Segundo Operator House Plan View
SCALE:)/2" = 1'-0
y 0 1 2
N
a
P
(D
10,
8" Wall
1
_4
II a Ufer Ground to Footer Steel w/ #2
Bare Copper Ground Wire.
Extend Wire to Adjacent Terminal
Foundation Wire. Leave 5' of
Wire Above Terminal TOC>
e
- 10'-8"
i
1 Op House Footer
S-1 Scale: 1/2" = 1'-0
#4 2'-Ox2'-0 L 'G Bar' @
Each Horizontal
Reinforcement.
#4 L 'C Bars' @ 18" c/c.
Alternate Direction.
Horiz. Wall Reinf.
(See Op House Elevations)
2 Wall Corner Lap Reinforcement t
S-17 Scale: 1/2" _
#4 3'-Ox3'-0 L 'F Bars' @
Each Horizontal
Reinforcement.
#4 L 'C Bars' @ 18" c/c.
Alternate Direction.
Horiz. Footer Reinf.
(See Op House Elevations)
3 Footer Corner Lap Reinforcement (typ.)
S-1 J Scale: 1/2" = 1'-0
2
See Site Plan for
Operator House
Positioning.
Footer Steel Not
Shown for Clarity.
C Bars Shown in Normal
Position for No Blockouts.
Relocate Hook to Either Side
of Blockout per Details (typ.).
16"x10" Continuous Footer w/ (3) Horizontal #4
Bar Set 3" Above Grade w/ #4 L Bars @ 18" c/c
(Alternate Direction). 8" Stem Wall w/ #4
Horizontal Bar @ 12" c/c w/ (2) Continuous #4
Horizontal Bars Set 3" Below TOW.
%4"O Bolt
Plate Wel
of Operat,
Steel Frai
External F
Assembly
Shim w/ V
as Requir
�r Cut'C Bar @
�r of 18" Blockout
ate/Cut 'G Bar' at
Dut (Similar at 18"x18"
Dut at Side Wall.
linate 18"x18" Blockout (One
Drily - Refer to Site plan).
ate 'C Bar' to Either Side of
Dut. Relocate Bars
)priately.
SCALE: --
SCALE: %2" = 1'-0
0 1 2
SCALE: %2" = 1'-0
Y 0 1 2
Attach Prefabricated Frame to Stem Wall at (4)
Corner Locations and (2) Rear Connection Plates.
cated
)r House Steel
I Hold
I"LJJG� idly Plate 1Q
4 Hold -Down Assembl - Elev.
S-1 Scale: 2" = 1'-0
ricatea operator
Steel Frame
Simpson Titen HD
THD75700H Screw Anchor.
Install per Manufacturer
Requirements. Min 5" of
Embedment.
5 Hold -Down Assembl - Sect
S-1 Scale: 2" = 1'-0
3
in
ate/Cut'G Bar' at
gut (Similar at 18"x18"
gut at Side Wall.
linate 12"x12" Blockout (For
ical Service - Refer to Site plan).
ate 'C Bar' to Either Side of
Dut. Blockouts May be Raised as
:d - Relocate Bars Appropriately.
El
GENERAL NOTES
1. DESIGN DATA: DESIGN LIVE AND DEAD LOADS
ROOF LOAD L.L. = 100 PSF (SNOW) D.L. = 15 PSF
FLOOR LOAD L.L. = 40 PSF D.L. = 15 PSF
WIND LOAD 115 MPH (@ 30 HEIGHT) EXPOSURE B
2. THE FOLLOWING CODES AND EDITIONS WHERE USED - INTERNATIONAL BUILDING CODE (2015) - ACI BUILDING CODE (ACI 318-02) - MANUAL OF STEEL CONSTRUCTION
(9TH EDITION) - NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION (NDS 1991) - AITC TIMBER CONSTRUCTION MANUAL (4th EDITION) - SEAC SNOW LOAD
PUBLICATION
3. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF
ALL PERSONS AND PROPERTY, AND THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING, BRACING, AND
TEMPORARY EXCAVATION.
5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND SITES CONDITIONS BEFORE STARTING WORK AND NOTIFY THE ARCHITECT AND ENGINEER
IMMEDIATELY OF ANY DISCREPANCIES.
6. ALL OMISSIONS AND CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT AND ENGINEER BEFORE PROCEEDING WITH WORK SO INVOLVED.
