HomeMy WebLinkAboutSubsoils Report for Foundation DesignHuMeston-Berry
Engineering & Testing, LLC
'• . _ CDC'_
Dale Bauer
dale@truenortheolorado.com
Subject: Geotechnical Investigation
611 Scutter Lane
Rifle, Colorado
Dear Mr. Bauer,
2789 Riverside Parkway
Grand Junction, Colorado 81501
Phone:970-255-8005
Info@huddlestonberry.com
October 30, 2025
Project#03122-0001
This letter presents the results of a geotechnical investigation conducted by Huddleston-Berry
Engineering & Testing, LLC (HBET) at 611 Scutter Lane in Rifle, Colorado. The site location is
shown on Figure 1. The proposed construction is anticipated to consist of a new single-family
residence. The scope of our investigation included evaluating the subsurface conditions at the
site to aid in developing foundation recommendations for the proposed construction.
Site Conditions
At the time of the investigation, the site was open with undulating terrain. The investigated area
was located on a hilltop. Topography surrounding the investigated area consisted of moderate to
steep slopes. Vegetation consisted primarily of weeds, grasses, and trees. The site was bordered
to the north, west, east, and south by large residential parcels.
Subsurface Investigation
The subsurface investigation included four test pits as shown on Figure 2 — Site Plan. The test
pits were excavated to depths of between 6.0 and 8.0 feet below the existing ground surface.
Typed test pit logs are included in Appendix A.
As indicated on the logs, the subsurface conditions at the site were fairly consistent. The test pits
encountered up to 1.0 foot of topsoil above tan and brown, moist, medium stiff to hard lean clay
with sand soils that generally extended to the bottoms of the excavations. However, the clay soils
in TP-2, conducted to the south of the proposed residence, extended to a depth of 3.5 feet below
the existing ground surface. The clay soils in TP-2 were underlain by tan, moist, medium dense
clayey sand soils to the bottom of the excavation. Groundwater was not encountered in the
subsurface at the time of the investigation.
Laboratory Test
in
Laboratory testing was conducted on samples of the native soils encountered in the test pits. The
testing included grain size analysis, Atterberg limits determination, natural moisture content
determination, and maximum dry density and optimum moisture content (Proctor) determination.
The laboratory testing results are included in Appendix B.
611 Scutter Ln.
#03122-0001 Huddleston-Berry
(9r,gi,i,g& TL i,,g,I.IC
10/30/25
The laboratory testing results indicated that the native clay soils are moderately plastic. In
general, based upon the Atterberg limits and our experience with similar soils in the vicinity of
the subject site, the native clay soils are anticipated to be slightly expansive.
Foundation Recommendation-s
Based upon the results of the subsurface investigation and nature of the proposed construction,
shallow foundations are recommended. Spread footings and monolithic (turndown) structural
slabs are both appropriate foundation alternatives. However, as discussed previously, the native
soils are anticipated to be slightly expansive. Therefore, in order to provide a stable bearing
stratum and limit the potential for excessive differential movements, it is recommended that the
foundations be constructed above a minimum of 24-inches of structural fill.
Due to their plasticity, the native soils are not suitable for reuse as structural fill. Imported
structural fill should consist of a granular, non -expansive, non -free -free drairrirrn material with
greater than 10% passing the #200 sieve and Liquid Limit of less than 30. However, all
proposed imported structural fill materials should be approved by HBET.
For spread footing foundations, the footing areas may be trenched. However, for monolithic slab
foundations, the structural fill should extend across the entire building pad area to a depth of 24-
inches below the turndown edges. Structural fill should extend laterally beyond the edges of the
foundation a distance equal to the thickness of structural fill.
Prior to placement of structural fill, it is recommended that the bottom of the foundation
excavation be scarified to a depth of 6 to 9 inches, moisture conditioned, and compacted to a
minimum of 95% of the standard Proctor maximum dry density, within f 2% of the optimum
moisture content as determined in accordance with ASTM D698. Structural fill should be
moisture conditioned, placed in maximum 8-inch loose lifts, and compacted to a minimum of
95% of the standard Proctor maximum dry density for fine grained soils and 90% of the modified
Proctor maximum dry density for coarse grained soils, within f 2% of the optimum moisture
content as determined in accordance with ASTM D698 and D1557, respectively.
