Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-06-25-9328 VANTAGE AVIATION FUEL FARM GARFIELD COUNTY AIRPORT 375 COUNTY ROAD 352 1) AS A FUEL FARM IS NOT ATYPICAL PERMIT SUBMITTAL AND HAS LIFE SAFETY CONCERNS NOT ALWAYS ADDRESSED IN THE LOCAL ADOPTED CODES, THE ENGINEER OF RECORD IS TO APPROVE ALL THE LIFE SAFETY ASPECTS OF THE FUEL FARM. PLEASE PROVIDE A LETTER OF ACCEPTANCE PRIOR TO THE FINAL INSPECTION. 2) COMPLIANCE WITH IFC CHAPTER 20 AND NFPA 407 IS REQUIRED. 3) THE COUNTY BUILDING DEPARTMENT WILL BE CONDUCTING REBAR INSPECTIONS AND FINAL INSPECTIONS WHEN THE PROJECT IS COMPLETED. A SIGN -OFF FROM THE LOCAL FIRE DISTRICT IS REQUIRED PRIOR TO THE COUNTY'S FINAL INSPECTION. THIS MAY REQUIRE SPECIAL INSPECTIONS BASED ON THE FIRE PROTECTION ENGINEER'S REPORT, AS THERE ARE PARAMETERS FOR PIPE TESTING IN NFPA 407. 4) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 5) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 6) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WWW.COLORADO.GOWPACIFIC/DORA/DPO ELECTRICAL PLUMBING PE RMITS 7) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 8) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 9) THE ENGINEER OF RECORD IS TO VIEW THE INFRASTRUCTURE WORK AND PROVIDE A LETTER OF ACCEPTANCE TO THE COUNTY BUILDING DEPARTMENT. 10) GEOTECHNICAL OBSERVATION REPORT IS REQUIRED AT FOOTING INSPECTION INCLUDING STRUCTURAL FILL PLACEMENT AND COMPACTION, 2000 PSF. 11)ANY WATER SUPPLYTHAT FEEDS A FIRE SUPPRESSION SYSTEM OR FIRE HYDRANTS IS TO BE INSPECTED BY THE FIRE MARSHAL FOR THAT FIRE DISTRICT PRIOR TO BACKFILLING ALONG WITH THE WATER PROVIDER.