HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-06-25-9289
SPERRY FAMILY TRUST
New Single-family dwelling
5811 CR 320, Rifle
Sec 27, Twns 06, R94 - 217527100128
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018
INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL INFORMATION.
6) OPEN HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
2,000 PSF soil bearing.
7) LOG STRUCTURES - ALL STRUCTURAL LOGS SHALL BE DESIGNED BY A COLORADO LICENSED
ARCHITECT OR ENGINEER, AND THE ARCHITECT OR ENGINEER SHALL INSPECT LOGS AFTER
COMPLETION OF FRAMING TO CERTIFY THE SIZE, QUALITY AND SPECIES OF LOGS COMPLY WITH
ORIGINAL DESIGN REQUIREMENTS. PROVIDE COPY OF REPORT FOR INSPECTOR REVIEW AT FRAME
INSPECTION.
8) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAL/SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
9) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK
REQUIREMENTS / BUILDING ENVELOPE.
10) BLOWER DOOR TEST IS REQUIRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
11) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE ml507.3.3(1) AND (2) SHOWN ON COVER SHEET.
INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
LOCATE ALL UTILITIES PRIOR TO ANY WORK. 811 IS THE STATE UTILITY LOCATE NUMBER
CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS.
REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON -SEEDED AREA.
PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED.
PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.
MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERTY, DRAINAGE SHALL NOT ENTER NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE.
FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER.