Loading...
HomeMy WebLinkAboutRevised OWTS Plan5962 5 9 6 1 5 9 6 2 5962 5959 5963 5964 5965 5966 596 1 5960 595 8 5957 5956 5955 5954 5955 SOIL PROFILE PIT 01-05-25 INSTALL 540 GALLON INFILTRATOR IM SINGLE COMPARMENT EFFLUENT DOSING TANK OR EQUAL W/ 30" DIA. BY 48" DEEP RIBBED PVC RISER W/ LID AT THE SURFACE. INSTALL ORENCO BIOTUBE DUPLEX EFFLUENT PUMP ASSEMBLY. (PVU57-1819-L) W/P300511 PUMPS), W/ 2 SEPARATE 1.5" DISCHARGE ASSEMBLIES. NO PRE ASSEMBLED DISCHARGE ASSEMBLIES WITH CHECK VALVES OR ISOLATION BALL VALVES ARE REQURIED. USE INDIVIDUAL PARTS INSTALL ELECTRICAL WIRES IN CONDUIT FROM HOUSE ELECTRIC SERVICE TO REMOTE CONTROL PANEL INSTALL 1.5" FLUSH BALL VALVE ON DISTAL END OF EACH DISTRIBUTION LATERAL CENTERED BELOW EACH INSPECTION PORT (TYP. END EA. ROW)EXTERNAL SPLICE BOX INSTALLED WITH ELECTRICAL/CONTROL WIRES FROM CONTROL PANEL (SEE ELECTICAL/CONTROL NOTES) 4" SCHD-40 PVC GRAVITY SEWER PIPE @ 2%, INSTALL 4" RISER PIPE INSPECTION PORT PIPE FROM DISTAL END CHAMBER IP FLANGE. EXTEND RISER W/ PUSH ON CAP 3" BELOW FINISH GRADE & COVER WITH 6" DIA. VALVE BOX SET WITH LID 1" ABOVE FINISH GRADE (TYP. EACH CHAMBER ROW END CAP) INSTALL END CAPS AT END OF ALL CHAMBERS ROWS 1.5" PVC MANIFOLD WITH CONNECTION FITTINGS TO EACH PERFORATED DISTRIBUTION LATERAL INSTALL 2-COMPARTMENT 1500-GALLON PLASTIC SEPTIC TANK (INFILTRATOR IM-1530 SEPTIC TANK) INSTALL WITH (2) 24" DIA. BY 24" DEEP RIBBED PVC RISERS W/ LIDS AT THE SURFACE. DEPTH TO TOP OF TANK FROM PROPOSED GRADE IS APPROX. 2.0'. 1 1/2" PVC SCHD-40 CUSTOM PERFORATED DISTRIBUTION LATERALS. DRILL 5/32-INCH DIA. ORIFICES EVERY 2.5-FEET ALONG PIPE. ELECTRICAL AND CONTROL NOTES: 1. INSTALL AN ORENCO MODEL S1ETMCT, DUPLEX CONTROL PANEL, 110 VOLT ELECTRICAL SERVICE FOR PUMPS AND CONTROLS FROM HOUSE CIRCUIT BREAKER OR OPTIONAL MOUNTED REMOTE SUB-PANEL TO BE INSTALLED. INSTALL CONTROL PANEL ON EXTERIOR WALL MOUNT WITH SOUND PROOF BOARD BETWEEN BACK OF PANEL AND WALL. 2. ELECTRIC SERVICE PANEL TO HAVE 2 DEDICATED 20 AMP CIRCUITS W/ 12-GAUGE, 12-2 WIRE W/ GROUND FOR PUMPS POWER AND 1 DEDICATED MIN. 10 AMP CIRCUIT W/ MIN. 14 GAUGE , 14-2 WIRE W/ GROUND INSTALLED IN CONDUIT TO CONTROL PANEL 3. ELECTRICIAN TO SET PANEL AND CONNECT PUMP AND CONTROL ELECTRICAL SUPPLY WIRES TO REDUNDANT CIRCUIT BREAKERS IN CONTROL PANEL. 4. ELECTRICIAN OR SERVICE PROVIDER TO INSTALL 12-2 WIRES W/ GROUND FOR PUMP POWER AND 14-6, DIRECT BURY TRAY CABLE FOR FLOATS, IN CONDUIT(S) FROM CONTROL PANEL TO EXTERNAL SPLICE BOX MOUNTED ON DOSING TANK ACCESS RISER 5. QUALIFIED SERVICE PROVIDER TO CONNECT INSTALLED WIRES FROM CONTROL PANEL TO THE RESPECTIVE PUMP AND FLOAT WIRES INSTALLED IN THE EXTERNAL SPLICE BOX SOIL TREATMENT AREA INSTALL 48 ARC-36 CHAMBERS IN TWO BEDS WITH 3 ROWS OF 8 CHAMBERS PER ROW FOR A TOTAL ABSORPTION AREA OF 700 S.F. THE BOTTOM OF EACH BED TO BE EXCAVATED TO AN AVERAGE DEPTH OF 30 INCHES BELOW THE EXISTING SURFACE GRADES. THE ABSORPTIVE SURFACE TO BE SCARIFIED AT LEVEL GRADE. CHAMBERS TO BE COVERED WITH FILTER FABRIC AND BACKFILLED TO A MINIMUM 3" ABOVE EXISTING PERIMETER GRADES INSTALL 4" INSPECTION PORT EXTEND PIPE RISER FROM END CHAMBER IP FLANGE TO FINISH GRADE W/ PUSH ON CAP & COVER WITH 8" DIA. VALVE BOX SET WITH LID 4" ABOVE FINSH GRADE (TYP. EACH PROXIMAL & DISTAL END CHAMBER EACH ROW ) E T C E T C E T C 1. 