7. RESOLVE ANY CONFLICTS ON THE DRAWINGS WITH THE ARCHITECT AND ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION.
8. COORDINATE ALL OPENINGS THROUGH FLOORS, WALLS AND ROOF WITH THE APPROPRIATE TRADES. NOTIFY ENGINEER IF ANY OPENINGS ARE TO BE CUT IN
STRUCTURAL COMPONENTS.
9. CONTRACTOR TO COORDINATE ALL INSPECTION REQUIRED BY AUTHORITY HAVING JURISDICTION. THE OWNER AND CONTRACTOR ARE RESPONSIBLE FOR OBTAINING
ALL REQUIRED PERMITTING FOR THE PROJECT.
FOUNDATION AND EARTHWORK
1. DESIGN BASED ON AN ASSUMED DESIGN MAX. BEARING PRESSURE - 1500 PSF. NO EXPANSIVE OR COLLAPSIBLE SOILS WERE ANTICIPATED. ASSUMED LATERAL EARTH
PRESSURE: 55 PCF. THE CONTRACTOR SHALL HAVE A GEOTECHNICAL ENGINEER REVIEW THE OPEN PIT AND VERIFY THE DESIGN ASSUMPTIONS.
FOOTINGS SHALL BE PLACED IN UNDISTURBED NATIVE SOIL. ORGANIC SOIL AND FOREIGN OBJECTS ARE TO BE REMOVED. AT THE UPPER TERMINAL, FILL BELOW THE
OPERATOR HOUSE IS ANTICIPATED. THE GEOTECHNICAL ENGINEER SHALL SPECIFY THE FILL AND COMPACTION REQUIREMENTS TO MINIMIZE POTENTIAL SETTLEMENT.
FOUNDATION DESIGN ASSUMES THAT ALL RECOMMENDATIONS BY THE GEOTECHNICAL ENGINEER WILL BE IMPLEMENTED.
IF WATER APPEARS IN THE EXCAVATION OR ON THE SURFACE, CONTACT THE ENGINEER PRIOR TO FORMING.
2. MINIMUM DEPTH TO BOTTOM OF FOOTING SHALL BE T-6 BELOW LOWEST ADJACENT FINISHED GRADE FOR EXTERIOR FOOTINGS.
3. FINISHED EXCAVATION FOR FOUNDATION SHALL BE NEAT AND TRUE TO LINE WITH ALL LOOSE MATERIAL AND STANDING WATER REMOVED FROM EXCAVATIONS.
4. THE GROUND SURFACE SURROUNDING THE EXTERIOR OF THE BUILDING SHOULD BE SLOPED TO DRAIN AWAY FROM THE FOUNDATION IN ALL DIRECTIONS. IT IS
RECOMMENDED THAT A MINIMUM SLOPE OF 12 INCHES IN THE FIRST 10 FEET IN UNPAVED AREAS, AND A MINIMUM SLOPE OF 3 INCHES IN THE FIRST 10 FEET IN PAVED
AREAS BE PROVIDED.
CONCRETE
1. CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 318 STANDARD. COLD WEATHER CONCRETING SHALL CONFORM TO THE ACI 306.
MINIMUM STRENGTH: F'c = 4,500 PSI AT 28 DAYS
ALL CONCRETE USED IN SLABS SHALL CONTAIN 1-1/2 LB/CY OF COLLATED, FIBRILLATED POLYPROPYLENE FIBERS (FIBERMESH) w/ 7% AIR ENTRAINMENT SLUMP: 4" ± 1"
NO WATER SHALL BE ADDED ON SITE WHICH WILL INCREASE SLUMP TO ABOVE 5". CONCRETE TO BE MIXED PER ASTM C94 MAXIMUM TEMPERATURE IN MIXER: 90
DEGREES F.
CEMENT SHALL BE PER ASTM C150, TYPEII, LOW ALKALI. MIX DESIGNS: IF REQUESTED, SUBMIT TO ARCHITECT FOR REVIEW BY ENGINEER A MINIMUM OF ONE WEEK
PRIOR TO FIRST CONCRETE DELIVERY.
MAXIMUM WATER/CEMENT RATIO(BY WEIGHT) :W/c = 0.64 F'c = 4,500 PSI AGGREGATE: PER ASTM C33, MAXIMUM 1". NO ADMIXTURES CONTAINING CHLORIDE SALTS
ARE PERMITTED. CONCRETE SHALL NOT BE IN CONTACT WITH ALUMINIUM.
