HomeMy WebLinkAboutObservation of ExcavationActivity Date:04/22/2025 Technician:Downing, Thomas
Plans/Details:
CTL|Thompson Report GS06929.000120R1, dated December
11, 2024
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
Clays encountered in the south and east footing excavation are to be removed and replaced with densely compacted structural
fill material per the report.
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000
120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The silty
gravels encountered on the west side of the excavation are appropriate for footings support, however the clay material exposed
at footing elevation on the east and south sides should be removed and replaced with densely compacted structural fill
material per the report. The contractor was notified of our observations. Additional site visits will be made with required.
✔
✔
Field Observation Report FOR000001Report #:
04/22/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:04/22/2025 Technician:Downing, ThomasPlans/Details:CTL|Thompson Report GS06929.000120R1, dated December11, 2024Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes No
Discrepancy Remarks:
Clays encountered in the south and east footing excavation are to be removed and replaced with densely compacted structural
fill material per the report.
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000
120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The silty
gravels encountered on the west side of the excavation are appropriate for footings support, however the clay material exposed
at footing elevation on the east and south sides should be removed and replaced with densely compacted structural fill
material per the report. The contractor was notified of our observations. Additional site visits will be made with required.
Images:
Comments:overall site Comments:gravels exposed in northwest corner
✔✔
Field Observation Report FOR000001Report #:
04/22/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:04/22/2025 Technician:Downing, ThomasPlans/Details:CTL|Thompson Report GS06929.000120R1, dated December11, 2024Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoDiscrepancy Remarks:Clays encountered in the south and east footing excavation are to be removed and replaced with densely compacted structuralfill material per the report.General Remarks:As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The siltygravels encountered on the west side of the excavation are appropriate for footings support, however the clay material exposedat footing elevation on the east and south sides should be removed and replaced with densely compacted structural fillmaterial per the report. The contractor was notified of our observations. Additional site visits will be made with required.Images:
Comments:overall site Comments:gravels exposed in northwest corner
Comments:clays exposed in northeast footing corner
✔✔
Field Observation Report FOR000001Report #:
04/22/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:05/02/2025 Technician:Downing, Thomas
Plans/Details:
CTL|Thompson Report GS06929.000120R1, dated December
11, 2024
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000
120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The
contractor has removed the clayey soils encountered on the south and east sides of the excavation and has achieved
proposed footing subgrade with densely compacted structural fill. We judge the footing excavation as appropriate for
construction of spread footings. The contractor was notified of our observations. Additional site visits will scheduled with our
office when required.
✔
✔
Field Observation Report FOR000002Report #:
05/02/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:05/02/2025 Technician:Downing, ThomasPlans/Details:CTL|Thompson Report GS06929.000120R1, dated December11, 2024Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000
120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The
contractor has removed the clayey soils encountered on the south and east sides of the excavation and has achieved
proposed footing subgrade with densely compacted structural fill. We judge the footing excavation as appropriate for
construction of spread footings. The contractor was notified of our observations. Additional site visits will scheduled with our
office when required.
Images:
Comments:overall site, looking northwest Comments:
structural fill placed and compacted in south footing line
✔
✔Field Observation Report FOR000002Report #:
05/02/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:05/02/2025 Technician:Downing, ThomasPlans/Details:CTL|Thompson Report GS06929.000120R1, dated December11, 2024Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTL|T report GS06929.000120R1, dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. Thecontractor has removed the clayey soils encountered on the south and east sides of the excavation and has achievedproposed footing subgrade with densely compacted structural fill. We judge the footing excavation as appropriate forconstruction of spread footings. The contractor was notified of our observations. Additional site visits will scheduled with ouroffice when required.Images:
Comments:overall site, looking northwest Comments:
structural fill placed and compacted in south footing line
Comments:overall site, looking northeast
✔✔
Field Observation Report FOR000002Report #:
05/02/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
Project:
GS06929.000F305
Ice House Addition
54 Pine Street
Carbondale, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3