1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO
PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS://WWW. LORADO. OVIPA IFI ID RA/DPO ELECTRICAL PLUMBING ERMITS
4) ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A
LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE
CERTIFICATE OF OCCUPANCY.
5) SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE CONTACT
THE COUNTY PLANNER FOR THE APPLICATION.
6) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS
PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE
INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE
INSPECTIONS.
7) THE FIRE SPRINKLER AND ALARM ARE REQUIRED TO BE INSPECTED AND APPROVED BY
THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP DRAWINGS TO THE FIRE
DISTRICT FOR REVIEW AND SCHEDULE THE INSPECTIONS ACCORDINGLY. PLEASE HAVE
THE FIRE MARSHAL SIGN THE INSPECTION CARD WHEN THE ROUGH INSPECTION IS
APPROVED AND WHEN THE FINAL INSPECTION IS APPROVED.
8) COMBUSTIBLE MATERIAL IS LIMITED IN TYPE I AND TYPE II CONSTRUCTION. SEE IBC 603
FOR ALLOWED COMBUSTIBLE MATERIALS. STEEL STUDS REQUIRED OR IBC 603
9) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED.
10) SAFETY GLAZING IS NOT DESIGNATED ON THE PLANS. SAFETY GLAZING WILL BE
CHECKED DURING THE FRAMING AND FINAL INSPECTION. (IBC 2406.4)
11) ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE CONSTRUCTION
WILL BE REQUIRED TO BE FIRE -STOPPED WITH LISTED FIRE STOPPING ASSEMBLIES. THE
CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE ASSEMBLIES AT THE FRAMING
INSPECTION. (IBC 713)
12) ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP,
INCLUDING POCKET AND SLIDING DOORS. (ANSI A117.1-404.2.6)
13) THE FLUE PIPE FOR THE ROASTER IS TO BE ABLE TO WITHSTAND 1400 DEGREES. B-VENTS
ARE NOT LISTED FOR THAT TEMPERATURE.
14) THE ROASTER IS 130,000 BTU/hr REQUIRING 6400 CU.FT. OF OPEN SPACE FOR
COMBUSTION AIR. THE SPACE THAT HOUSES THE ROASTER IS APPDXIMATELY 16,000 CU.
FT. ANY CHANGES TO THE FLOOR PLAN WILL NEED TO VERIFY THE VOLUME NEEDED.
15) THE 3 COMPARMENT SINK IS TO DRAIN THRU AN AIR GAP.