Structural fill should be extended to within 0.1-feet of the bottom of the foundation. No more
than 0.1-feet of gravel should be placed below the footings or turndown edge as a leveling
course.
For structural fill consisting of approved imported granular materials and foundation building
pad preparation as recommended, a maximum allowable bearing capacity of 1,500 psf may be
used. In addition, a modulus of 200 pci may be used for approved imported structural fill
materials. Foundations subject to frost should be at least 36-inches below the finished grade.
Any stemwalls or retaining walls should be designed to resist lateral earth pressures. For backfill
consisting of the native soils or imported granular, non -free draining, non -expansive material, we
recommend that the walls be designed for an active equivalent fluid unit weight of 55 pcf in
areas where no surcharge loads are present. An at -rest equivalent fluid unit weight of 75 pcf is
recommended for braced walls. Lateral earth pressures should be increased as necessary to
reflect any surcharge loading behind the walls.
Y:\2008 ALL PROJECTS\03122 -Dale Bauer\03122-0001 611 Scatter Lane\200 - Geo\03122-0001 LR103025.doc 2
611 Scutter Ln.
3122-0001 a Huddleston-Berry
#0
10312' '' fnFinecr'nF
25 TcuinF, LI C
Water soluble sulfates are common to the soils in Western Colorado. Therefore, at a minimum,
cement adequate for Sulfate Exposure Class S 1 is recommended for construction at this site.
Non -Structural Floor Slab and Exterior FlatA ork Recommendations
In order to reduce the potential for excessive differential movements, it is recommended that
non-structural floating floor slabs be constructed above a minimum of 24-inches of structural fill
with subgrade preparation, structural fill materials, and fill placement be in accordance with the
Foundation Recommendations section of this report. It is recommended that exterior flatwork be
constructed above a minimum of 12-inches of structural fill.
Drainage Recommendations
Gradinje and drains a are critical for the !on -term Performance ot the structure and grading
around the structure should be designed to carry precipitation and runoff away from the
structure. It is recommended that the finished ground surface drop at least twelve inches within
the first ten feet away from the structure. It is also recommended that landscaping within five
feet of the structure include primarily desert plants with low water requirements. In addition, it
is recommended that irrigation, including drip lines, within ten feet of foundations be minimized.
HBET recommends that downspout extensions be used which discharge a minimum of 15 feet
from the structure or beyond the backfill zone, whichever is greater. However, if subsurface
downspout drains are utilized, they should be carefully constructed of solid -wall PVC and should
daylight a minimum of 15 feet from the structure. In addition, an impermeable membrane is
recommended below subsurface downspout drain lines. Dry wells should not be used.
As discussed previously, shallow groundwater was not encountered at the time of the
investigation. However, a perimeter foundation drain is recommended. In general, the perimeter
foundation drain should consist of prefabricated drain materials or a perforated pipe and gravel
system with the flowline of the drain at the bottom of the foundation (at the highest point). The
prefabricated drain materials or gravel should extend along basement walls to within 36-inches
of the finished grade. The perimeter drain should slope at a minimum of 1.0% to daylight or to a
sump with pump. The drain should also include an impermeable membrane at the base to limit
the potential for moisture to infiltrate vertically down below the foundations.
General Notes
The recommendations included above are based upon the results of the subsurface investigation
and on our local experience. These conclusions and recommendations are valid only for the
proposed construction.
As discussed previously, the subsurface conditions encountered at the site were fairly consistent.
However, the precise nature and extent of any subsurface variability may not become evident
until construction. As a result, it is recommended that HBET provide construction materials
testing and engineering oversight during the entire construction process. In addition, the builder
and any subcontractors working on the project should be provided a copy of this report and
informed of the issues associated with the presence of moisture sensitive subgrade materials at
this site.
