Loading...
HomeMy WebLinkAboutDrainage Report345 Saddleback Road Carbondale, CO 81623 Drainage Report December 17, 2025 Existing Conditions The property described as 345 Saddleback Road is located in Garfield County, Colorado limits within the Aspen Glen subdivision, also known as Garfield County parcel number 239513406025. The legal description of the site, as shown on Garfield County GIS, is "Section: 13 Township: 7 Range: 89 Subdivision: ASPEN GLEN FLG #7 Lot: H25 .585 ACRES". The ± 0.585-acre parcel is currently undeveloped, with only one other single-family residence in the area located to the southeast. The other surrounding parcels are currently undeveloped. Saddleback Road Right -Of - Way is located to the east of the site under evaluation. w Shown above is an image of the Garfield County GIS Map displaying the location of 345 Saddleback Road The general topography on the site slopes from the southwest to the north, towards the Aspen Glen Golf Course, with approximately four feet of elevation drop. Grades on the property appear to be relatively consistent with an average slope of around five percent. The northern area of the site steepens up as it approaches the Aspen Glen Golf Course property. Slopes begin to approach 4:1 in this area and steepen more within the Aspen Glen Golf Course property. Vegetation of the site consists of native grasses. There are little to no mature trees located on the parcel. It is assumed the area was cleared when the Aspen Glen subdivision was developed. Crystal River Civil LLC 970.51fl.D312 Page 1 of 7 F�M Proposed Conditions The proposed scope of the project includes the construction of a single-family residence located within the defined building area of the site. The development includes an attached garage, concrete driveway and autocourt, hardscaped patios, and extensive landscaping surrounding the residence. Drainage swales, inlets, and a trench drain are proposed surrounding the residence to provide positive drainage away from the residence. All tie-in grades to existing topography do not exceed 4:1 to meet Aspen Glen HOA development requirements. Three -foot -high berms are proposed to the south and east of the residence to provide privacy from Saddleback Road. Driveway centerline slopes do not exceed five percent, including the autocourt area. The autocourt also functions as a turnaround area for all vehicles. The stormwater runoff created by proposed conditions will be collected by drains, downspouts, and drainage swales, which all convey the stormwater to a single drywell located just northeast of the residence near the northeastern property corner. All roof areas are collected by downspouts, which will tie into the proposed pipe network to be conveyed to the drywell. All patios sheet flow towards drainage swales or drains, which tie into the pipe network and terminate at the drywell for detention. Drainage Analysis Multiple inlets, downspouts, swales, and a trench drain collect runoff from the proposed impervious and pervious areas, as well as areas that slope towards the structure from the south and west. The entirety of the proposed residence will be conveyed to the proposed drywell via a pipe network and overland swales. All impervious areas are collected by this system. The drywell will overflow from the grated rim if a storm event exceeding the 100-year, 1-hour storm event occurs because it is located at the natural low point of the site. A controlled outlet pipe is proposed at the drywell to release runoff at the predeveloped flow rate of the captured drainage basin. The runoff is routed towards the Aspen Glen Golf Course pond located to the north of the property. This drainage analysis uses procedures that have been standardized by the Mile High Flood District's Urban Storm Drainage Criteria Manual, or the USDCM. Peak flows of the site have been calculated using the Rational Method to determine the impacts the proposed project has on the existing conditions and to verify the capacity of the proposed infrastructure. This method uses the analyzed basin's area, soil type (assumed soil type B), percentage of imperviousness, time of concentration, and the historic storm data from NOAA Atlas 14 to determine the maximum flow rate from a specified storm event. The Rational Method uses the equation below to determine the Maximum Flow Rate: Q=CIA Where, - Q is the peak stormwater runoff rate, in cubic feet per second - C is a runoff coefficient of the drainage area - I is the storm intensity, in inches per hour Crystal River Civil LLC 970,510.5312 Page 2 of 7 2 - A is the area of the drainage basin, in acres The Runoff Coefficient, C, is determined using table 6-5 from the USDCM. To determine the storm intensity, I, equations for each storm event were derived from AutoCAD Civil 3D Hydraflow analysis software using NOAA Atlas 14 data. For smaller basins with a time of concentration of less than five minutes, a time of concentration of five minutes is assumed — when smaller times of concentration are used in the Rational Method, the results tend to be inaccurate, as per the USDCM. The rainfall event used for this analysis is for a 10-year, 1-hour and 100-year, 1-hour storm events. Below are tables summarizing the calculations to determine the predeveloped and developed conditions for the onsite basins. T 10•Year I-Hwr 0nsite Peak Disclrarge Calculations RalnfalldoI 0_777e SON Class .. �1. 5?.42se I�,P. +Te1°i•" Dftchargn{ftrrSsCj i::-•_;.. rvxe For basins with a flow length of less than 5001feet, a Time of Concentration is assumed at 5 minutes. These calculations are assuming a NRCS Hydrologic Soil Class B Rainfall depth values derived from NOAA Atlas 14 data Intensity equation has been derived from the Aspen area NOAA Atlas 14 IDF Curve. Predeveloped Conditions .. sawn • . FP1tri _ C ValuC ifmc of CancanvalSon PeAk 016aharfle tl3rrio• A.-r A. A'] I AJ r-.,l 1_'mir+ I{irNv; fCrhoc 1 17587 0 0 00% 0.040 3 65 0.06 Developed Conditions - $i11iq tall Argo kip pWous Aram Pam C Vallue illne of Concantr4UM enensay _ I ..PON Owdmm _ tt"� t Aye. +9088 c :mr.�� IIrr:R+• 'R':si, y 1 17587 51.57% 0460 5 3,65 0.66 I00-Year I Haur 011site Peak Disc ha Cafe s RainiawdeplhPl�tt iMb[e7j 3 In:pnsltyStritt) lzv.H16 != [l1A s tr Tr] diRclWrgn�/$pC] �=-1", Mote For basins with a Flow length of less than 500 feet, a Time of Concentration is assumed at 5 minutes. These calculations are assuming a NRCS Hydrologic Soil Class B j R;rrifa!I depth values derived from NOAA Atlas 14 data. Intensity equation has been derived from the Aspen area NOAA Atlas 14 OF Curve. lPredeveloped Conditions Hash Totai Afar MW&NIwit Area Percald iryrlkerviau■ CYspit: 111111105tlf 6oltt nlUon Peak llkih tr . ;Namq. A, (rt"t A.,n'• i n,-k--' I T.lra¢ll 1 17587 0 r 0 00-A 0 430 5 594 1.03 Developed Conditions a," Area Prruclnt ■ C V41utr Trine Of Corloe!'Rrati= WHIR RY Peak Elk Man ­ A m r ! VYn 'l,rt1 1 17587 9088 5167% - 5 5-94 1.58 The onsite drainage conveyance structures proposed with this project have been designed to have capacity for a 100-year, 1-hour storm event. The basins have been divided into sub -basins, which were analyzed for each inlet and pipe. Spreadsheets showing these calculations are shown below. Crystal River Civil LLC 970.510.5312 Ba5tn Flow Rate Calculations •.� . _. son Ci A l; intans#iy (rnlhr) I =(l12GafA �, Dischsrlpa ln' S6c} Q=Cl6, 1i+Fa7 pv-alues'.I.