5 ' ' 1. 5 ' ' 1. 5 ' ' EX 4" PVC EFFLUENT PIPE O BE ABANDONED IN PLACE EXISTING 2-COMPARTMENT 1250-GALLON CONCRETE SEPTIC TANK PUMP, BREACH, CRUSH LID & BACKFILL TO ABANDON IN PLACE EX 4" CI SEWER PIPE RECOVER CUT & ABANDON EXISTING SEEPAGE PIT TO BE ABANDONED IN PLACE DUAL 1.5" SCHD-40 TRANSPORT PIPES W/ 1.5' MIN. DEPTH OF BURY. INSTALL AT MIN. 2.5% FOR DRAINAGE BACK TO TANK INSTALL (2) 4" SDR-35 RISER PIPE PIEZOMETER INSPECTION PORT WITH PUSH ON CAP AT EACH CORNER OF EACH BED. EXTEND VERTICALLY FROM 3" BELOW FINISH GRADE TO INFILTRATIVE SURFACECOVER WITH 6" DIA. VALVE BOX SET WITH LID 1" ABOVE FINISH GRADE (TYP. EACH PROXIMAL CORNERS OF EA. BED) INSTALL 4" 2-WAY CLEANOUT 10.0' 10.0' 50.0' 20.0' 6.0' 9.0' 40.5' 6.0' INSTALL ORENCO S1 PUMP CONTROL PANEL 6X6 POST/STRUT OR WALL-MOUNTED W/ SOUND BOARD INSTALLED ON BACK OF PANEL. OPTIONAL ELECT SUB-PANELMAY BE CONSIDERED DATE REVISION TCP - CORRECTED NUMBER OF CHAMBERS IN EACH BED. C-1.0 DRAWING NO. TITLE G: \ 2 0 2 6 \ 3 6 0 0 0 3 1 5 W E S T B A N K \ C I V I L \ C I V I L D W G S \ D E \ 3 6 0 0 0 - D E - O W T S P L A N - T C P R E V . 2 0 2 6 - 0 1 - 1 5 . D W G - J a n 1 5 , 2 0 2 6 - 3 : 1 5 p m NO R T H 01/15/26 OWTS DESIGN CONSTRUCTION PLAN 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R 36000.01JOB NO. DATE:01-08-25 DESIGNED BY DRAWN BY CHECKED BY PER PER YTN TH O M P S O N , F A M I L Y P R O P E R T Y 31 5 W E S T B A N K R D , G L E N W O O D S P R I N G S , GA R F I E L D C O U N T Y , C O OW T S C O N S T R U C T I O N P E R M I T A P P L I C A T O N SO P R I S E N G I N E E R I N G L L C 50 2 M A I N S T R E E T S U I T E A 3 C A R B O N D A L E C O 8 1 6 2 3 (9 7 0 ) 7 0 4 0 3 1 1 s o p r i s e n g i n e e r i n g . c o m ' 24" 9'. 12" - 18" NOTE: THE CHAMBER BED MUST BE LEVEL. INSTALL CHAMBERS WITH INLET AND END CAPS OVER NATIVE SCARIFIED SOIL. INSTALL INDIVIDUAL DISTRIBUTION LATERALS TO THE HEAD OF EACH CHAMBER ROW FROM A COMMON MANIFOLD FOR EACH BED. CUSTOM PERFORATED PIPE TO BE LAID ON TOP OF THE ABSORPTIVE SURFACE WITH ORIFICES ORIENTED UPWARD EXCEPT THE FIRST AND LAST ORIFICES TO BE ORIENTED DOWNWARD. INSTALL A 4" VERTICAL INSPECTION RISER FROM THE MOLDED CUT OUT ON THE LAST CHAMBER IN EACH ROW. INSTALL A BALL VALVE AT THE END OF THE DISTRIBUTION LINE ACCESSIBLE FROM THE INSPECTION PORT TO ALLOW FLUSHING OF THE LINE. 1.5" TEE CONNECTION 1.5" SCHD-40 PVC DISTRIBUTION MANIFOLD SEED AND MULCH FINISH SURFACE MAINTAIN SUITABLE VEGETATIVE