Loading...
HomeMy WebLinkAbout2nd Revised OWTS Design403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. 12/1/25 BRACKET PARCEL: 216325100006 DEBUQUE, COLORADO SIZING CALCULATIONS: BUILDING CRITERIA: BEDROOMS: 3 PEOPLE : 6 GALLONS PER PERSON: 75 FLOW = 75 * 6 = 450 GPD REGULATION 43 DRAINAGE AREA SIZING: SOIL TYPE 2 LTAR = 0.60 PERCOLATION RATE 16-25 (450 GPD / 0.6) * 1.0 = 750 SF, USE 4 X (3 X 65) TRENCH LAYOUT = 780 SF TANK SIZING: REGULATION 43 REQUIRES 1,000 GALLON 2-COMPARTMENT TANK TEST PIT #1 TEST PIT #2 SOIL EVALUATION LOG DATE: 7/13/2025 EQUIPMENT USED: EXCAVATOR WEATHER: SUNNY TECHNICAN: GOODRICH ENGINEERING LAYER DESCRIPTION LAYER DESCRIPTION 0-1' ORGANICS PLOW LAYER BEDROCK: NOT FOUND GROUND WATER: NOT FOUND 1 2 3 4 5 6 7 8 FT 1 2 3 4 5 6 7 8 FT 1'-8' SANDY, SILTY, CLAY W/ ROCK FRAGMENTS TYPE 2 SOIL PIT DEPTH: 8FT 0-1' ORGANICS PLOW LAYER 1'-8' SANDY, SILTY, CLAY W/ ROCK FRAGMENTS TYPE 2 SOIL PIT DEPTH: 8FT Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. FEET 0 100 200 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com 10' PROPERTY LINE SETBACK TEST PIT #2 TEST PIT #1 374' 157' 428' 11' PROPOSED WATERLINE Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. FEET 0 30 60 12/3/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com 35' 10' 16' CLEANOUT Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. FEET 0 10 20 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com 1 C6 TANK DETAIL 4 C5 PIPELINE DETAIL 2' 8' 27' 4' 2' Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. FEET 0 10 20 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com A C5 1 C5 DIST. BOX DETAIL INSPECTION PORT3'4' 65' INSPECTION PORT END OF LATERALS MUST BE CAPPED Grade Field Surface to Surrounding Topography 4"Ø PERFORATED SDR35, PIPE 3 4" Washed Gravel or equiv. Filter Fabric Topsoil/Native Soil Natural Backfill Inspection Port. 4" PVC slotted (or equiv.) length installed in infiltration media. At end of all laterals. CL Lateral SECTION - A *LATERALS TO BE INSTALLED AT 0% SLOPE CL Lateral CL Lateral CL Lateral DETAIL 1 American Manufacturing DBOX 5 HDPE SDR35, 4" Ø pipe or equiv. High traffic areas use SCH40 -4 3 4" WASHED GRAVEL OR EQUIV Limiting Layer Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com UNDER ROADWAYS USE SCH40 PIPE 1 - DETAIL Scum Layer Liquid Layer Solids Layer Scum Layer Liquid Layer Solids Layer EFFLUENT FILTER Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com DIAL 4 GREEN 4"Nominal One-Piece Construction DIAL 4 GRAY 4" Nominal One-Piece Construction DIAL 4 BLACK For ADS Pipe 1.ECCENTRIC OPENING LOCATION 2.WEIR EXTENSION 3.FINGER GRIP VALLEY 4.FINGER GRIP EXTENSION 5.PIPE SEAL 6.3/4" MIN. SEAL DEPTH 7.I.D. PIPE AMERICAN DIAL-A-FLOW PATENT NO. 4,298,470 Flow Control: The Amercian Dial-A-Flow provides a circular weir. Each outlet of the distribution box will equally discharge wastewater upon rising water level in the box. When the opening becomes submerged, the dial-a-flow becomes an orifice and further enhances equal distribution. The discharge rate of each dial-a-flow is depicted in the graph. The head condition is noted in inches above the invert of the orifice and is based on open discharge. The graph was derived from testing in a laboratory environment. 