D
airport.
The project is in compliance with Airport Hazards
requirements.
Coastal Barrier Resources
Yes No
This project is located in a state that does not
El ®
contain CBRS units.
Coastal Barrier Resources Act, as
amended by the Coastal Barrier
Therefore, this project is in compliance with the
Improvement Act of 1990 [16
Coastal Barrier Resources Act.
USC 3501
Flood Insurance
Yes No
The structure or insurable property is not located
®
in a FEMA-designated Special Flood Hazard
Flood Disaster Protection Act of
Area.
1973 and National Flood
Insurance Reform Act of 1994
According to the Community Panel Number
[42 USC 4001-4128 and 42 USC
080205131513, dated January 3, 1986, the subject
5154a]
property is not located within a Special Flood
Hazard Area (SFHA). Garfield County is
currently updating all of their existing floodplain
maps; however, this information will not be
available until 41 Quarter 2025. Further
information has been requested from local and
state floodplain managers; however, as of the
issuance of this report, a response has not been
received.
A review of the online NFIP information indicates
that the town and county are active participants
within the NFIP. The community identification
numbers are as follows: Town of Parachute is
CID# 080215# and Garfield County is CID#
080205#.
The structure or insurable property is not located
in a FEMA-designated Special Flood Hazard
Area. While flood insurance may not be
mandatory in this instance, HUD recommends
that all insurable structures maintain flood
insurance under the National Flood Insurance
Program (NFIP).
The project is in compliance with flood insurance
requirements.
STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR 50.4
& 58.5
Clean Air
Yes No
According to the USEPA Green Book and
®
NEPAssist website, the subject property is not
Clean Air Act, as amended,
located in a non -attainment or maintenance area
particularly section 176(c) & (d);
for any US EPA National Ambient Air Quality
40 CFR Parts 6, 51, 93
Standard (NAAQS) criteria air pollutants.
The subject property is an approximate 6.38-acre
plot of vacant land that is planned for the new
development of a multi -tenant residential
complex. No industrial uses are planned for the
subject property and development of the subject
property will follow all Town of Parachute and
Garfield County permitting requirements.
Development of the proposed multi -tenant project
will not result in emission levels of criteria
pollutants, including de minimis levels.
Because neither the immediate area nor Garfield
County are identified as a whole designated area
for actions by the EPA, there are no State
Implementation Plans (SIPS) for the subject
property area to regulate air quality.
The project is in compliance with the Clean Air
Act.
Coastal Zone Management
Yes No
This project is located in a state that does not
❑ ®
participate in the Coastal Zone Management
Coastal Zone Management Act,
Program.
sections 307(c) & (d)
Therefore, this project is in compliance with the
Coastal Zone Management Act.
Contamination and Toxic
Yes No
Site contamination was evaluated as follows:
Substances
®
ASTM Phase I ESA, ASTM Vapor Encroachment
Screening. On -site or nearby toxic, hazardous, or
24 CFR Part 50.3(i) & 58.5(i)(2)
radioactive substances that could affect the health
and safety of project occupants or conflict with
the intended use of the property were not found.
A Phase I Environmental Site Assessment (ESA)
was completed in concurrence with this
assessment that did not identify any Recognized
Environmental Conditions (RECs), Controlled
RECs (CRECs), or Historical RECs (HRECs) in
connection with the subject property. Nearby
identified properties were written off based on
regulatory status and/or time of operation. Of
note, a Business Environmental Risk (BER) was
identified in relation to a former residence located
on the subject property and soil management
considerations should be taken into consideration
during development and any encountered
subsurface features associated with the former on -
site improvements should be properly removed.
A Vapor Encroachment Screen (VES) was
completed by Partner as part of the Phase I ESA.
The VES was performed using Tier I non-
invasive screening pursuant to ASTM E2600-23
Standard Guide for Vapor Encroachment
Screening on Property Involved in Real Estate
Transactions, Section 8. Based on the findings of
the Tier I Screen and VES, vapor intrusion can be
ruled out because a VEC does not or is not likely
to exist. As such no further assessment is
recommended.
With regards to additional nuisances, there were
no fall hazards observed on or adjoining to the
subject property; however, a high voltage
powerline was identified in the vicinity of the
subject property. According to architectural
drawings, the proposed structures are located
approximately 500 feet from the powerline
easement, which is a greater distance than the
height of the powerline towers. Therefore, this
powerline is not considered a fall hazard.