COVER CROWN FIELD TRENCH TO DIVERT SURFACE WATER EXISTING GRADE UNDISTURBED EARTH SCREENED BACKFILL NATIVE SOIL CHAMBER UNIT ( SPRAY SHIELD) QUICK-4 OR ARC-36 BIO DIFFUSER PRESSURE DISTRIBUTION CONNECTED THROUGH END CAP TO CUSTOM PERFORATED LATERAL PIPE SCARIFY/TILL BOTTOM SURFACE AND EXCAVATION SIDE WALLS NATIVE SILT LOAM 3'1.5' CUSTOM PERFORATED PRESSURE PIPE WITH ORIFICES AT 12 O'CLOCK. SECURE PIPE WITH PUSH IN STAPLES TOPSOIL SET 4" INSPECTION PORT RISER PIPE ON END CAP OR END CHAMBER PRE FORMED PENETRATION, SECURE WITH SHORT SCREWS THROUGH FLANGE INTO PIPE 6" VALVE BOX 4" PVC INSPECTION PORT RISER 4" PUSH ON CAP QUICK-4 INFILTRATOR OR EQUAL ARC-36 CHAMBER SET 4" INSPECTION PORT RISER PIPE ON END CAP OR END CHAMBER PRE FORMED PENETRATION SECURE WITH SHORT SCREWS THROUGH FLANGE INTO PIPE 6" VALVE BOX 4" INSPECTION PORT RISER 4" PUSH ON CAP 4" INSPECTION PORT RISER DISTRIBUTION SYSTEM NOTES: 1. FILTERED EFFLUENT WILL DISCHARGE VIA A DUPLEX HIGH HEAD PUMP BIOTUBE DISCHARGE ASSEMBLY WITH INDIVIDUAL TRANSPORT PIPES TO A MANIFOLD PIPE AT THE HEAD OF EACH CHAMBER BED. THE SYSTEM WILL BE OPERATE TO PROVIDE ALTERNATE DOSING TO EACH BED. THE CONTROL PANEL WILL HAVE A LAG SWITCH. 2. THE DISTRIBUTION SYSTEM WILL BE INSTALLED TO ALLOW FOR EFFLUENT TO BE ALTERNATELY AND EQUALLY DISTRIBUTED ACROSS THE ABSORPTION SURFACE IN EACH CHAMBER BED VIA INDIVIDUAL CUSTOM PERFORATED DISTRIBUTION LATERALS INSTALLED ON THE SURFACE ALONG THE ENTIRE LENGTH OF THE CHAMBER ROWS. A BALL VALVE WILL BE INSTALLED ON THE TERMINAL END OF EACH DISTRIBUTION LATERAL CENTERED BELOW A 4" INSPECTION PORT. 3. THE MINIMUM SLOPE OF THE TRANSPORT PIPE FROM THE TANK'S DOSING COMPARTMENT TO THE BED MANIFOLD SHALL BE A MINIMUM 2.5% UPWARD SLOPE TO ALLOW FOR DRAINBACK TO THE TANK. OWTS SYSTEM NOTES: 1. ALL MATERIALS AND INSTALLATION SHALL CONFORM TO STATE AND COUNTY ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) REGULATIONS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION AND EXCAVATION. 3. ALL SEWER LINES TO BE SDR-35 OR SCHEDULE 40 P.V.C. PIPE UNLESS NOTED OTHERWISE. 4. INSTALL A TWO-WAY CLEAN OUT ON THE SERVICE LINE FROM THE HOUSE AND AN ADDITIONAL CLEANOUT WITHIN 100' SECTION OF EFFLUENT DISCHARGE PIPE . 5. THE SEPTIC TANK SHALL BE INSTALLED LEVEL ON COMPACTED EARTH. INSTALL WATERTIGHT RISERS AS NECESSARY TO BRING ALL REQUIRED ACCESS POINTS TO THE FINISHED SURFACE GRADE. BACKFILL WITH SUITABLE NATIVE SOIL FREE OF BOULDER AND ROCK IN EXCESS OF 3" DIAMETER. 6. A SANITARY BAFFLE TEE IS REQUIRED ON THE SEPTIC TANK INLET AND OUTLET. INSTALL THE INLET AND OUTLET TEES PLUMB AND IN A POSITION TO ALLOW EASY INSPECTION AND MAINTENANCE OF TANK FROM THE TANK RISERS. 