YA2008 ALL PROJECTS\03122 -Dale Bauer\03122-0001 611 Scutter Lane\200 - Geo\03122-0001 LR103025.doe
611 Scutter Ln.
#03122-0001 HuddleAon-Berry
` •, E,ginttri,g& TcaiinF. LAC
10/30/25
It is important to note that the recommendations herein are intended to reduce the risk o
structural movement and/or damn a to varl7ing de reel associated with volume change o the
native soils. However HBET cannot Predict long-term chcrn es in subsurface moisture
conditions and/or the Precise magnitude or extent of volume chap a in the frative soils. Where
significant increases in subsur ace moisture occur clue to poorQradiniz, improper stormwater
marry enment utility line failure,excess lrri ation or other cause either (luring construction
or the result of actions of the Property owner, several inches of movement are possible. In
addition anV failare to comply with the recommendations in this report releases Huddleston-
Berry EULineefing & TestinZ LLC of any liability with regard to the structure Performance.
We are pleased to be of service to your project. Please contact us if you have any questions or
comments regarding the contents of this report.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Y:\2008 ALL PROJECTS\03122 -Dale Bauer\03122-0001 611 Scutter Lane\200 - Geo\03122-0001 LR 103025.doc 4
FIGURES
f; gPublic.net"" Garfield County, CO
FIGURE 1
Date created: 4/11/2024
Last Data Uploaded: 4/11/2024 2:16:08 AM Site Location Map
Developed by4" Schneider
GEOSPATIAL
gPublic.net Garfield County, CO
a= tP4EREZ r - RU846fi4'
_ - �' • "•" RA, '�+ • "a ;zy� �[ :r 21272810D3$$ r
'.�1 ^� ':`� .4: R.• mil'•• � lftn-
rF •-: -..• �'�'.
b s i •t t� y� ! 5z I'4a' i 71
= H ��� - �' :lam 1- e• � i .•� � R04438
•` .r ►212727201
�� I .y:. Y Y:� .� .8'wZ"Yt• � J� •vr' •� � �•r� , .i!' , TP-4 .; y � e
r •� �� 'ip =` :..ram •4,.-1F f.� !'�.- �:'' :r��
�� , •� QaPE3�'.; .z R084665 TP-3 4 • r+ �,.WADE"E-&+1MLER G(]OPER; TP-2
y 2'12728400387 r
o
ti . +It, � r • � ,`" S� . ..... .e Atv
WK ..+
4116
_ r RL
i - ■
16
Ng
•.'Jo N` " "2,72728400388: " r, %
2. .ikw .. -, •* Sf-J'r•:. fir. .,MCA .. - f �•.`
rs '� , :••� `4r•*,-'•;� `� °•? •�':� -• •R044910
212728401004
- MURR
CODY WAYNE & CRYSTA
212=284010d3 l
fi
N
Date created:4/11/2024 FIGURE 2
Last Data Uploaded: 4/11/2024 2:16:08 AM Site Plan
Developed by4&q, Schneider
G E 0 S GAT I A L,
APPENDIX A
Typed Test Pit Logs
11uddles[on-Berry i ngineering & Testing, LLC TEST PIT NUMBER TP-1
2789 Riversidc Parkway PAGE 1 OF 1
Grand Junction, CO 81501
970-255-8005
CLIENT Dale Bauer PROJECT NAME 611 Scutter Lane _
PROJECT NUMBER 03122-0001 PROJECT LOCATION Rifle, CO
DATE STARTED 3/19124 COMPLETED 3/19/24 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS:
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry
LOGGED BY TEC CHECKED BY MAB AT END OF EXCAVATION Dry
NOTES AFTER EXCAVATION --
ATTERBERG
a
o
z
W o
LIMITS
W
❑
U
H.-.