Various producing oil wells were identified
within the vicinity of the subject property;
however, the nearest of these wells is located
approximately 2,085 feet west of the subject
property. According to MAP Guidelines, no
residential structures may be within 300 feet of a
drilling site. Based on the distance of the nearest
wells from the subject property, these wells are
not considered to be a hazard to the subject
property.
Endangered Species
Yes No
This project will have No Effect on listed species
IJ ®
because there are no listed species or designated
Endangered Species Act of 1973,
critical habitats in the action area.
particularly section 7; 50 CFR
Partner reviewed the US Fish &Wildlife Service
Part 402
(USFWS) Planning and Conservation (IPaQ
database for threatened and endangered species
and critical habitats. A summary of the IPaC
database indicates three (3) endangered species,
one (1) proposed endangered, five (5) threatened
species, one (1) proposed threatened species, and
one (1) experimental population, non -essential
species and no critical habitats within the project
area. Based on Partner research and analysis of
habitats for the identified species, as well as
environmental condition occurring on the subject
property, which is currently vacant land with little
to no vegetation, the presence of the listed species
is not likely and can be ruled out. Additionally,
the subject property does not provide proper
location for migratory birds as there are no trees,
covered areas, or available land for foraging on
the subject property. As such, no additional
assessment is warranted.
This project is in compliance with the Endangered
Species Act.
Explosive and Flammable Yes No Based on the site reconnaissance, no existing
Hazards El ® industrial facilities handling explosive or fire -
prone materials such as liquid propane, gasoline,
24 CFR Part 51 Subpart C diesel fuel of 100-gallons or larger are adjacent to
and/or visible from the subject property.
Multiple active oil wells are located within one
mile of the subject property and the sites include
holding tanks for the crude oil that is pumped
from the previously identified wells. There are a
total of six aboveground storage tank (AST)
Areas within the one -mile radius of the subject
property. Each of the tank areas was noted with
within a dike.
The closest tank area, AST Area 1, is located
approximately 2,056 feet to the west of the subject
property. The dike area around the AST had a
width of 48.8 feet and a length of 84.99 feet. The
Acceptable Separation Distances (ASDs) for the
tank area is as follows:
■ ASD for Thermal Radiation for People
(ASDPNPD): 280.37 feet;
• ASD for Thermal Radiation for Buildings
(ASDBNPD): 51.22 feet.
Results indicate that the observed ASTs are
located at an acceptable distance from the
proposed subject property buildings and outdoor
gathering areas.
ASD calculations for the AST Areas 2 through 6
also did not depict the subject property within the
ASDs for any of the tank areas.
According to the National Pipeline Mapping
System, there is one natural gas pipeline located
within one mile of the subject property, located
approximately 0.653 miles (3,450 feet) to the
south-southeast. The pipeline is owned and
operated by Public Service Co of Colorado.
According to Xcel Energy, the pipeline has a
diameter of 6 inches with a pressure of 520
pounds per square inch (PSI).
According to HUD's Pipeline Impact Potential
Evaluation (PIPE) Tool:
• the pipeline potential impact radius (in
feet) for thermal radiation for buildings is
67 feet;
+ the pipeline potential impact radius (in
feet) for thermal radiation for people is
313 feet; and
■ the pipeline potential impact radius in
feet for blast overpressure is 217 feet.
As such, the subject property is located at an
acceptable distance from this natural gas pipeline.
In addition, a 50' gas pipeline easement was
depicted to the southwest of the subject property.
No information related to this pipeline was
available via NPMS. According to Xcel Energy,
the pipeline has a diameter of 2 inches and has a
pressure of 520 PSI. Utilizing HUD's PIPE tool:
• the pipeline potential impact radius (in
feet) for thermal radiation for buildings is
23 feet;
• the pipeline potential impact radius (in
feet) for thermal radiation for people is
105 feet; and
■ the pipeline potential impact radius in
feet for blast overpressure is 65 feet.
The nearest edge of the pipeline easement with no
structures between it and the nearest proposed
structure is located approximately 390 feet away.
Based on the calculated distances, the proposed
structures and gathering areas are located at an
acceptable distance from the natural gas pipeline
depicted in the structural drawings.
The project is in compliance with explosive and
flammable hazard requirements.
Farmlands Protection
Yes No
This project has the potential to convert
®
agricultural land to a non-agricultural use.
Farmland Protection Policy Act
However, an exemption applies.
of 1981, particularly sections
The subject property consists of 6.38 acres of
1504(b) and 1541; 7 CFR Part
vacant land within a developed area and because
658
the project does not convert agricultural land to
non-agricultural land, the Federal Farmland
Protection Policy Act (FPPA) is not triggered.