7. INSTALL A 4" EFFLUENT FILTER ON THE 4" OUTLET TEE OF THE SEPTIC TANK. THE FILTER SHOULD BE INSPECTED EVERY SIX MONTHS. THE EFFLUENT FILTER SHALL BE MAINTAINED AND CLEANED WHEN THE TANK IS PERIODICALLY PUMPED OR AS NECESSARY. INSTALL A SUITABLE EXTENSION ON THE FILTER WITH A HANDLE TO BE WITHIN 6" BELOW THE ACCESS LID. 8. THE CONTRACTOR SHALL ENSURE THAT THE SEWER LINES, SEPTIC TANK AND RISERS ARE WATERTIGHT. ALL PLUMBING FIXTURES AND OWTS COMPONENTS SHALL BE INSTALLED AND MAINTAINED TO AVOID SURFACE OR GROUNDWATER FROM ENTERING THE SYSTEM AND TO PREVENT LEAKAGE FROM THE SYSTEM. IN-HOUSE PLUMBING FIXTURES SHALL BE MAINTAINED TO PREVENT EXCESS WATER FROM ENTERING THE SEPTIC SYSTEM. 9. THE DIMENSIONS AND NOTES SHOWN ON THE PLAN INDICATE MINIMUM AREA, LENGTH, WIDTHS AND SEPARATION DISTANCES FOR THE TRENCHES, BED OR MOUNDED ABSORPTION FIELD. 10. THE ABSORPTION TRENCHES SHALL BE EXCAVATED TO LEVEL GRADE IN NATIVE EARTH. THE TRENCH BOTTOM AND SIDEWALLS SHALL BE SCARIFIED AND/OR RACKED IF SMEARING OCCURS. IF EXCESSIVE LARGE COBBLES OR BOULDERS ARE ENCOUNTERED IN ANY PART OF THE EXCAVATION OVER 6" FROM THE PROPOSED TRENCH BOTTOM SURFACE, OVER EXCAVATE AND BACKFILL WITH SAND. 11. THE LEACHING CHAMBERS SHALL BE INSTALLED LEVEL WITH A MINIMUM COVER OF 10 INCHES NOT TO EXCEED 24 INCHES. 12. LEACHING CHAMBERS WILL BE PLACED IN THE EXCAVATION OVER THE NATIVE SOIL OR SELECT SOIL REPLACEMENT. END CAPS SHALL BE INSTALLED ON THE END CHAMBERS IN EACH TRENCH. 13. VERTICAL INSPECTION PORTS SHALL BE INSTALLED FROM THE PRE MARKED HOLE ON THE TOP OF EACH END CHAMBER . (TYP. BOTH ENDS OF EACH ROW) . 14. THE CHAMBERS WILL BE BACKFILLED WITH EXCAVATED MATERIAL VOID OF ROCKS, THE BACKFILL MATERIAL SHALL NOT EXCEED 2 1/2" DIAMETER AND SHALL BE PLACED TO AT LEAST 6 INCHES ABOVE THE TOP OF THE CHAMBERS. THE TOP OF THE PLACED BACKFILL SHALL BE COVERED WITH A LAYER OF FILTER FABRIC. A MINIMUM 4" DEPTH OF TOPSOIL IS TO BE PLACED ABOVE THE BACKFILL TO THE SURFACE & RE VEGETATED. 15. INSTALLATION OF LEACHING CHAMBERS SHALL BE IN CONFORMANCE WITH THE MANUFACTURES INSTALLATION INSTRUCTIONS. 16. THE ABSORPTION TRENCHES/BED OR MOUND MUST BE GENERALLY MARKED AT THE FOUR CORNERS WITH INSPECTION PORTS AND/OR BURIED REBAR. THE FIELDS MUST BE PROTECTED FROM VEHICULAR AND LIVESTOCK TRAFFIC. 17. THE ABSORPTION FIELD SURFACES MUST BE SLOPED OR SLIGHTLY MOUNDED TO DIVERT SURFACE DRAINAGE AWAY FROM THE FIELD. 18. THE ENTIRE ABSORPTION FIELD SURFACE MUST BE RE VEGETATED. 19. THE ABSORPTION FIELD SHALL BE INSTALLED PER THE REQUIRED SETBACK DISTANCES: 10 feet from any property line. 25 feet from any potable water supply line. 20 feet from any dwelling with basement or crawlspace. 100 feet from any well, spring or cistern. 50 feet from any stream or water course. 1. THE OWTS AS SHOWN ON THE PLAN AND THE DETAILS WERE DESIGNED BY SOPRIS ENGINEERING. 2. THE EXISTING LOT CONDITIONS SHOWN IS BASED ON GIS MAPPING AND LIDAR BY SOPRIS ENGINEERING. 