_(�
p
MATERIAL DESCRIPTION
Wm
W�
p
oZJ
F-�
~U
Z a
�Z
Z o
OU ..
o
in p >
Uz
`e "
��
_F-
O Z
5—
aJ
�
gJ
~Lu
U)Z
W
O
QZ
Cn
Wv
rr
O
o-
2
o
0O
U
rL
g -
Z
0.0
Lean CLAY with Sand (d), tan and brown, moist, medium stiff to
a
LL
hard
2.5
5.0
Bottom of test pit at 7.0 feet.
Huddleston-Bevy Engineering & Testing, LLC TEST PIT NUMBER TP-2
2789 Riverside Parkway PAGE 1 OF 1
Grand Junction, CO 81501
970-255-8005
CLIENT Dale Bauer PROJECT NAME 611 Scutter Lane
PROJECT NUMBER 03122-0001 PROJECT LOCATION Rifle CO
DATE STARTED 3/19/24 COMPLETED 3/19/24 GROUND ELEVATION _ TEST PIT SIZE
EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS:
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry
LOGGED BY TEC CHECKED BY MAB AT END OF EXCAVATION . Dry
NOTES AFTER EXCAVATION —
U
a Z o- O MATERIAL DESCRIPTION
w J
❑
n�h
7.5
Sandy Clay with Gravel and Organics (TOPSOIL)
Lean CLAY with Sand (CL), brown and tan, moist, stiff
GB-1: Lab Classified
Clayey SAND (SC), tan, moist, medium dense
GB-2: Lab Classified
Bottom of test pit at 8.0 feet.
I w
�w
c
�o
Er
Z
w
a
��:D
J�
>cr
_j:DQ
W
UZ
UO
Qz
U)
Wv
W
d
MC
1
GB
1
GB
2
ATTERBERG
w o LIMITS w
�_ z
O
SA U) �H- �~ UW U
} Oz C7� U)4❑ U
❑ LU
20U 73 0_J JZ Z
a- LL
1651 13
121381231151751
11 1 31 1 18 1 13 1 43 1
I Iuddleston-Berry Engineering & Testing, LLC TEST PIT NUMBER TP-3
2789 Riverside Parkway PAGE 1 OF 1
Grand J unction, CO 8 1501
970-255-8005
CLIENT Dale Bauer PROJECT NAME 611 Scutter Lane
PROJECT NUMBER 03122-0001 PROJECT LOCATION Rifle CO
DATE STARTED 3/19/24 COMPLETED 3119/24 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS:
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION DN
LOGGED BY TEC CHECKED BY MAB AT END OF EXCAVATION
NOTES AFTER EXCAVATION _ —
ATTERBERG
d
o
z
w o
LIMITS
w
U
�_
U w
H
o
U
=C�
o p
MATERIAL DESCRIPTION
��
Lu
-j g
�_
W�
> C�
rnW
�Z�
Q
d
H�
w
~
LE
�Z
Lu
H
Z
w�
�J
��
0-
m0>
pz
Yv
OZ
p�
,g
H0
U)
(D
�z
d
o
�O
J �g�
o
zw
�_
LL
0.0
Sandy Clay with Organics (TOPSOIL)
Lean CLAY moth Sand (cl), tan and brown, moist. medium stiff
2.5
5.0
Bottom of test pit at 6.0 feet.
TEST PIT NUMBER TP-4
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway PAGE 1 OF 1
Grand Junction, CO 81501
970-255-8005
CLIENT Dale Bauer PROJECT NAME 611 Scutter Lane
PROJECT NUMBER 03122-0001 PROJECT LOCATION Rine CO
DATE STARTED 3/19/24 COMPLETED 3/19/24 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS:
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION D
LOGGED BY TEC CHECKED BY MAB AT END OF EXCAVATION dry
NOTES AFTER EXCAVATION —
ATTERBERG
F-
a
o
z
w e
LIMITS
W
��
W
F-
d
o p
MATERIAL DESCRIPTION
-1 2
> e�
¢
w
a
U w
0
2Z
O�
m0>
UZ
U`
Oz
d�
mg
5-
�C)
Z
w
U
�
W
O
o
o
�O
v
��
o
0.0
Sandy Clay with Organics (TOPSOIL)
ng
LL
Ti• .� b.
