HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-10-26-9639
BATTLEMENT GOLF CLUB OUTDOOR EVENT SHELTER
3930 NORTH BATTLEMENT PARKWAY
DETACHED ROOF STRUCTURE WITH NO WALLS
1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS://WWW.COLORADO.GOWPA IFIC/DORA/DPO ELECTRICAL PLUMBING PE
RMITS
4) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
5) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
6) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS
COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION,
4000PSF.
7) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED.
8) ENGINEER STAMPED TRUSS DRAWINGS ARE REQUIRED TO BE PROVIDED TO THE
INSPECTOR AT FRAMING INSPECTION.
9) THE CART PATH IS THE ACCESSIBLE ROUTE TO THE SHELTER, SIDEWALK FROM
THE SHELTER TO THE CART PATH IS REQUIRED PRIOR TO THE FINAL INSPECTION.
10)THE STRUCTURAL POSTS ARE TO BE 1" ABOVE THE SLAB.