According to the USDA Natural Resources
Conservation Service Web Soil Survey, the onsite
soils are rated as Farmland of Statewide
Importance with a small portion designated as Not
Prime Farmland. However, the subject property is
located within a designated urban area, per the
Geography Division, US Census Bureau. As such,
an exemption applies, and no additional action is
warranted for FPPA compliance.
The project is in compliance with the Farmland
Protection Policy Act.
Floodplain Management
Yes No
This project is not located within the FFRMS
®
floodplain.
Executive Order 11988,
According to the Community Panel Number
particularly section 2(a); 24 CFR
080205131513, dated January 3, 1986, the subject
Part 55
property is not located within the 100-year
floodplain/SFHA. No preliminary FEMA FIRM
(p-FIRM) or pending products are available for
the subject property at this time. Additionally,
regulatory floodways are not considered a hazard
for the subject property, including ingress and
egress, at this time.
HUD adopted the FEMA's Federal Flood Risk
Management Standard (FFRMS) on May 23,
2024. The compliance date for other HUD
programs is June 24, 2024. The FFRMS defines
an expanded floodplain that takes future flood risk
into account via three (3) methods: (1) Climate -
informed science approach (CISA), (2) 0.2
percent annual chance of flooding (PFA) and (3)
Freeboard Value Approach (FVA).
According to Caitlin McDaniel, PE, CFM,
Floodplain Mapping Program Manager with the
State of Colorado, the State is currently updating
all of their existing floodplain maps, and this
information will not be available until 4' Quarter
2025. Further information has been requested
from local and county floodplain managers;
however, as of the issuance of this report, a
response has not been received. Per the HUD
Multifamily Accelerated Processing (MAP)
Guide, flood maps used to make a determination
for floodplain management must be approved by
either FEMA or the floodplain management
agency. In addition, per the applicant information,
the proposed site plan for the subject property has
been approved by municipal entities who also
defer to regional floodplain mapping tools. As
such, floodplains are not considered to be a
concern for the subject property at this time.
Historic Preservation Yes No Review of online information indicates the
❑ ® project is not listing on or eligible for listing in the
National Historic Preservation National Register of Historic Places individually
Act of 1966, particularly sections or as part of a historic district. Based on the
106 and 110; 36 CFR Part 800 project's scope of work, which includes new
construction and associated ground disturbance,
an Archaeological Desktop Assessment has been
prepared for reference in a State Historic
Preservation Office (SHPO) consultation letter.
Tribes with interest in the project area, according
to the Tribal Directory Assessment Tool (TDAT),
include the Apache Tribe of Oklahoma; Fort
Belknap Indian Community of the Fort Belknap
Reservation of Montana; and the Shoshone -
Bannock Tribes of the Fort Hall Reservation. Of
note, according to available online mapping, the
closest reservation is the Uintah and Ouray
Reservation, which is located approximately 55
miles west of the subject property in Unitah
County, Utah, and may also need to be contacted
as the subject property is within an area that is
identified as a traditional territory of the Nuuchiu
(Ute).
Consultation with the SHPO and tribal entities
was initiated by the Responsible Entity on
September 5, 2025, through the United States
Postal Service. According to the Certified Mail
Receipts, the most recent letter was received on
September 18. As such, the mandatory minimum
30-day response period ended on October 18,
2025. No responses were received in this time
period.
As such, this project is in compliance with
Historic Preservation Requirements.
Noise Abatement and Control
Yes No
A Noise Assessment was conducted. The noise
®
level was Normally Unacceptable: 69 dB.
Noise Control Act of 1972, as
A total 10-year day -night sound level (DNL) was
amended by the Quiet
calculated for multiple noise assessment locations
Communities Act of 1978; 24
(NALs), as depicted within the attached
CFR Part 51 Subpart B
assessment, combining roadways with available
traffic data within 1,000 feet; railways within
3,000 feet; and airports/military airfields within a
15-mile radius of the subject property, where
applicable. A total of four (4) NALs were
assessed: NALs #1-2 (Northern Building): 68 dB;
NAL #3 (Southern Building): 65 dB; and NAL#4
(Playground): 69 dB. Mitigation is not necessary
for NAL#3 (Southern Building) as the noise is
deemed acceptable per HUD guidelines.
With respect to NALs 1-2, mitigation has been
achieved through the completion of the Sound
Transmission Classification Assessment Tool
(STraCAT) assessment that is appended herein.
Barrier attenuation calculations were additionally
completed and determined that the proposed
barriers will effectively reduce exterior noise to
acceptable levels for the proposed outdoor
gathering area (playground).