4" Nominal Schedule 40 Sdr 35 Astm 3034 Astm 2729 S & D Corrugated Installation Instructions: 1.Cut pipe as evenly as possible and remove shavings. 2.Insert pipe into distribution box and extend pipe 1" into box. 3.Insert dial-a-flow into pipe ends with opening to one side. (Do not use glue) Note: Proper cutting of corrugated pipe will result in dial-a-flow snapping behind one corrugation. 4.Level pipe individually or place level on orifice lip. 5.Purge pipes in concrete boxes into place with suitable material. 6.Fill with water and "dial up" each pipe to water surface. SPECIFICATION: DIAL-A-FLOW Provide a non-corrosive flow control device to be rotateably secured in the discharge piping of the drainfield distribution box. The device shall have an eccentrically located circular opening with a diameter of 1-15/16". This will provide a uniform in any rotated position. The device shall have a leveling lip extending into the box 1/8". The sealing means shall be a cylindrical extension inside the pipe with radially extending seal to initiate contact with pipe at least 3/4" inside the pipe. The device shall be provided with a gripping edge on the periphery of the end faces for easy rotation. The gripping edge shall consist of six uniform extensions and valleys for easy finger gripping. The device shall be made of low density polythylene, and one piece construction. This seal shall also be capable of snapping behind a corrugation of standard 4" corrugated pipe. The flow control device shall be Dial-A-Flow as manufactured by: American Manufacturing Co., Inc., Manassas, Va. Part No.Size DIAL 4 GREEN 4" NOMINAL - 4" 1.D. & ABOVE DIAL 4 GRAY 4" NOMINAL - UNDER 4" I.D. DIAL 4 BLACK 4" NOMINAL - FOR ADS DOUBLE CALL Cross Section Of Distribution Box Riser to grade around Distribution Box Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. 12/1/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com Engineer's Certification I, Brian Keith Briggs, being a Registered Professional Engineer in the State of Colorado, do hereby certify that this drawing has been completed by me or under my direct supervision and that it is true and correct to the best of my knowledge and belief. 8/28/25 403 N. 1st Street Montrose, CO 81401 (775) 997-4281 jthiel@bkbassoc.com THE FOLLOWING GENERAL NOTES AND SPECIFICATIONS CONSTITUTE A MAJOR PORTION OF THE O.W.T.S. PLANS AND SPECIFICATIONS. STRICT COMPLIANCE WITH THESE NOTES IS ESSENTIAL TO THE CONSTRUCTION AND PERFORMANCE OF THIS O.W.T.S. SYSTEM. I.GENERAL CONDITIONS 1.THE CONTRACTOR/OWNER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS REQUIRED FOR THIS PROJECT FROM THE COUNTY, APPLICABLE UTILITY COMPANIES AND ANY OTHER APPLICABLE GOVERNING AGENCIES, PRIOR TO START OF CONSTRUCTION. 