Loading...
HomeMy WebLinkAboutEnginer's Letter 11.13.25November 13, 2025 tderson tructural Engineering RECEIVED Ms. Colleen Wurth DEC 0 9 2025 Building Plans Examiner GARFIELD COUNTY Garfield County Community Development COMMUNITYIJEvELOPMENT 108 81h Street, Suite 401 Glenwood Springs, CO 81601 RE: BLRE-09-25-9509 Wells ADU 540 Panoramic Dr, Lot 10 outside Silt Dear Ms. Wurth: Regarding the subject project, please note the following; 1. A structural floor and crawl space was selected by the owner and is applicable for this project. 2. See "Revised Permit" drawings for crawl space access framing. 3. Foundation type has been determined by engineering judgement to be acceptable for this site. Non structural slabs and spread footing foundations are both referenced in the geotechnical report. Frost depth as noted on the structural drawings shall be maintained. 4. See "Revised Permit" drawings for egress door header location. Please do not hesitate to call our office for any additional questions. Sinc rely, andon Ander n Anderson Structural Engineering, Inc. �00 HEM r 35435 &J3' ,- 448 Elk Run Road ■ New Castle, CO 81647 (970) 984-0320 a email: landon anderson-structural,com 5. What is your chosen ENERGY COMPLIANCE PATH for the ADU? 5.a. Are you building in accordance with the PRESCRIPTIVE PATH and the 2018 IECC Table R402.1.2? If so, provide a statement in writing. The proposed heating system for the subject structure consists of a 2-18,000 BTU, 208/230-volt mini -split condenser, which provides adequate capacity to serve the combined conditioned floor area up to 2,000 square feet. The design and associated equipment selection are in compliance with the 2018 International Energy Conservation Code (IECC). 5.b. Are you building in accordance with the PRESCRIPTIVE PATH using a RESCHECK REPORT? If so, provide a statement in writing along with your RESCHECK REPORT. 5.c. Are you building in accordance with the PERFORMANCE PATH using a HERS RATER AND HERS RATER REPORT(S)? If so, provide a statement in writing, your HERS Rater contact information and report. 5.d. What proposed window / door fenestration U-factors are you proposing to install? No U-factor readily found on DS sheet window / door schedule, thank you. 5.e. Do you have any air -sealing details to include in the FIELD COPY for sealing openings along the thermal envelope, as found at framing joints, windows / doors / electrical / mechanical penetrations? (The handwritten R-value floor wall ceiling sections are helpful and appreciated, but more ` Limited in air -sealing details. Garfield County Climate Zone 513 now requires new build homes to have a `blower door'test performed during construction. We are striving to aid in alleviatingtoo much leakage. Where further information available, please include in your response or resubmission plan materials, thank you!) Pursuant to Garfield County requirements, the project is evaluated under Climate Zone 5. The buildingthermal envelope meets or exceeds the prescriptive insulation requirements of the 2018 IECC, as outlined below: Ceilings: R-49 Above -Grade Exterior Walls: R-20 Floors: R-30 Crawlspace: R-19 RECEIVED DEC 0 9 2025 G,ARFIELD COUNTY COMMUNITY DEVELOPMENT