HomeMy WebLinkAboutSubsoils Report Addendum 11.07.23November 7, 2023 Andover Management Group 333 East Main Street, Suite 300 Louisville, KY 40202 Attention: Dan Kunau Subject: Geotechnical Engineering Investigation - Addendum 214 Center Drive (a.k.a. Parcel 218506100042) Garfield County, Colorado CTLIT Project No. GS06693.001-125 CTLIThompson, Inc. (CTLIT) performed a geotechnical engineering investigation regard- ing 214 Center Drive (a.k.a. Parcel 218506100042) in Garfield County, Colorado. Subsequent to our report, we were asked to prepare this addendum. This letter provides geotechnical engi- neering recommendations and design criteria for earth retaining walls, seismic design, and belled pier foundations. Site Earth Retaining Wails We understand site earth retaining walls are included in the current plans for the project. Earth retaining walls must be designed to resist lateral earth pressures. Many factors affect the values of the design lateral earth pressure. These factors include, but are not limited to, the type, compaction, slope, and drainage of the backfill, and the rigidity of the wall against rotation and deflection. For a very rigid wall where negligible or very little deflection will occur, an "at -rest" lateral earth pressure should be used in design. For walls that can deflect or rotate 0.5 to 1 percent of wall height (depending upon the backfill types), design for a lower "active" lateral earth pressure may be appropriate. For backfill soils conforming with recommendations in the Foundation Wall backfill sec- tion of our report that are not saturated, we recommend design equivalent fluid densities of at least 45 pcf and 60 pcf for the "active" and "at -rest" conditions, respectively. Passive earth pres- sure calculated with an equivalent fluid pressure of 300 pcf is appropriate for this site, provided backfill in front of the retaining wall footings will not be removed during the lifespan of the struc- tures. Surface water from precipitation and landscape irrigation is likely to infiltrate backfill placed adjacent to site earth retaining walls. This water can cause reduced backfill strength and result in hydrostatic pressures on the retaining walls. Drains should be constructed behind the bases of the footings for the walls. CTLIThompson, Inc. Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County — Colorado Cheyenne, Wyoming and Bozeman, Montana The earth retaining wall drains can consist of 4-inch diameter, slotted, PVC pipe en- cased in free -draining gravel. A prefabricated drainage composite should be placed adjacent to the backs of the walls. Care should be taken during backfill operations to prevent damage to drainage composites. The drains should discharge via gravity outlets or weep holes. Seismic Design Parameters We expect the proposed buildings will be considered Risk Category 11, pursuant to the 2021 IBC. The soil and bedrock are not expected to respond unusually to seismic activity, and they have low susceptibility to liquefaction. Pursuant to the ASCE/SEI 7-22 and our subsurface information, we judge that Site Soil Class D is appropriate for seismic design. In our opinion, the developer should consider retaining a geophysical consultant to assist with evaluation of the seismic site soil classification of the site. We consider the seismic criteria on the table below to be appropriate for use in structural design at the site. Table 1 Seismic Criteria - SS i 0.32 S1 0.057 SDS 0.24 SDI 0.083 SMs 0.36 SM1 0.13 TL 4 PGAM 0.2 VS30 260 Seismic Design Category B Belled Piers We understand that the client anticipates that two of the one-story, metal buildings planned for the site will be subject to significant uplift forces. The client desires belled pier foun- dations for these buildings to resist the uplift. Our subsurface information indicates that the soils below the site are generally sandy clay soil that is medium stiff to very stiff with some very soft zones. Gravel and cobble soil is below the sandy clay, but the elevation is not consistent. The gravel/cobbles are deeper than 30 feet at some locations. Design and construction criteria for belled piers are below. Belled piers should be designed for a maximum allowable end bearing pressure of 3,000 psf. Skin friction should be neglected. ANDOVER MANAGEMENT GROUP Page 2 of 3 214 CENTER DRIVE CTLIT PROJECT NO. GS06693.001-125 2. Piers should be reinforced full-length. Reinforcement should extend into the grade, beams and foundation walls. Additional reinforcement may be required depending on structural analysis. 3. The belling tool should be used immediately upon completion of drilling the straight -shaft portion of the pier. The belling tool should be used to its full capaci- ty. Casing should be available on -site to prevent caving of soils into pier holes. 4. Piers should be carefully cleaned prior to placing concrete. Concrete should be on -site and placed in the pier holes immediately after the holes have been drilled, cleaned and observed. We recommend concrete with a minimum slump in the range of 5 to 7 inches to reduce possibility of voids in the belled portion of the pier. 5. Installation of drilled piers should be observed by a representative of CTLIT to verify subsoils are as anticipated and to observe the contractor's installation technique. We are available to discuss the contents of this letter. Please contact us if you have questions or need additional information. CTLITHOMPSON, INC. f Ryan R. Barbone, P`^ Division Manager ANDOVER MANAGEMENT GROUP 214 CENTER DRIVE CTLIT PROJECT NO. G506693.001-125 Reviewed by: �C/ mes D. Kellogg, P. a, Principal Engineer ikellooa@ctlthomi2son.com Page 3 of 3