2.O.W.T.S. SYSTEM HAS BEEN DESIGNED IN ACCORDANCE WITH CURRENT ADOPTED COUNTY ONSITE WASTEWATER SYSTEM REGULATIONS. 3.CONTRACTOR SHALL HAVE ONE SET OF SIGNED PLANS APPROVED BY THE COUNTY ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION AND INSPECTION. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES, INCLUDING ANY UTILITIES NOT SHOWN ON THE DRAWINGS. WHEN WORKING NEAR EXISTING UTILITIES, THE CONTRACTOR SHALL EXERCISE SUFFICIENT CARE TO PREVENT DAMAGE TO THE UTILITY IN THE EVENT THAT THE INFORMATION SHOWN ON THE DRAWINGS DOES NOT REFLECT ACTUAL FIELD CONDITIONS. 5.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LINES, ELEVATIONS, SETBACKS, MATERIALS, ETC PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES FOUND. 6.THE CONTRACTOR SHALL HAVE PRIOR EXPERIENCE IN THE CONSTRUCTION OF O.W.T.S. OF THE NATURE SHOWN IN THIS PLAN SET. 7.CONTRACTOR(S) TO EMPLOY SKILLED LABOR AND BEST CONSTRUCTION PRACTICES OF THE TRADES INVOLVED IN CONSTRUCTING THIS O.W.T.S.. 8.LOCAL PLUMBING AND ELECTRICAL CODES AND THE LATEST REVISION OF THE COUNTY GUIDELINES FOR ONSITE WASTEWATER SYSTEMS SHALL BE MET BY THE CONTRACTOR. 9.ALL DETAILS DESIGNATED AS "TYPICAL DETAILS" APPLY GENERALLY TO THE DRAWINGS IN ALL AREAS WHERE CONDITIONS ARE SIMILAR TO THOSE SHOWN IN THESE DETAILS. 10.ENGINEER'S APPROVAL MUST BE SECURED FOR ALL CHANGES TO THESE PLANS. ANY UNAUTHORIZED MODIFICATIONS ARE SOLELY AT THE RISK OF THE PERSON MAKING THE CHANGE. 11.IMMEDIATELY NOTIFY THE ENGINEER IF, DURING CONSTRUCTION, A CONDITION THAT IS NOT COVERED BY THESE DRAWINGS IS DISCOVERED. 12.UNLESS THESE PLANS SHOW FINISHED CONTOURS AND SPOT ELEVATIONS THEY ARE PRESENTED IN SCHEMATIC FORM ONLY. FIELD ADJUSTMENTS MAY BE NECESSARY TO ACHIEVE THE DESIGN INTENT. 13.SHOULD SOIL CONDITIONS VARY FROM THOSE SHOWN ON THE TEST PIT PROFILE LOG DURING EXCAVATION OF THE DISPOSAL AREA STOP WORK AND NOTIFY THE ENGINEER. 14.ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO COUNTY REGULATIONS. 15.UNLESS OTHERWISE DIRECTED THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING SIGNS, STRUCTURES, FENCES ETC. ENCOUNTERED ON THE JOB AND RESTORING THEM TO ORIGINAL CONDITION. 16.TO ADEQUATELY ASSESS THIS PROJECTS NEEDS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO UNDERTAKE A THOROUGH SITE INSPECTION (ADDITIONAL EXCAVATIONS, LABORATORY TESTS, ETC.) SHOULD SUCH ACTION BE DEEMED APPROPRIATE. II. SITE PREPARATION 1.TO STRIP ALL VEGETATION FROM DISPOSAL AREA TO A DEPTH OF THREE (3) TO SIX (6) INCHES. REMOVE ALL TREE AND BRUSH ROOTS GREATER THAN 3/4 INCH IN DIAMETER TO A DEPTH OF 3 FEET BELOW BOTTOM OF DISPOSAL AREA. 2.ADEQUATE SURVEYING METHODS SHALL BE USED TO LAYOUT THE ENTIRE O.W.T.S., CHECKING FOR SETBACK COMPLIANCE, ELEVATION AND HORIZONTAL CONFLICTS, AS WELL AS UTILITIES. 