3. PRIMARY OWNER NAME AND ADDRESS: Thompson, Family Joint Rev Trust 0073 Native Lane Glenwood Springs CO 81601 4. SITE ADDRESS: 315 Westbank Rd, Glenwood Springs, 81601 5. LEGAL SUMMARY: Section: 2 Township: 7 Range: 89 Subdivision: WESTBANK RANCH SUB. #3 Lot: 1 1.06 ACRES 6. Parcel Number: 39502103001 7. PREVIIOUS ISDS PERMIT # 358, NEW COUNTY OWTS PERMIT #: ____________, ISSUED _________ 8. CONTRACTOR: Voskuil Operations 1. ADDITIONAL ASSESSMENTS AND RECOMMENDATIONS WILL BE MADE BY THE ENGINEER DURING INITIAL STAGES OF CONSTRUCTION TO VERIFY ASSUMPTIONS MADE FOR THE OWTS DESIGN INCLUDING VERIFICATION OF SOILS, STA LAYOUT, EXCAVATION DEPTHS, THE LOCATION OF THE SEWER/DISTRIBUTION PIPING, COMPONENTS AND INSTALLATION OF APPURTENANCES. 2. PRIOR TO CONSTRUCTION OF THE PERMITTED SYSTEM THE ENGINEER SHOULD BE CONTACTED BY THE PROJECT MANAGER/CONTRACTOR WELL IN ADVANCE TO PROVIDE ADEQUATE TIME TO DISCUSS THE SYSTEM COMPONENTS WITH THE CONTRACTOR, ANSWER QUESTIONS, RESOLVE ANY CONFLICT ISSUES AND SCHEDULE INSPECTION SITE VISITS BASED ON CONSTRUCTION PROGRESS. A PRE-OWTS CONSTRUCTION MEETING WITH THE ENGINEER AND CONTRACTOR IS ESSENTIAL AND REQUIRED PRIOR TO INSTALLATION OF THE OWTS COMPONENTS. 3. REGULATIONS REQUIRE THAT THE DESIGN ENGINEERS OF RECORD PERFORM SITE INSPECTIONS OF THE PERMITTED SYSTEM DURING CONSTRUCTION AND PROVIDE "AS-CONSTRUCTED" DOCUMENTATION OF THE INSTALLED SYSTEM TO THE THE COUNTY LPHA AFTER CONSTRUCTION IS COMPLETE. THE ENGINEER SHOULD BE CONTACTED AND NOTIFIED OF THE CONSTRUCTION SCHEDULE TO PERFORM TIMELY INSPECTIONS, PROVIDE DIRECTION TO CONTRACTOR REGARDING THE INSTALLATION OF THE OWTS COMPONENTS AND AT LEAST 48 HOURS PRIOR TO FINAL BACKFILL OF COMPONENTS. 4. THE COUNTY ENVIRONMENTAL HEALTH DEPARTMENT SHOULD BE CONTACTED AT LEAST 48 HOURS PRIOR TO FINAL BACKFILL OF COMPONENTS TO PROVIDE ADVANCED NOTICE OF CONSTRUCTION SCHEDULE IN ORDER TO PERFORM A FINAL INSPECTION OF THE IN PLACE COMPONENTS. THE GARFIELD COUNTY ENVIRONMENTAL HEALTH DEPARTMENT CONTACT NUMBER IS 970-945-6614 X 8106 (MAIN OFFICE). 5. OUR DESIGN AND RECOMMENDATIONS ARE BASED UPON OUR EVALUATION OF THE EXISTING AND PROPOSED SITE CONDITIONS, THE DEVELOPMENT PLANS AND INFORMATION SUPPLIED TO US BY OTHERS. IF DEVELOPMENT PLANS OR SITE CONDITIONS ARE FOUND TO BE DIFFERENT FROM CONDITIONS ASSUMED OR INDICATED, WE SHOULD BE NOTIFIED TO EVALUATE ANY EFFECT ON THE PROPOSED OWTS. 8. CONTRACTOR SHOULD REVIEW ANY CONDITIONS ON THE ISSUED PERMIT AND COORDINATE WITH THE ENGINEER REGARDING CONSTRUCTION AND INSPECTIONS OF THE SYSTEM. IF YOU HAVE ANY QUESTION OR NEED ANY ADDITIONAL INFORMATION AND TO SCHEDULE INSPECTIONS, PLEASE CALL PAUL RUTLEDGE OR CARTER PAGE, SOPRIS ENGINEERING, 970 704 0311. NATIVE, YARD OR LANDSCAPED SURFACE COMPACTED SUBGRADE SUITABLE BACKFILL OR CLASS 6 ROAD BASE 6" MIN. 4" MIN. 6" MIN. 4"4" EXCAVATED MATERIAL COMPACTED TO 90% STANDARD PROCTOR 01-08-25 01-08-25 01-08-25 Design Calculations OWTS The treatment capacity for the replacement system is designed for a minimum 