Sole Source Aquifers Yes No The project is not located on a sole source aquifer
Safe Drinking Water Act of 1974, ® area.
Based on a review of the Designated Sole Source
as amended, particularly section 1424(e); 40 CFR Part 149 Aquifers National Map, published by the USEPA,
the subject property is not located in a sole source
aquifer recharge area. Moreover, the water supply
for the subject property will be tied into the public
utilities; therefore, it will not impact existing
groundwater conditions.
The project is in compliance with Sole Source
Aquifer requirements.
Wetlands Protection Yes No The project has the potential to impact on- or off -
Executive Order 11990,
® site wetlands.
particularly sections 2 and 5 According to the USFWS National Wetlands
Inventory website, there are federally regulated
wetlands along the south -southwestern property
boundary that are associated with a tributary of
the Colorado River. The wetlands are identified as
a seasonally flooded, streambed, intermittent
riverine (R4SBC). The proposed project includes
construction activities such as grading and
excavation that has the potential to impact this
wetland.
Wild and Scenic Rivers
Wild and Scenic Rivers Act of
1968, particularly section 7(b)
and (c)
ENVIRONMENTAL JUSTICE
Environmental Justice
Executive Order 12898
A Preliminary Wetland Determination prepared
by Partner Engineering and Science, Inc. on July
11, 2025, did not identify wetlands on the subject
property. As such, no impacts to wetlands are
anticipated with the proposed project.
This project is not within proximity of aNWSRS
Yes No river.
❑ ® No unique natural features or areas were
identified within visible distance of the subject
property. Unique natural features or areas include
bluffs, cliffs, public or private scenic areas, and/or
special natural resources on the property or in the
vicinity of the property. The subject property is
not located within a one -mile radius of a
designated Wild and Scenic River; therefore,
consultation review by the National Park Service
is not required. The Wild and Scenic Rivers Act
protects selected rivers in a free -flowing
condition and prohibits federal support for
activities that would harm a designated river's
free -flowing condition, water quality, or
outstanding resource values.
The project is in compliance with the Wild and
Scenic Rivers Act.
Yes No The subject property is NOT located within an
❑ ® Opportunity Zone.
Executive Order 14173 - Ending Illegal
Discrimination and Restoring Merit -Based
Opportunity was released on January 21, 2025
and effectively rescinded Executive Order 12898
- Federal Actions to Address Environmental
Justice in Minority Populations and Low -Income
Populations, dated February 11, 1994. As such, an
evaluation of Environmental Justice is no longer
warranted.
Environmental Assessment Factors [24 CFR 58.40; Ref. 40 CFR 1508.8 &1508.27] Recorded below
is the qualitative and quantitative significance of the effects of the proposal on the character, features and
resources of the project area. Each factor has been evaluated and documented, as appropriate and in
proportion to its relevance to the proposed action. Verifiable source documentation has been provided and
described in support of each determination, as appropriate. Credible, traceable and supportive source
documentation for each authority has been provided. Where applicable, the necessary reviews or
consultations have been completed and applicable permits of approvals have been obtained or noted.
Citations, dates/names/titles of contacts, and page references are clear. Additional documentation is
attached, as appropriate. All conditions, attenuation or mitigation measures have been clearly
identified.
Impact Codes: Use an impact code from the following list to make the determination of impact
for each factor.
(1) Minor beneficial impact
(2) No impact anticipated
(3) Minor Adverse Impact — May require mitigation
(4) Significant or potentially significant impact requiring avoidance or modification which may
require an Environmental Impact Statement
Environmental Impact -7
Assessment Factor Code
Impact Evaluation
LAND DEVELOPMENT
Conformance with
2
The subject property is proposed for the development of a multi -
Plans / Compatible
tenant, affordable rental housing complex. The development will
Land Use and Zoning
consist of two (2), split two/three-story apartment buildings
/ Scale and Urban
consisting of 58 residential units, a single -story clubhouse, a
Design
pavilion including playground equipment, a 97-space parking area
including 6 accessible spots, and all supporting development
(roadways, garbage enclosures, signage, sidewalks, utilities, etc.).
These plans conform with the 2030 Garfield County
Comprehensive Plan, which is committed to provided quality
affordable housing.
The subject property is currently zoned "PUD-MDR" for planned
unit development medium density residential by Garfield County.
The subject property is located within the Battlement Mesa PUD.
At this time, this district allows for multi -family residential
construction. No zoning violations are foreseen with relation to
the proposed project.
According to historical and current site information, the subject
property is considered a suitable area as the subject property has
not been utilized as a dump, sanitary landfill, or mine waste
disposal area.