3.PROTECT SURROUNDING STRUCTURES, VEGETATION, AND UTILITIES AS NECESSARY TO ELIMINATE DAMAGE FROM CONSTRUCTION ACTIVITIES. III. SITE EXCAVATION 1.THE SIDES OF ALL SOIL EXCAVATIONS DEEPER THAN 4 FEET SHALL BE LAID BACK TO A SLOPE OF 2.0 HORIZONTAL TO 1.0 VERTICAL UNLESS: 1.1.A STEEPER SLOPE IS PERMITTED BY THE ENGINEER FOR THE PARTICULAR LOCATION BASED ON THE SOIL PROPERTIES IN QUESTION. 1.2.A PRE-ENGINEERED SOIL RETENTION SYSTEM IS SUPPLIED BY CONTRACTOR. 2.CONTRACTOR SHALL COMPLY WITH ALL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS FOR TRENCH SAFETY. 3.DISPOSAL BED EXCAVATION IN FINE GRAINED SOILS WILL REQUIRE THAT NO EQUIPMENT OR FOOT TRAFFIC SHALL TRAVEL OVER THE BOTTOM OF THE DISPOSAL AREA FOLLOWING ITS EXCAVATION. 4.SIDEWALLS AND BOTTOM OF THE DISPOSAL AREA SHALL BE SCARIFIED TO A DEPTH OF THREE (3) INCHES, SUCH THAT NO SMEARED, COMPACTED, OR SEALED SOIL REMAINS. 5.NO DISPOSAL AREA EXCAVATION IS PERMITTED WHEN THE SOILS ARE MOIST OR WET. 6.IF GROUNDWATER IS ENCOUNTERED NOTIFY THE ENGINEER IMMEDIATELY. 7.THE BOTTOM OF ALL EXCAVATIONS (DISPOSAL AREA, SEPTIC TANK, PUMP VAULT) SHALL BE LEVEL, WITH NO DEPRESSIONS GREATER THAN 0.1 FEET IN DEPTH. LOOSEN SOIL AND RAKE SMOOTH. 8.IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A DRY EXCAVATION. DEWATERING, AND DRYING TIME, IF NECESSARY, SHALL BE INCLUDED IN THE PROJECT COST. IV. FILL PLACEMENT 1.FILL SHALL BE PLACED AS NOTED BASED FOR FILL SOIL TYPE AS FOLLOWS: 1.1.CLAY EMBANKMENTS - PLACE FILL TO DEPTH SHOWN ON PLANS PLUS 10 PERCENT TO ALLOW FOR COMPACTION. COMPACT IN 6" LIFTS USING EXCAVATOR BUCKET AND LIGHTLY TAMPING SURFACE OF CLAY FILL. 1.2.SAND FILL - PLACE FILL TO DEPTH SHOWN ON PLANS. WATER SETTLE BY FLOODING ENTIRE LAYER TO A STANDING DEPTH OF 3 INCHES. ALLOW TO COMPLETELY DRAIN AND ADJUST FILL TO DESIGN DEPTH. REPEAT AS NECESSARY. 1.3.GRAVEL FILL - PLACE FILL TO DEPTH SHOWN ON PLANS. COMPACT BY LIGHTLY TAMPING WITH EXCAVATOR BUCKET. ADJUST TO FINAL GRADE AFTER TAMPING EFFORT IS COMPLETE. GRAVEL SHALL BE PUSHED ONTO EXCAVATED NATIVE SOILS. NO DUMPING IS PERMITTED 1.4.TOPSOIL COVER TO BE PLACED LOOSELY TO A DEPTH OF 2" GREATER THAN DESIGN DEPTH. 2.ALL FILL SHALL BE PROVIDED FROM AN ENGINEER APPROVED SOURCE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER CURRENT GRADATION FOR SAND AND GRAVELS PRIOR TO DELIVERY TO THE JOBSITE. V.FINISH GRADING 1.ALL FINISHED GRADING SHALL BE SUCH THAT NO DEPRESSIONS OF MORE THAN 0.2 FEET REMAIN, UNLESS OTHERWISE DIRECTED BY THE PROJECT ENGINEER. ALL SLOPES SHALL DRAIN TO EITHER A DEDICATED DRAINAGE CONTROL STRUCTURE OR SHEET FLOW TO UNDISTURBED VEGETATED AREA, COMPLETELY AWAY FROM DISPOSAL SITE. 2.FINISH GRADING SHALL BE UNDERTAKEN ON ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES, AND AS NOTED ON THESE PLANS. 3.PROVIDE DIVERSION SWALE(S) AS SHOWN ON THESE PLANS. SWALES TO EXTEND BEYOND DOWNHILL LIMIT OF DISPOSAL AREA AND DRAIN TO DAYLIGHT. USE A TWO (2) PERCENT MINIMUM GRADE UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 4.PROTECTION: BED AREA SHALL BE PROTECTED TO PREVENT DAMAGE FROM VEHICULAR OR PEDESTRIAN TRAVEL. VI. REVEGETATION 1.ALL AREAS DISTURBED BY O.W.T.S. CONSTRUCTION SHALL BE REVEGETATED EITHER: 1.1.AS SHOWN ON THE LANDSCAPE ARCHITECTS PLANS, OR 1.2.BY PLACING SOD OR SEED MIX AS DIRECTED BY THE OWNER. 