-n inthis table are analysing a 100-Year 1-Hour Storm Event. For basins with a flow length of less than 500 feet, a Time of Concentration of 5 minutes is assumed, onditions Srr6Oaa8t alai Aroma krCmYhxq Anet is t iays _ ... GVof„e _ iinxlofCanrenVatlon Inten FIow.Rnle Nanse} A W A, 11 NAt M) G irrom Tablet 7 mir'� t iM► ' j R'Isac 1.1 470 470 100 WV. 089 5 594 0.06 1.2 249 249 100.00°h 089 5 5.94 0.03 1.3 3.078 1,463 47.53% 064 5 5.94 0.27 1.4 537 537 100 00% 029 5 5.0-4 0.07 1.5 227 0 0.00% 043 5 594 0.01 1.6 414 414 10Q00 % 0.89 594 0.05 1.7 981 981 100.00Y 0.89 5 5.94 0.12 1.8 129 129 1fl0.00k 0.89 5 5.94 0.02 1.9 271 271 100 00% 0.60 5 594 0.03 1.10 159 159 100.00°/ 0.89 5 594 0.02 1.11 388 388 100.00"4 0.89 5 5.94 0.05 1.12 191 0 0 00 % 043 5 5.94 0.01 1.13 434 434 10000 % 0.89 5 594 0.05 1.14 552 552 100.WG' 089 15 594 0.07 1.15 552 552 100,00% 0.89 5 5.94 0.07 1.16 2,856 257 8.015% 0.45 5 594 0.18 1.17 2,221 221 9.95% 0.45 5 594 0.14 1.18 350 350 100.00% 0.89 5 5 94 0." 1.19 365 365 100.00% 0.89 5 594 0.04 1.20 509 509 100.00 o/I 0.$9 5 9•: 0.08 1.21 290 290 100 00% 0.89 5 5 94 0.04 1.22 2,364 497 21.02 % 1 a 52 5 594 0.17 Crystal River Civil LLC 970.510.5312 Page 4 of 7 Pipe Capacity Calcutations I ipe $6C-Nort ' . _ - �� .. . - hi a11111ti9 CiSYOw.10at, n G.01 A1annlnds Equ4tio,i Ift' 511 L'r = to < `, 81' tii Hvt Pipe Flow Rate (Qp) is the summation of the flow rates from the the collected sub basins through each pipe, or os Pipe CoAt yad Sub Basins' P7pa t fuw Race Stope Prop:Pipe DTerneter Pipe Svewrlol Area Pipe Max Flow Rate Pei c8es! et Cap�ciy. (Name) # 0 ft'f9eC S e°pl O Irt A- rt Q W0 s'r Al 1.S 0.D6 2.00% 4 0.087 0.351 0,16 A2 1A 0.06 200% 4 0.087 Sk351 0.16 A3 1.1-1.2 0.09 200% 4 0.087 0.351 0.25 A4 1,3 0,27 2.00% 4 M87 0.351 0.77 A5 1 A -1.3 036 2.00 % 6 0 196 1.034 O,3d A6 1.1-1.3 0.36 200% 6 0196 1.034 0.34 A7 1.4 0,07 2,00% 4 0.087 0.351 0.13 A8 1.4-1.5 0.08 200% 4 OW 0.351 0.22 A9 1.6 0.05 2-00% 4 0 087 0.351 0.14 A10 1.4-1.6 0.13 2.00%- 4 0.087 0.351 0.37 All 1.4-1.7 025 2.00% 4 0.087 0.351 0.71 Al2 1.4-1.a 0.26 2.00% 1 4 0 087 0.351 0.75 A13 1.1-1.8 0.62 2.00 % 6 0.196 1.034 0.60 A14 1.1-1.9 0.65 200% 6 0,196 1.034 0.63 .A15 1.10 0.02 2.00% 4 0 087 0 351 0.06 A16 1.1-1.10 0.67 2.00% 6 0 196 1.034 0.65 B1 1.11 0.05 2.00% 4 0 087 0.351 0.13 B2 1.11-1.12 0.06 2.00% 4 0 067 0.351 0.17 B3 1,13 0.05 2,00% 1 4 0.087 CL351 0.15 B4 IA 1-1.13 0.11 2 00 % 4 0.087 0,351 0.32 85 1.14 0.07 200% 4 0.087 0,351 0.19 B6 114-1.15 0.13 2.00% 4 0.087 0.351 0.38 B7 1.11-1.16 D-42 200% 6 0.196 1.034 0.41 B8 1.11-1.17 q56 2.00% 6 0.196 1.034 0.54 B9 1.18 0.04 2.00% 4 0.087 0.351 0.12 Bic 1.11-1.18 aso 2.00% 6 0.196 1.034 0.58 811 1.11-1.18 0.60 1.00 % 6 0.196 0.731 0.82 B12 1.19 0.04 200% 4 0.087 0.351 0.13 813 1.19-220 011 200% 4 Q087 0,351 0.30 814 1.11-1.20 0,71 1.00 % 6 0,196 0 731 0.97 B15 1.21 0.04 2,00% 4 0.087 0.351 0.10 B16 1.11-1,21 0.74 2,00% 6 0.196 1.034 0.72 ,y Enatylve @7ki Wru1, A, iR 1 nr "i i - tyilnrDrlt=l.4n. Round Inlet CaPacltY Calculation inYvk DrEre C.ap�c.ty. Q. { Q, : t;,.�,V :'p1. v4j➢ rr HaCa peony. Q. W-Owl ✓'i,. • �..};' Crdt CJ*rOcWnt.C, ass Ct it FaCwr,C 0.5, Ar-Opr- an CAPWft Ra 0,R 0.6 3 tntat.Y 015 "&:Wc IV" Li' UL P, 3 P,n I -C, P imm AS -inlet 1.5 - 0 F3rwzwWa-A a Ot%.-Floc.Caluaty " t71 fsi MWr10 cap=ay S3 3uhbaskt t7:Rr '1.01 1124nlet 1.12 8 - -- - B74nlet 1,18 12 7 N '- 0.10 815-Inlet 1,21 8 t 1'�__ _ 0•� Drywell ARim 1.22 24 L.C4 0.17 Crystal River Civil LLC 970.510.5312 Page 5 of 7 -- R octang ula r hies Capa c hy'Uk utation fft t*w NWAm; kmt1 •' I1-y�'~ 71 LNIRara CN. 0,Wh1 CVr/k',a:.oiRKia1LC 0.65 L Fyr.