5 1j t�
Lean CLAY with Sand (cl), tan and brown, moist, stiff to very stiff
2.5
6.0
Bottom of test pit at 6.0 feet.
APPENDIX B
Laboratory Testing Results
.- .-.
.. - ""�•:' -:�'�IIIYIIIIIYI■I[IIIII■■IIIIIII■■
.,11■■IIIIIII■■IIlIIlliir��,'�11■■1[IIIII■■IIIIIII■■
.11
■■1[I
I III
■
■
Ill
II
II■■
Ill��li■■IIII
I11■■II
I
II11■■
:,11■■IIII[I1■■IIIIIII■■Illlll��l■71111I11■■IIIIIII■■
11
■
■IIIIIII
■
■IIIIIII■■
Illll
I1!■■ill
IIII■■ll
I
II
I■■■
,11■■11[IIII■■I111111■■II11I11�1■1[rI111■■IIIIIII■■
11
■■IIIIIII
■
■
IIIIIII■■IIIIIII\■Ill
l III■�1111111■■
:,11■■IIIIIII■®II[IIII■■IIIIIII■■IIIIIII■�Il[II11■■
11■■IIIIIII■®IIIIIII■■IIIIIII■
IIIIIII■■1[III11■■
,11�■�1111111■■IIIIIII■■IIIIIII■\111III11■�I[III11■■
II
III
■
■
I IIII11■■IIIIIII■■IIIIIII■■
I[III11■■
.11■■ll
,11■■1[IIIII■®IIIIIII■■IIIIIII■■1[�IIII■■Illllll■■
11■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■[[[IIII■■
,11■■1[IIIII■■IIIIIII■■IIIIIII■■IIIIIII■■[[[IIII■■
11■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■Illllll■■
�
,11■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■
11■■I[II
111
■
■IIIIIII■■IIIIIII■■
Illl
II
I■
■I
III
ll
l
■
■
,11■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■IIIIIII■■
11■■IIIIIII■■IIIIIII■■IIIIIII■■IlllIII■■II
MINE
,11■■IIIIIII■■IIIIIII'■■IIIIIII■■IIIIIII■�
Illl■■
„ ,,,
.-: •.
o
mmmm
im
������
RHuddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
CLIENT Dale Bauer
PROJECT NUMBER_ 03122-0001
50
P
L
A
S 40
T
I
C
T 30
Y
I
N 20
D
E
X
106 CL-ML
Oi
0
m
Specimen Identification LL I PL
TP-2, GBA 3/19/24 38 23
TP-2, GBA 3119124 31 18
■
ATTERBERG LIMITS' RESULTS
PROJECT NAME _ 611 Scutter Lane
PROJECT LOCATION Rifle, CO
40 60 80 100
LIQUID LIMIT
PI #200 Classification
15 75 LEAN CLAY with SAND(CL)
13 I 43, CLAYEY SAND(SC)
' FRE
CLIENT
PROJECT
a� Huddleston-Bery
w 2789
Grand
970-255-8005
Dale Bauer
Riverside
Junction,
Parkway
CO
Engineering
81501
& Testing, LLC MOISTURE -DENSITY RELATIONSHIP
PROJECT NAME 611 Scutter Lane
PROJECT LOCATION Rifle, CO
Sample Date: 3/19/24
Sample No.: 24-0156
Source of Material: TP-2, GBA
Description of Material: LEAN CLAY with SAND CL
Test Method (manual): ASTM D698A
TEST RESULTS
Maximum Dry Density 105.5 PCF
Optimum Water Content 18.0 %
GRADATION RESULTS (% PASSING)
#200 #4 3/4"
_ 75 100 100
ATTERBERG LIMITS
LL PL PI
38 23 15
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
NUMBER
03122-0001
150
145
140
135
130
125
U
a
w 120
0
115
110
105
100
95
90
0 5 10 15 20 25 30
WATER CONTENT, %