2.FOR MOUND O.W.T.S. 70 PERCENT OF THE MOUND MUST HAVE ESTABLISHED GROWTH, PRIOR TO ENGINEER CERTIFYING PROJECT COMPLETION TO THE COUNTY HEALTH DEPARTMENT. 3.ALL AREAS TO RECEIVE REVEGETATION SHALL HAVE 4 INCHES OF TOPSOIL (CLAYEY SANDS, SAND-CLAY MIXTURES OR SILTY SANDS, SAND-SILT MIXTURES) COVER. VII. PIPING & TRENCHES 1.PIPING SHALL BE OF SIZE, TYPE, AND SCHEDULE SHOWN ON THESE PLANS. 2.ALL JOINTS UNLESS NOTED OTHERWISE SHALL BE SOLVENT WELDED. ALL CONNECTIONS SHALL BE CUT PERPENDICULAR TO FLOW LINE, FLASH TRIMMED, PRIMED, AND SOLVENT WELDED. 3.PIPE SLOPE SHALL BE AS SHOWN ON THE PLANS, BUT IN NO CASE LESS THAN 1 PERCENT FOR GRAVITY BASED O.W.T.S. 4.PIPING SHALL BE BEDDED IN NATIVE MATERIAL, EXCEPT FRACTURED ROCK, COBBLES AND BOULDERS. IN WHICH CASE BEDDING SHALL BE OF MATERIAL APPROVED BY THE ENGINEER. 5.ALL PIPE TRENCHES SHALL BE COMPACTED TO 85 PERCENT STANDARD PROCTOR (ASTM T-99) IN NON-TRAFFIC AREAS. AREAS SUBJECT TO VEHICLE TRAFFIC SHALL BE COMPACTED TO 95 PERCENT STANDARD PROCTOR. HAND TAMP AROUND PIPE HAUNCHES. 6.TRENCHES SHALL HAVE SMOOTH BOTTOMS AND SIDEWALLS WITH NO PROTRUDING OR SHARP OBJECTS. PROVIDE BELL HOLES WHERE REQUIRED TO FACILITATE INSTALLATION. 7.PIPE BURIAL SHALL BE TO THE DEPTH SHOWN ON THESE PLANS; BUT NO LESS THAN 24 INCHES. 8.PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHALL BE FIELD VERIFIED. VIII.SEPTIC TANKS & VAULTS 1.ALL BELOW GROUND TANKS AND VAULTS SHALL BE CONSTRUCTED OF REINFORCED CONCRETE UNLESS SHOWN OTHERWISE ON THIS DRAWING SET AND BE RATED TO HANDLE 400 PSF FOR NON-TRAFFIC AREAS OR H-20-44 RATED FOR AREAS TO RECEIVE VEHICLE TRAFFIC. SEE CONCRETE SECTION FOR STRENGTH AND REINFORCING REQUIREMENTS. 2.SEPTIC TANKS SHALL BE CONFIGURED AS SHOWN ON THESE PLANS, WITH SUBSTITUTIONS CONSIDERED BASED ON LOCAL AVAILABILITY. 3.ALL TANKS AND VAULTS SHALL BE WATERTIGHT AND HAVE ONE 20 INCH DIAMETER ACCESS PORT WITH LID OVER EACH COMPARTMENT. 4.WATERTIGHT MANHOLES AND LIDS SHALL BE PROVIDED FOR ALL PUMPING VAULTS AND FOR SEPTIC TANKS WHEN BURIAL DEPTH EXCEEDS 8 INCHES. 5.FOR TANKS AT SITES WITH FINE GRAINED, CLAYEY SANDS, SAND-CLAY MIXTURES OR SILTY SANDS, SAND-SILT MIXTURES SOILS. AN EFFLUENT FILTER IS REQUIRED IN THESE SOILS & AS SHOWN ON THESE PLANS. 6.TANKS SHALL BE NON-BUOYANT WHEN EMPTY. 7.ALL TANKS WILL UNDERGO A FIELD TEST FOR WATERTIGHTNESS. THIS TEST WILL CONSIST OF FILLING EACH TANK TO ITS RIM OR TOP OF MANHOLE WITH WATER. LET IT STAND OVERNIGHT AND REFILL TANK TO THE SAME LEVEL. THE FOLLOWING DAY THE WATER LEVEL WILL BE CHECKED TO DETERMINE TIGHTNESS. THIS TEST SHALL BE PERFORMED PRIOR TO PLACING BACK FILL AROUND EACH TANK. TANK(S) FAILING THIS TEST WILL BE REJECTED BY THE ENGINEER AT NO ADDITIONAL EXPENSE TO THE OWNER OR ENGINEER. THE DEFECTIVE TANK(S) SHALL BE REMOVED FROM THE OWNER'S PROPERTY. 