2. CURING SHALL IMMEDIATELY FOLLOW THE FINISH OPERATION. KEEP CONCRETE CONTINUOUSLY MOIST FOR AT LEAST 7 DAYS USING A POLYETHYLENE FILM
SECURELY HELD IN PLACE OR AN ALTERNATE METHOD APPROVED BY ARCHITECT.
3. PLACEMENT: PER ACI STANDARD 614.
4. A MINIMUM OF TWO TEST CYLINDERS SHALL BE CAST FOR EACH FOUNDATION OR A MINIMUM OF TWO TEST CYLINDERS SHALL BE CAST FOR EACH TRUCK
(WHICHEVER REQUIRES THE MOST SAMPLES BE TAKEN). CYLINDERS SHALL BE LABELED FOR ALL FOUNDATIONS APPROPRIATELY. CYLINDERS TAKEN FROM TRUCKS
SUPPLYING MORE THAN ONE FOUNDATION SHALL BE LABELED FOR ALL FOUNDATION APPROPRIATELY. ONE CYLINDER OF EACH PAIR IS TO BE TESTED AT 28 DAYS
PER ASTM C39. THE SECOND CYLINDER IS TO BE RESERVED FOR SUBSEQUENT TESTING IF REQUIRED.
REINFORCING STEEL
1. REBARS: DEFORMED STEEL, ASTM SPEC. A615 GRADE 60. ALL REBAR BENDS TO BE MADE COLD.
2. SPLICING: 40 DIA. U.N.O. STAGGER SPLICES
3. REINFORCING STEEL CLEAR COVER TO FACE OF CONCRETE IS:
AGAINST EARTH WITHOUT FORMS .........3"
CONCRETE CAST AGAINST A FORMED OR FINISHED SURFACE ......... 2"
4. REINFORCING STEEL SHALL BE CLEAN, WITH NO OIL, MUD, OR RUST SCALE ON BONDING SURFACE.
5. BENT REINFORCEMENT BAR IS DETAILED WITH OUT TO OUT DIMENSION. TOLERANCES SHALL CONFORM TO CRSI STANDARDS.
6. REINFORCING IN CONCRETE PLACED AGAINST EARTH WITHOUT FORMS IS TO BE SUPPORTED WITH APPROVED NON-METALLIC CHAIRS, OR ANOTHER METHOD
APPROVED BY THE ENGINEER.
5
PER OPERATOR HOUSE
INDEX
QTY/FTG
O BAR
DESCRIPTION
G
12
# 4
N 24"
F
12
#4
"LW
E
14
# 4
11'-8
D
14
#4
9-8
C
36
(Inc 4 Extra)
#4
44 6
B
6
#4
12'-4
A
6
#4
10'-4
1
6
EXTERNAL HOLD ASSEMBLY
ITEM
ITEM NAME
LENGTH/BAR
PER PROJECT
TOTAL LENGTH / INDEX
WT. (LBS)
48"
TL = 48-0
32 LBS
72"
TL = 72'-0
48 LBS
140"
TL=140'-0
94 LBS
116"
TL=116'-0
77 LBS
62"
TL=186-0
124 LBS
148"
TL = 74'-0
50 LBS
124"
TL = 62'-0
42 LBS
41671420
QTY
MATERIAL
I ITEM #
WT
6
O000
W
H
O
O
Q
Inoue
a>
L
O
L
O
Z
a)
co
a)
N�
a)
c
a)
N�
U
f)
W
W
C14
O
CV
73
O
O
\
/
^^U
0—
0
70
C
0
LL
—
(D
W
J
Q
co
W
ILL
0
L
O
ca
CU
C
d)
O
T-
O
C
LO
C1
-r--
C:)C2
O
L
\
�
I
CL
ti
0
O
CD
C
LLI
H
�
m
O
C
N
Cn
O
C
O
(D
121�
U
co
C
co
Q
O
s=
C
U)
(n
B
N
o
co
V
o
O
z
U
CO
co
N
X
o
m
O
Z
1(1
•
M
co
N
Nt
ti
N
W
CD
ti
rn
W
•
E
Z
U
�
c
—
W
C
c
o
Z
�
C
0
W
��L�t/J�(lIS4J
8901 0:
50 ^ 07/10/25 4,