Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-12-25-9618 CITABEL GLENWOOD LLC SELF -STORAGE BUILDING B2 267 CENTER DRIVE COOPER SUBDIVISION, WEST GLENWOOD S1 Occupancy, Type IIB Construction 1) SEPARATE PERMITS ARE REQUIRED FOR TENANT FINISH CONSTRUCTION. 2) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 3) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 4) A LIST OF REQUIRE❑ INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WVM-COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING P ERMITS 5) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 6) ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 7) SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE SEE THE COUNTY'S WEBSITE FOR THE APPLICATION. 8) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869- 3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 9) THE ELECTRICAL CODE REQUIRES A SEPARATE ELECTRICAL PERMIT FOR LOW VOLTAGE FIRE ALARMS THAT HAS AN ALARM PANEL AND SEND A NOTIFICATION TO THE FIRE DISTRICT WHEN UNDER ALARM. A ROUGH -IN INSPECTION WITH THE STATE ELECTRICAL INSPECTOR IS REQUIRED (303) 869- 3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTION. 10) THE FIRE SPRINKLER AND ALARM ARE REQUIRED TO BE INSPECTED AND APPROVED BY THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP DRAWINGS TO THE FIRE DISTRICT FOR REVIEW AND SCHEDULE THE INSPECTIONS ACCORDINGLY. PLEASE HAVE THE FIRE MARSHAL SIGN THE INSPECTION CARD WHEN THE ROUGH INSPECTION IS APPROVED AND WHEN THE FINAL INSPECTION IS APPROVED. 11) ANY WATER SUPPLY THAT FEEDS A FIRE SUPPRESSION SYSTEM IS TO BE INSPECTED BY THE FIRE MARSHAL FOR THAT FIRE DISTRICT PRIOR TO BACKFILLING. 12) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 3000 PSF. 13) PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING DEPARTMENT AS SPECIFIED WITHIN THE GENERAL NOTES OF THE STRUCTURAL DRAWINGS. 14) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED. 15)ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE CONSTRUCTION WILL BE REQUIRED TO BE FIRE -STOPPED WITH LISTED FIRE STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE ASSEMBLIES AT THE FRAMING INSPECTION. (IBC 713) 16)A KNOX BOX IS REQUIRED TO BE MOUNTED ON THE BUILDING. PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION. 17) IF THE FIRE SPRINKLER SYSTEM REQUIRES A FIRE PUMP. THEN THE UTILITY ROOM THAT HOUSES THE PUMP WILL BE REQUIRED TO BE ONE -HOUR CONSTRUCTION. (IBC TABLE 508.2.5) 18) ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, INCLUDING POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6) 19)AN AIR LEAKAGE TEST IS REQUIRED PRIOR TO PERFORMING THE FINAL BUILDING INSPECTION. (IECC C402.5) 20) NATURAL GAS IS 2PS1 SYSTEM, REGULATORS ARE REQUIRED AT EACH APPLIANCE. 21) DOORS WITH DOUBLE KEYED DEAD BOLTS TO HAVE A SIGN POSTED: "THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED" 22) THE WATER HEATERS SHOWN MOUNTED ON THE WALL INSIDE THE STORAGE SPACE ARE TO BE 6' ABOVE THE FLOOR OR VEHICLE PROTECTION WILL BE REQUIRED.