PO BOX 1293 CRAIG, CO 81626 PHONE (970) 620-4030
CIVIL ENGINEERING WATER RESOURCES ENGINEERING ENVIRONMENTAL CONSULTING
December 30, 2025
Garfield County Public Health Department
2014 Blake Ave.
Glenwood Springs, CO 80601
<Sent Via Email>
RE: 6800 CR 252 Garfield County, On-Site Wastewater Treatment System Construction
Certification
Dear GCPHD:
In accordance with Section 4.F of CDPHE/WQCC, Regulation #43, please accept this letter as
certification by me, the design engineer, that the subject Onsite Wastewater Treatment System
(OSWTS) was constructed in accordance with CDPHE/WQCC, Regulation #43 requirements based on
an inspection by me, November 17, 2025. It is our understanding that GCPHD also inspected the
system November 24, 2025 and required that 1) an effluent filter in the septic tank and 2) flow equalizers
(speed levelers) be installed in the distribution box. Evidence that this was completed is presented in
the installation photos included as Attachment B. The as-built configuration based on GPS survey is
depicted by the as-built/record drawing included as Attachment A. To the best of my knowledge and
measurement all offset distances have been met.
Please let me know if you have any questions or comments.
Best regards,
Will A. Myers, P.E.
encl: as noted
Appendix A
As-Built / Record Drawing
3
-
B
E
D
R
O
O
M
H
O
U
S
E
4" Ø CLEANOUT
4" Ø SCH 40 SEWER PIPE
L = 70',
S = 2.2%
SPP2
60" ARC 36 DRAINFIELD CHAMBER
(40 TOTAL)
SPP1
INFILTRATOR WATER SYSTEM
1,000 GAL SEPTIC TANK
TUFFTITE DISTRIBUTION BOX
45'55'
50'
50'
10'±
≈ PROPERTY FENCE
100' OFFSET TO POTABLE WATER CISTERN
INSPECTION PIPE (TYP. OF 4)
POTABLE WATER CISTERN
LEGEND
SOIL PROFILE PIT
N
WAM WAM
Revised:
Revised:Drawn By:Date:Checked By:
File:
By:
Headwater Engineering
P.O. BOX 1293
Craig, CO 81626
SHEET
For:
REUBEN & LISA JENSEN
PO BOX 445
CARLSBAD, TX 76934
GARFIELD COUNTY OWTS DESIGN
SITE ADDRESS:
6800 CR 252
RIFLE, CO 81650 1 OF 1
0 15 30
GRAPHIC SCALE (FEET)HOUSE AS-BUILT PLAN
NOTES:
1.BASED ON AN AS-BUILT INSPECTION
NOVEMBER 17, 2025, THE SYSTEM WAS
DETERMINED TO BE CONSTRUCTED IN
ACCORDANCE WITH THE DESIGN CRITERIA AND
TO CDPHE/WQCC, REGULATION #43.
2.192' OF 3-FOOT WIDE INFILTRATION LATERALS
DESIGNED, 200' AS-CONSTRUCTED.
3.LOCATIONS OF SYSTEM COMPONENTS WERE
SURVEYED WITH GPS.
Appendix B
Construction Photos