5-bedroom residence adequate for the existing 4-bedroom single family home that will provide capacity for additional future usage as needed. It is assumed that in the future the residence could undergo a major remodel that may include the addition of another bedroom. From the Regulation 43 usage table : Minimum population based on 2 person per bedroom for the first 3 bedrooms = 6 persons and 1 person per bedroom for each additional 2 bedrooms = 2 persons for a total of 8 persons. Gallons per day per person =75 gal/person/day, No peaking factor Max. Design flow (Qd)gallons/day = (# of people) x (avg. flow)gal/person/day. Design flow Qd = 8*75=600 gpd Septic Tank Design: The septic tank capacity for a minimum 48 hour retention time is calculated as follows: V = 600 gal/day * 2 = 1,200 gallons. Use a 1,500 gallon, 2-compartment reinforced plastic septic tank with an inlet sanitary tee and effluent filter outlet sanitary tee in the second chamber in series with a 500 gallon, single-compartment dosing tank with a bio-tube duplex high head pump dosing assembly. The tank will be installed with a sealed 30" diameter PVC or plastic access risers and lid set at the finish grade surface. The existing 1,000 gallon septic tank will be pumped, breached with crushed lid and backfilled to abandon in place. Sub Surface Conditions and Testing A subsurface soil investigation and site assessment was performed by Sopris Engineering on January 5, 2026. The soils were sampled and characterized by application of the USDA visual/tactile soil texture method analysis. The soils below 12 inches of topsoil consist of medium dense silt loam soil with less than 1% scattered gravel or rock content to 7-8 feet below the surface grades. The soils appear to be consistent across the site from observations in the excavated profile pit and existing tank/effluent pipe exploratory excavation. Septic Tank Excavation Pits: The soils encountered in the existing tank excavation below approximately 12 inches of topsoil consist of slightly sandy silt loam to the excavation depths of about 7-feet below the surface grades. No limiting soil or hydrological conditions were encountered. The slightly dense silt loam texture soil has blocky to granular structure with moderate grade with no scattered gravel or rock content.. No change of texture was encountered at depth. No free water was encountered in the pit excavations. No evidence of seasonal high ground water or redox conditions was observed in the excavation. PROFILE PIT-PP-1 The soils below approximately 12 inches of topsoil consists of brown silt loam texture soil with blocky to granular structure of moderate structural grade to a depth of 5 feet containing no scattered gravel or rock content. The underlying soils to a depth of 8' consist of friable slightly sandy silt loam with slightly blocky to fine granular structure