8.INSTALL EFFLUENT FILTER AND HIGH-WATER ALARMS WHEN SHOWN ON THESE PLANS, IN ACCORDANCE WITH MFRS. RECOMMENDATIONS EXCEPT WHEN NOTED OTHERWISE. 9.ALL TANK PENETRATION SEALS SHALL BE WATER TIGHT. 10.THESE REQUIREMENTS ARE SUPERSEDED BY LOCAL O.W.T.S. GUIDELINES WHERE APPLICABLE. 11.TANK(S) WITH CONCRETE OUTLET BAFFLES ARE NOT PERMITTED. IX. CONCRETE 1.ALL CONCRETE SHALL CONFORM TO THE SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS, ACI 301. 2. ALL CONCRETE SHALL DEVELOP 4000 PSI COMPRESSIVE 28-DAY STRENGTH. 3.ALL REINFORCING STEEL SHALL BE HIGH STRENGTH DEFORMED BARS, GRADE 60, ASTM 1615-89 WITH 60,000 PSI MINIMUM YIELD STRENGTH; EXCEPT NO. 3 COLUMN TIES, BEAM STIRRUPS, FIELD-BENT AND FIELD WELDED BARS WHICH SHALL BE GRADE 40. 4.DETAIL BARS IN ACCORDANCE WITH ACI DETAILING MANUAL AND ACI BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. PROVIDE CORNER BARS. X.PUMPING SYSTEMS 1.WHEN SHOWN ON THESE PLANS A PUMPED DOSING SYSTEM IS REQUIRED. AS A MINIMUM THIS SYSTEM WILL INCLUDE A BELOW GRADE PUMP VAULT WITH ACCESS WAY, EFFLUENT PUMP, CONTROL PANEL, 3 FLOAT CONTROLS, ALARM, VENT, CONTROL WIRING, PULL CABLE, AND PIPING. OTHER ELEMENTS INCLUDE CONDUIT POWER SUPPLY, AND CONNECTION TO PRIMARY BREAKER PANEL. 2.PRIOR TO ACCEPTANCE, THE PUMPING SYSTEM MUST BE TESTED AND SHOWN TO BE FULLY OPERATIONAL. (SEE INSPECTION REQUIREMENTS). XI. INSPECTIONS & CLOSE-OUT 1.AT A MINIMUM ONE INSPECTION WILL BE REQUIRED PRIOR TO BURIAL OF THE SEPTIC TANK AND DISPOSAL SYSTEM. FOR O.W.T.S. WITH DIFFICULT SOILS, PUMPING SYSTEMS, PHASED CONSTRUCTION SEE THIS SHEET FOR PROJECT SPECIFIC INSPECTION REQUIREMENTS. 2.PRIOR TO FINAL ACCEPTANCE THE CONTRACTOR SHALL PROVIDE "AS-CONSTRUCTED" SKETCH OF THE INSTALLED O.W.T.S., FOR FUTURE LOCATION PURPOSES. THIS SKETCH SHALL TIE EACH INSTALLED COMPONENT TO THE PRIMARY STRUCTURE ON THE SITE (i.e. SEPTIC TANK, DISPOSAL SITE, PUMP, TANK....). EACH LOCATED COMPONENT SHALL BE TIED TO TWO CORNERS ON THE PRIMARY STRUCTURE. THE SKETCH SHALL BE LEGIBLY DRAWN ON EITHER THE FIELD PLAN OR SEPARATE SHEET AND SUBMITTED TO THE ENGINEER AT THE FINAL INSPECTION. 3.CALL FOR INSPECTIONS AT LEAST 2 WORKING DAYS PRIOR TO DAY OF EACH NEEDED INSPECTION. 4.THE CONTRACTOR SHALL COMPILE ALL PRODUCT LITERATURE, SHIPPED WITH THE O.W.T.S. COMPONENTS AND PLACE IN A THREE RING PLASTIC COVER BINDER. THIS INCLUDES WARRANTY, OPERATION MAINTENANCE INFORMATION. THIS INFORMATION SHALL BE PROVIDED TO THE OWNER PRIOR TO CERTIFICATION TO THE COUNTY. XII. APPLICABLE CODES & STANDARDS 1.AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM) 2.UNIFORM PLUMBING CODE (OUTDOOR APPENDIX) - CURRENT EDITION (UPC) 3.UNIFORM BUILDING CODE-CURRENT EDITION (UBC) 4.NATIONAL ELECTRIC CODE-CURRENT EDITION (NEC) 5.O.W.T.S. GUIDELINES FOR THE COUNTY-CURRENT EDITION 6.THE COUNTY LAND USE CODE-CURRENT EDITION 7.AMERICAN CONCRETE INSTITUTE - CURRENT EDITION (ACI) 8.CONCRETE REINFORCING STEEL INSTITUTE - CURRENT EDITION (CRSI) 9.STATE OF COLORADO O.W.T.S. GUIDELINES-CURRENT EDITION 10.O.S.H.A. TRENCH SAFETY STANDARDS - CURRENT EDITION