HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
TYPE OF CONSTRUCTION
0 Commercial/Multi-Family Demolition
0 Manufactured Home (Single or Multi -Level)
F7 Residential (SF, Duplex orTownhome) Re -roof
[] Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET
INVOLVED PARTIES
Property Owner: Bonfire Coffee: Charlie Chacos(Tenant) phone: (970 ) 274.1950
Mailing Address: 433 Main St Carbondale, CO 81621
Email Address: charlie@bonfirecoffee.com
Contractor: Terralink Structures,Ltd
Mailing Address: PO Box 1242 Carbondale, CO 81623
Email Address: andy@terralinkstructures.com
I Architect: J.Ray Barlow
Mailing Address: 326 S. 3rd st Carbondale, CO 81623
Email Address: Jrbarlow.b3@gmail.com
Engineer: N/A
Mailing Address:
Email Address:
Manufactured Home Installer: N/A
Mailing Address:
Email Address:
PROJECT DETAILS
Phone: ( 970 379.3741
Phone: ( 970 ) 274.0623
Phone: { ]
Phone: { )
Describe Work: Tenant interior finish to build out an office and a coffee roasting facility.
Job Address: 304 Center Dr, Unit 106
Assessor's Parcel Number:
Sub. Lot - Block
Owner's Valuation of Work: $ 125,000.00 Property Size (Sq. Ft. or Acres):
Sq. Ft. of Building: 2191 sf (leased Space) Height:= 10'+ (varies) # of Floors: 1
Class of Work: New 77
Remodel/Alteration Addition
Garage: Attached Detached
I
PROJECT DETAILS CONTINUED
Septic:
❑OWTS
Type of Heat:
❑Natural Gas 1� Propane
Driveway
❑Exempt
Permit:
Community
❑ Electric
❑ Permit #:
❑ Other
NOTICE _ -- - — —
Authority. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
1 understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring i
the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
��l
C 11/19/2025
Property Owner Print and Sign Date
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuatio
� a3+s.�S
�
Total Fees:
12-3.81
Setbacks:
Plan Check Fee: Permit Fee: Manu. Home Fee: Misc. Fees:
14$21.14 ` AI
Fees Paid: Balance Due: BP Ni
5 l , 355
[�C,C Group: I Const. Type:
U
OWTS No:
BUILDING / PLANNING DIVISION: -A r
e. �A--- Date
Garfield County
Qom unity ueveiopment uepartment
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
Applicant: Bonfire Coffee Phone: (970) 274-1950
Project Address: 403 Center Drive #106
Subdivsion: Cooper Minor Lot: Block:
'Type of Occupancy
'Type of Construction
Square Feet
Price per Sq. Ft.
71
IIB
2250
$28.46
Total Valuation
$64,035.00
Breakdown of Fee Calculations:
Tenant finish permit fees are calculated at 20% of the ICC established cost per square foot, per foot note of the chart
$142.31 x 20% _ $28.46 x 2250 = $64,035.00
***All fees are estimates until final plan review is completed***