Furthermore, no unusual conditions were identified at the subject
property during the site reconnaissance. The impact on
surrounding existing native or non-invasive vegetation and
wildlife will be minimal. None of the reasonably foreseeable
aspects of the proposed project or future use plans for the site
conflict with the community's vision for its future.
Soil Suitability/
2
The 2022 United States Geological Survey (USGS) Parachute,
Slope/ Erosion/
Colorado Quadrangle 7.5-minute series topographic map was
Drainage/ Storm
reviewed for this assessment. According to the contour lines on
Water Runoff
the topographic map, the subject property is located at
approximately 5,401 to 5,425 feet above mean sea level (MSL).
The contour lines in the area of the subject property indicate the
area has a moderate slope to the west-northwest.
Based on information obtained from the United States Department
of Agriculture (USDA) Natural Resources Conservation Service
Web Soil Survey online database, the subject property is mapped
as Potts Loam and Potts-Ildefonso complex. No evidence of
erosion or sedimentation was observed during the site
reconnaissance.
Construction of the proposed project would involve grading and
earth moving activities as well as construction of the project
components. Construction would result in the temporary
disturbance of soil and would expose disturbed areas to potential
storm events. This exposure could generate accelerated runoff,
localized erosion, and sedimentation.
A Geotechnical Report was prepared by Partner Engineering and
Science, Inc. for the subject property and dated November 13,
2024. The investigation included the advancement of 14 soil
borings to 31.5 feet below ground surface and three (3) infiltration
tests for soil observation. Onsite soils were found to consist of
silty gravel and sandy gravel. Groundwater was not encountered
during boring advancement. The investigation found that some of
the onsite soils may be suitable for reuse as engineered fill in
structural areas.
According to the Aster Place Project Manual, dated February
2025, the general contractor in charge of following a Stormwater
Pollution Prevention Plan (SWPPP) to limit erosion and
sedimentation during construction activities. Additional erosion
controls will include on -land silt fences, erosion logs, erosion
control blankets, and storm drain inlet protection. A NPDES will
also need to be filed prior to potential discharge activities.
Hazards and
1
Radon: Review of the USEPA Radon Zone Map and county
Nuisances
information indicates the subject property is located within Radon
including Site Safety
Zone 1, where typical radon levels are greater than 4 pCi/L. Based
and Noise
on the proposed development activities, radon mitigation is
warranted as part of new construction activities. Per HUD
guidelines, radon mitigation activities are required to be
implemented during the construction phase of the subject property
per CC-1000, latest edition, Soil Gas Control Systems in New
Construction of Buildings. The guidelines require soil gas control
for all portions of the foundation system and post -construction
testing will be required by a licensed, radon professional.
Site Generated Noise: Development of the subject property will
result in short-term noise during the daylight hours. The proposed
use of the subject property (residential) upon completion of
construction, will not result in elevated levels of noise.
Other Nuisances: No natural hazards, air pollution generators,
man-made site hazards or nuisances were observed during the site
reconnaissance.
SOCIOECONOMIC
Employment and
1
Based on 2023 numbers, the economy of Garfield County,
Income Patterns
Colorado employs approximately 33,982 people with the largest
industries being Construction, Health Care & Social Assistance,
Retail Trade, Accommodation & Food Services, and Educational
Services. The cost of living in Garfield County is 1.2% higher than
the state average and 21.9% higher than the national average.
Attainable affordable housing for the workforce is in short supply.
Garfield County has an unemployment rate of 3.5%, compared to
the US average of 4.2%, as of April 2025. According to 2023 data,
the median household income of a Garfield County resident was
$86,172 annually, while the US average was $80,610. Please note
that the above information should be verified with a Market Study,
which was not provided for Partner to review.
No direct or indirect displacement is associated with the proposed
project. No people will be displaced. No jobs will be destroyed or
relocated. The proposed development has the potential to create
permanent opportunities associated with facility maintenance and
management. The proposed development will not have an adverse
effect on the community or neighborhoods.
Source: https://datausa.io/profile/geo/garfield-county-co
Demographic
According to 2024 information, the population of Garfield County
Character Changes,
was 63,167. The median age of Garfield County is 37.2, compared
Displacement
to the US median age of 38.7. The poverty rate in Garfield County
is 9.1%, compared to the US average of 11.1%. The general
demographic makeup of Garfield County is White (Non -
Hispanic) — 63.6%, Black — 1.6%, American Indian and Alaskan
Native —1.9%, Asian —1 %, Native Hawaiian and Pacific Islander
— 0.2%, Hispanic or Latino — 32.8%.
