Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-11-25-9600 BONFIRE COFFEE - CHARLIE CHACOS TENANT FINISH FOR ROASTING COFFEE AND CUPPING 304 CENTER DRIVE #1061 GWS 1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WWW. LORADO. OVIPA IFI ID RA/DPO ELECTRICAL PLUMBING ERMITS 4) ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 5) SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE CONTACT THE COUNTY PLANNER FOR THE APPLICATION. 6) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 7) THE FIRE SPRINKLER AND ALARM ARE REQUIRED TO BE INSPECTED AND APPROVED BY THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP DRAWINGS TO THE FIRE DISTRICT FOR REVIEW AND SCHEDULE THE INSPECTIONS ACCORDINGLY. PLEASE HAVE THE FIRE MARSHAL SIGN THE INSPECTION CARD WHEN THE ROUGH INSPECTION IS APPROVED AND WHEN THE FINAL INSPECTION IS APPROVED. 8) COMBUSTIBLE MATERIAL IS LIMITED IN TYPE I AND TYPE II CONSTRUCTION. SEE IBC 603 FOR ALLOWED COMBUSTIBLE MATERIALS. STEEL STUDS REQUIRED OR IBC 603 9) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED. 10) SAFETY GLAZING IS NOT DESIGNATED ON THE PLANS. SAFETY GLAZING WILL BE CHECKED DURING THE FRAMING AND FINAL INSPECTION. (IBC 2406.4) 11) ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE CONSTRUCTION WILL BE REQUIRED TO BE FIRE -STOPPED WITH LISTED FIRE STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE ASSEMBLIES AT THE FRAMING INSPECTION. (IBC 713) 12) ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, INCLUDING POCKET AND SLIDING DOORS. (ANSI A117.1-404.2.6) 13) THE FLUE PIPE FOR THE ROASTER IS TO BE ABLE TO WITHSTAND 1400 DEGREES. B-VENTS ARE NOT LISTED FOR THAT TEMPERATURE. 14) THE ROASTER IS 130,000 BTU/hr REQUIRING 6400 CU.FT. OF OPEN SPACE FOR COMBUSTION AIR. THE SPACE THAT HOUSES THE ROASTER IS APPDXIMATELY 16,000 CU. FT. ANY CHANGES TO THE FLOOR PLAN WILL NEED TO VERIFY THE VOLUME NEEDED. 15) THE 3 COMPARMENT SINK IS TO DRAIN THRU AN AIR GAP.