(p,C N►.f rth� cnWwJT1 RMb,ir LiNv Coeur _ C Wa+rlt ovol A..a�'e Wn Y 441 ErMUl.'6 W-W M- A ?bI I P. • :1-, P N1rr AsCaCpM1Kf S,itw: un YyRt-�FfrO�. MiN YV14A E17:-'9.v 1.riY. AVM LhCKn FWx Cu;laAy the ik�Jir ".=�. 5utaia�l+F7o1V The Town of Carbondale requires stormwater runoff from a development site to not exceed more than the historic runoff. For this design, CRC is proposing using historic data from a 100-year, 1- hour storm event. Detention is necessary to offset the increased flows from proposed impervious areas to be released at the historic rate. An analysis has been performed using the FAA Method to determine this necessary detention volume. See the table below displaying the calculations for the maximum difference between the stormwater volume entering the system and volume leaving the system. FAA Mothod Detention Volume Calculations Sash Number I Swim Eve nISlza 1oaar 1-HW Rain Sal] De pili, P, (Inj 19 Developed B.Wn C Valua 0.66 Basin Tlma of ConcentratJDm.Tz min 5 Basin Area. 17587 Pradevelo erd Flow Pale ek. 1,03 RAIntall Duration Swrt (rnln] 5 tntentiryUnlhh s 01a 1 (11.44 Td)^" Developed Volume In (R�) V,=iF,n-a7dA PmdavaWW Vohtrns vt' V. - NO s 7 "in Volume (t(') V=V.Va This AnaWs Uses the Federal Atialion Association Stormwater tvlanagement Whod. By Calculcl,m i the Difference in the Volumas, the Capacity Required for Detention is Determined. _• .ARWt+ADuMbim hlwwfly t).eve Ow etadavoioped Vole V SISI Volume ❑ilferdIXC V WIS T,, min) I(ttvlxl V '1s 5 5.94 479.19 309.62 169.57 6 5.57 538.97 340.58 198.39 7 5.24 591.51 371.54 21997 8 4.95 637.99 402.51 235.48 9 4.68 679.34 433.47 245.87 10 4.44 716.32 464.43 251.89 11 4.23 749.55 495.39 254.16 12 4.03 779.54 526.35 253.18 13 3.85 806.71 557.32 249.39 14 3.68 831.41 588.28 243.14 - - i1tAldnplfri i 254,16 To meet this required storage, the storm system will convey runoff to the drywell, with an outlet that releases via a pipe with a designed orifice plate towards the Aspen Glen Golf Course pond to the north. The proposed 270 cubic feet of storage meets the requirement of a 100-year, 1-hour event for Basin 1. Sizing for the drywell is shown in the table below. Crystal River Civil LLC 970.510.5312 Page 6 of 7 Stara p Calc ulaf Inn - DryvmMl trnamJll Caparlry, V�} E>I:nmaitanac°Y.V. fll� - -- - .. 4amki�m7 GC �N. V {h'1 �'�11 Mnme R:ian.enlfSufs. i 6[.: dRs.lne±f� Siwua. f5.rkyf T Grarel Fsevfhe LfSe r-fal Cd�:o+X. j' �L![t�Li GNa[#Y i.Ol�1�MOd �..a�KY CN7CYuf1/3 Vukem. liA �.M :�� To utilize the FAA Rational Method of storage volume for detention, a controlled outlet pipe from the drywell that releases stormwater at the predeveloped peak flow rate of the site for a 100-year storm event is required. A three-inch orifice plate is called out on the design drawings for the drywell included with this civil plan, utilizing the orifice calculation below. Historic Release Orifice Calculation Coefficient of Discharge (ca) 0.62 32.2 5053.20 5052 1.20 Sharp Edged Ws ft ft ft i Gravitational Constant (g) Rim Elevation ormce Elevation Etevation Differance (h) Note- This calculation uses the Bernoulli Equation to determine the historic, pre- deve Ioned flow rate throw h an orifce at drains e s tem outlet. Historic Flow Rate (4) Area of Orifice A) Orifice Dlameter (De) ft3is Aa J c• f, -A ft I Da — ,—_-, inches 1.03 0.21 3.07 For location, sizing, and all information regarding the stormwater design please see the civil grading and drainage plan. If there are any comments regarding the stormwater analysis performed for the site, feel free to contact me directly. Vince Tomczak Principal, P.E. O `p4 � Crystal River Civil LLC V:� �• fi0; p vince C stalRiverCivil.com (970) 510 - 5312 ;.- �51' Crystal liver Civil LLC 970.510.5312 Page 7 of 7