The proposed project does not contribute to reducing or
significantly altering the racial, ethnic, or income segregation of
the area's housing. The proposed project does not create a
concentration of low-income or disadvantaged people in violation
of HUD site and neighborhood standards.
Source: htts://datausa.iol rof lel eol field -coup -co
Environmental
N/A
Executive Order 14173 - Ending Illegal Discrimination and
I
Justice
Restorin Merit -Based Opportunity was released on January 21,
2025, and effectively rescinded Executive Order 12898 - Federal
Actions to Address Environmental Justice in Minority
Populations and Low -Income Populations, dated February 11,
1994. As such, an evaluation of Environmental Justice is no longer
warranted.
COMMUNITY FACILITIES AND SERVICES
Educational and
2
Due to the relatively small size of the Parachute area, there are
Cultural Facilities
only four (4) public schools including one elementary, one
middle, and one high school. The subject property is located
within the Garfield County School District No. 16, which serves
the town of Parachute and the surrounding area.
According to the Garfield County School District No. 16 website,
parents of students may complete enrollments packets for students
who meet standard criteria for age, behavior, and immunization
(IiHps://www.garfield 16_or arents/enrollment). The school
system currently serves 1,171 students in grades PK-12. Based on
the number of units proposed for the subject property (58), and the
total number of students within the Garfield County School
District No. 16, the maximum additional school -aged children at
the proposed project would comprise a negligible increase to
student enrollment and is not expected to exceed the capacity of
the existing or planned school facilities in the surrounding area.
Several cultural facilities are located within the surrounding area.
Cultural facilities in the surrounding area of the subject property
include the Rifle Heritage Center & Museum, the Western
Museum of Mining and Industry, and the Glenwood Springs
Historic Society and Frontier Museum. Based on the proposed
residential unit count (58 units), the proposed project will result in
an incremental increase in the demand for cultural facilities or
require additional/alternative facilities to ensure safety and
suitable access to/from educational or cultural facilities. The
proposed project is filling a need for additional housing units in
the community and will not substantially increase the
community's population that would result in crowing of
educational or cultural facilities.
Commercial
1
The subject property is located within reasonable distance of
Facilities
services and commercial shopping areas that will meet the needs
of future tenants in terms of affordability. Specifically, the subject
property is within a two-mile distance to commercial facilities
including Dollar General, Clark's Market and Pharmacy, Family
Dollar, various restaurants, beauty salons, clothing stores, banks,
and gyms. The project will not adversely impact or displace
existing retail and commercial services. The proposed project is
not considered a concern and will not require additional
commercial facilities. Furthermore, the placing of eligible
residents in more attainable housing for mixed income levels
allows for more disposable income for spending on hard and soft
goods.
Health Care and
2
Based on online information, emergency health services are
Social Services
available within reasonable proximity to the proposed project.
Battlement Mesa Medical Center / Grand River Health Clinic
West is located within a nearby radius; however, the nearest
hospital is located in Rifle, approximately 20 minutes away.
Social services, if warranted, will be provided by governmental
social service agencies, public or private groups. The project
would result in an incremental increase in demand for health care
and social services but would not be expected to have adverse
impacts on such services given that the project would likely serve
existing area residents would be relatively small in size. The
development of this project is not considered a concern and will
not require additional healthcare facilities.
Solid Waste
2
The project development will generate construction debris that
Disposal / Recycling
will be managed by the development team and disposed offsite in
accordance with applicable standards. Upon completion of
construction activities, general household solid waste will be
generated from the proposed project. Solid waste disposal will
reportedly be provided by an independent solid waste disposal
contractor.
The Garfield County Landfill receives refuse from the Town of
Parachute. The trash generated at the subject property will likely
consist of general refuse including paper, cardboard, cooking
waste, and general consumer -use plastic material. As such, the
residential use of the subject property is not expected to
substantially increase the amount of refuse/trash generated at the
subject property and is not expected to materially increase the
amount of received by the Garfield County Landfill.
Waste Water /
2
Domestic wastewater is not currently generated at the subject
Sanitary Sewers
property. No industrial processes are currently performed at the
subject property. The Town of Parachute services the subject
property vicinity. No onsite septic systems are proposed for
development.
The onsite development will allow the Town of Parachute to meet
future flow and loading demands as well as regulatory
requirements. The new residential units will result in very minimal
impact on the designed capacity of the Parachute Water
Department. Positive effects are that storm water will be separated
from the sewage collection system that is maintained by the
municipality. No adverse effects from the proposed development
is applicable at this time.