of moderate structural grade with no scattered gravel or rock content to the 8' depth explored. No free water or evidence of seasonal high groundwater was encountered in the pit excavation. The native soils sampled from 2'-4' below the surface are characterized as a type 2 with silt loam texture of moderate grade with blocky granular structure. The tactile soil test ribbons were ¾ to 1-inch long. The soil type-2 has an effective loading rate (LTAR)of 0.60 gal/s.f./day for a level 1 conventional treatment system. Based on the testing results, existing topography, vegetation, and observation of site features, the soils are generally consistent in the 2 soil profile pits. The soils are suitable for the installation of an STA consisting of multiple pressure dosed gravelless chamber beds. Additional observations will be performed by Sopris Engineering in the area of the proposed treatment/absorption field and tank during initial stages of construction prior to placement of the distribution materials. Sopris Engineering will verify the soil conditions, OWTS components and provide installation guidance to the contractor. All findings, conditions and installation documentation will be included in the As-Constructed plan and report. Soil Treatment Area/Absorption System Design The soil treatment area (STA) is designed based on utilizing the effective Long Term Acceptance Rate (LTAR) for the in-situ soils at the absorptive surface in a chamber bed system. The STA will utilize pressure dosed distribution laterals to equally pressure dose each chamber row in each chamber bed. Long Term Acceptance Rate (LTAR): Considering the application of the state regulation 43: Receiving Wastewater Treatment Level 1; Soil type 2 loading rate for a silt loam is (0.6 gal./S.F./day).; Loading factors; (Table 10-2, Gravity application trenches = 1.0 ) and (Table 10-3, gravelless chambers = 0.7) A(sf) = Qd x L.F.1 x L.F.2 .: A = Area; LTAR LTAR = 0.6 Gal/S.F./day for silt loam Qd = flow (gal/day) = 450 gpd L.F.1=1.0 Gravity Distribution L.F.2=0.7 Chambers A(sf) = 600 gpd x 1.0 x 0.7 = 700 S.F. 0.6 Gal/S.F./day Number of 5'x3' Bio-Diffuser chambers: 700 S.F = 47 chambers; Use 48 chambers 15 S.F./Chamber Construct two fully pressure dosed 40.5' by 9' chamber beds. Install 48 ARC-36 chambers in two beds with 3 rows of 8 chambers per row for a total absorption area of 729 S.F. The bottom of each bed to be excavated to an average depth of 30 inches below the existing surface grades. The absorptive surface to be scarified at level grade. Chambers to be covered with filter fabric and backfilled to a minimum 3" above existing perimeter grades. 1.5" SCHD-40 PVC TRANSPORT PIPE TO DISTRIBUTION MANIFOLD AT HP VERTICAL 1.5" TEE CONNECTION G:\2026\36000 315 Westbank\CIVIL\Civil DWGs\DE\36000-DE-OWTS Plan - TCP Rev. 2026-01-15.dwg, 1/15/2026 3:15:25 PM, DWG To PDF.pc3