Water Supply
2
Domestic wastewater is not currently generated at the subject
property. According to available information, a public water
system operated by the Town of Parachute Water Department
serves the subject property vicinity. The source of public water for
the Town of Parachute is surface water from the Colorado River
and groundwater wells under the direct influence of surface water.
According to the Town of Parachute Water Department 2024
Annual Water Quality Report, water supplied to the subject
property vicinity is in compliance with all State and Federal
regulations pertaining to drinking water standards, including lead
and copper. Based on the total number of new units proposed for
the subject property (58), the new residential units will result in
very minimal impact on the designed capacity of the municipal
sanitary sewer system.
Public Safety -
2
The proposed project will have minimal impact on the city and/or
Police, Fire and
county Police, Fire, and Emergency Medical Services. While the
Emergency Medical
addition of residential units will incrementally increase demand
on police and fire services, the proposed project is expected to
have a nominal increase on the existing public safety resources to
the area. Access routes for accessibility for emergency vehicles
and compliance with local regulations will be addressed by the
civil design team, per city/county building compliance. The
project meets the site access requirements for emergency vehicles,
including fire truck and ambulance.
Parks, Open Space
2
Parks, open spaces, and recreation areas within the surrounding
and Recreation
area include Parachute Ponds State Wildlife Area, Beasley Park,
Bill Patterson Wildlife Area, and Parachute/Battlement Mesa
Parks and Recreation as well as various other opportunities.
Further away are state parks such as Grand Mesa and Rifle Falls.
Passive and active recreational activities and cultural resources are
available for the subject property vicinity. Moreover, the proposed
project will include a children's playground. Based on the
inclusion of a children's recreation area at the proposed project
and large number of parks in the vicinity of the subject property,
the proposed project will not have an adverse effect on passive
and active recreational activities to include parks, recreational
areas and open spaces within the vicinity of the subject property.
Transportation and
2
The subject property will be accessed via Stone Quarry Road
Accessibility
along the eastern property boundary and Battlement Creek Trail
along the western property boundary. Based on the site
reconnaissance, the approaches to the subject property will be
convenient, safe, and attractive. Accessibility requirements will
be included within the proposed development per the civil design
plans. The subject property will provide residents with convenient
access to employment centers and recreational outlets
(commercial/retail shopping services). Additionally, the proposed
project is within walking distance of multiple bus stops. The
proposed project will not result in additional impact to the
transportation services.
NATURAL FEATURES
Unique Natural
2
No geological features that include rare or special social/cultural,
Features,
economic, educational, aesthetic, or scientific value were
Water Resources
identified on or adjoining to the subject property. As such, no
adverse impact to unique natural features is considered applicable
for the proposed development.
No visual or other indications of water quality problems on or near
the site were identified. The proposed project will include a storm
water runoff control/design. The proposed project will not involve
the discharge of non -sewage pollutants into surface water bodies
and will not limit the access to or quality of water for downstream
communities.
Vegetation, Wildlife
2
The proposed development will involve grading the land,
development of the subject building and seeding the soil with
grass, where applicable. No nuisance or non -indigenous species o
vegetation will be included within the proposed development. The
proposed project will not damage or destroy plant species that are
legally protected by state or local ordinances.
Other Factors
2
No other factors apply to this project. The site is not located near
any military bases, as such, a military presence does not appear
applicable.
CLIMATE AND ENERGY
Climate Change
N/A
Executive Order 14148 - Initial Rescissions of Harmful Executive
Impacts
Orders and Actions was released on January 20, 2025 and
effectively rescinded Executive Order 14008 - Tackling the
Climate Crisis at Home and Abroad, dated January 27, 2021. As
such, an evaluation of Climate Change is no longer warranted.
Energy Efficiency
1
The subject property will be designed to meet the National Green
Building Standard and Zero Energy Ready Homes. The project
will include the completion of a SEDI and evidence energy
efficiency features by achieving NGBS green designation.
Additionally, the developer plans to install Solar Photovoltaics on
the apartment roofs. The compliance will be overseen by Group
14.
Additional Studies Performed:
Phase I Environmental Site Assessment, prepared by Partner Engineering and Science, Inc.,
dated June 2025;
Noise Assessment, prepared by Partner Engineering and Science, Inc., dated June 2025;
Sound Transmission Classification Assessment Tool Report, prepared by Partner Engineering
and Science, Inc., dated June 2025;
Cultural Resources Desktop Review Summary Report, prepared by Partner Engineering and
Science, Inc., dated July 2025;
Preliminary Wetland Determination, prepared by Partner Engineering and Science, Inc., dated
July 2025
Field Inspection (Date and completed by):
April 2, 2025; Eric Breer, Project Assessor
List of Sources, Agencies and Persons Consulted [40 CFR 1508.9(b)]:
USFWS, USDA, Colorado DOT, County and City FOIA departments, as listed in the Phase I
ESA.
List of Permits Obtained:
Permits, reviews, and approvals required for construction activities will be issued by local,
city/county and state regulatory agencies with implementation by project contractor and
oversight by engineer/architect.
Public Outreach [24 CFR 50.23 & 58.43]:
In the course of conducting this environmental compliance review, no issues warranting NEPA-
related hearings or public meetings were revealed. Upon acceptance by the HUD Certifying
Official, the FONSI will be posed on a publicly available website for one year at:
https://www.hudexchange. info/programs/environmental-review/environmental-review-records/
Cumulative Impact Analysis [24 CFR 58.32]:
The proposed construction project will not adversely impact the surrounding area. This activity is
compatible with the existing uses in the area. There will not be any adverse impact on existing
resources or services to the area.
Alternatives [24 CFR 58.40(e); 40 CFR 1508.9]
Off Site Alternative: Consideration of an off -site alternative is not warranted because there are no
substantial adverse effects that would result from the project, or if potentially adverse effects were
identified, mitigation has been required to reduce those potentially adverse effects.
Reduced Project: Reducing the number of apartment units or the square footage of nonresidential
space would provide less affordable housing in the area. A reduced project with fewer units and a
smaller residential population would have similar environmental impacts as the proposed project
but would be slightly lower in magnitude. Reducing the number of affordable housing units would
not meet the purpose or need of the project, which includes objectives to accommodate a portion
of the citywide demand for affordable housing for all.
No Action Alternative [24 CFR 58.40(e)]:
The "no action" alternative was considered; however, no action would not meet the demand for
affordable/market rate units in the County. The demand for affordable/market rate housing in the
County and region has increased in the last few years. If not been given this housing opportunity,
the affordable/market rate households and prospective tenants for these properties will not be able
to meet their household needs. In addition, construction of a new apartment complex will visually
improve the image of the neighborhood and provide demand for goods and services in the area.
Summary of Findings and Conclusions:
The project would benefit the Town of Parachute and low-income residents by providing high -
quality affordable housing in a desirable area with access to commercial amenities, employment
opportunities, and all standard community services. Residents of the affordable housing project
would benefit from being in proximity to transportation corridors and activity centers which
would for provide opportunity for employment, social engagement, and commerce.
Because the project is within a developed area, the project would be adequately served by
utilities and public services. The project would conform to all applicable federal, state, and local
regulations associated with land use compatibility, air pollutant emissions, water quality,
geologic hazards, and related environmental resources addressed herein. Based on the analyses
of environmental issues contained in this document, the project is not expected to have
significant environmental impacts.
Mitigation Measures and Conditions 140 CFR 1505.2c
Summarize below all mitigation measures adopted by the Responsible Entity to reduce, avoid, or
eliminate adverse environmental impacts and to avoid non-compliance or non-conformance with
the above -listed authorities and factors. These measures/conditions must be incorporated into
project contracts, development agreements, and other relevant documents. The staff responsible
for implementing and monitoring mitigation measures should be clearly identified in the mitigation
plan.
Law, Authority, or Factor
Mitigation Measure
Contamination and Toxic Substances
Per HUD guidelines, radon mitigation activities are required
to be implemented during the construction phase of the
subject property per CC-1000, latest edition, Soil Gas Control
Systems in New Construction of Buildings. The guidelines
require soil gas control for all portions of the foundation
system and post -construction testing will be required by a
licensed, radon professional.
Determination:
® Finding of No Significant Impact [24 CFR 58.40(g)(1); 40 CFR 1508.27]
The project will not result in a significant impact on the quality of the human environment.
❑ Finding of Significant Impact [24 CFR 58.40(g)(2); 40 CFR 1508.27]
The project may significantly affect the quality of the human environment.
Preparer Signature:
Name/Title/Organization:
Date: 10/20/2025
AlIyson Shaw, Senior Project Manager, Partner Engineering and Science. Inc.
Certifying Officer Signat
Date: 10/20/2025
Name/Title: John Leybourne, Planner III Garfield County Community Development
This original, signed document and related supporting material must be retained on file by the
Responsible Entity in an Environmental Review Record (ERR) for the activity/project (ref: 24
CFR Part 58.38) and in accordance with recordkeeping requirements for the HUD program(s).