Garfield County
Community Development Department
01 /16/2026
Owner:
MMME WG LLC
6874 Highway 82
Glenwood Springs Co 81601
Guy Duplantier
Architect:
None
Contractor:
Gould Construction
PO Box 130
Glenwood Springs, CO 81602
Re: Corrections and Conditions of Approval
,lob Address: 49893 Highway 6 &24
Dear Mr. Duplantier,
The County Building Department has performed the review on the building permit application
and plans for the new buildings proposed at the above address.
There are items that need to be addressed prior to considering issuance of the building permit
and items that can be addressed after the issuance of the building permit.
Please provide a response letter addressing each item listed in the "Items to address prior to
issuing a building permit". Response not required for the "Conditions to be addressed during
construction" but please address if clarification is needed.
Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for
the resubmittal.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
Corrections to address prior to issuing a building permit:
1 Cover — The Code Summary is indicating the Snow Load as 40psf Ground Snow Load, the
County's amendment is to accommodate 40psf Roof Snow Load. Please see the attached
design criteria. Please change the drawings accordingly.
2 Cover — The Wind Speed is indicated as 105 mph; the county minimum is 115 mph. Please
change the drawings accordingly.
3 B1.0 — The foundation is proposed without the required 36" of frost depth the County has
adopted. Please change the drawings to accommodate the required frost depth. There is an
allowance to utilize ASCE 32, which will require quite a bit of insulation to protect unheated
buildings from frost heave. (2015 IBC 1809.5)
4 The IBC required 5% of the Self -Storage units to be accessible, 4 units in this phase. Please
explain or show how that will be accommodated. (2015 IBC 1108.3)
5 A3.0 and 11.0 —The plans indicate an office enclosed by insulated walls. There is not
enough detail to verify compliance with the 2018 International Energy Conservation Code.
Please see the attached Insulation Table and indicate the following on the plans:
• The type of insulation in the wall and R-Values
• The type of insulation for the roof and R-Values
• The U-Value for the door and window associated with the Office.
• Provide details for the Slab Insulation with the type of insulation and R-Values. Also
known as "Slab Edge Insulation" the IBC Commentary is included that explains the
code and gives examples.
If the Prescriptive Method of insulation cannot be achieved, then a ComCheck Report will be
necessary to obtain compliance.
6 Please show on the plans the method of heating the office, please include the make a model
of the heating appliance. (2015 IMC 303 and IECC C403)
7 Please explain or show how plumbing fixtures will be compliant. Please bear in mind that the
restroom facilities are to be within 500'. (2015 IBC 2902 and 2902.3.2)
8 There is a letter in the submittal documents indicating that the City of Glenwood Springs will
be providing water to the site. Please provide a "Will Serve Letter" from the City of Glenwood
Springs. The city contact in the past has been Emery Ellingson in the Planning Department.
(LUDC 7-104)
9 Please provide the CDOT Special Use/Utility Permit for the new water line in the right-of-
way.
10 Please provide fence and gate details. (#6 of Resolution 2023-02)
11 Please provide a Geotech/Soils Report. (#7 of Resolution 2023-02)
12 Please submit the Landscape Plan. (#11 of Resolution 2023-02)
13 Please supply the Engineering Certification required in the Land Use Change Permit. (#14
of Resolution 2023-02)
14 Please have the engineer provide a statement of special inspection. (2015 IBC Chapter 7,
1704.2.3, 170511.2, 1705.12.3, and Table 1705.3)
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970) 945-8212
15 Typically the code requires a Hazardous Materials Report be submitted. Compliance with
this report is difficult as the storage for each tenant varies. A lease agreement has been
submitted in past applications that limits/disallows hazardous material storage. Please
submit a proposed lease agreement for verification. (2015 IBC 414)
Conditions to be addressed during construction:
The plans have been designed to the 2021 International Building Codes. The adopted codes
in Garfield County are the 2015 International Codes except for the 2018 International
Energy Conservation Code. The code analysis is to complies with the 2015 IBC. There
could be conflicts in the different versions of the codes, I am not comparing codes during the
review.
The approved plans are to be on -site for inspections.
Sanitary facilities are required to be provided for workers.
A list of required inspections will be attached to the plans. The State is to permit and
approve the electrical work.
https://www.colorado.gov/pacific/dora/DPO Electrical Plumbing Permits
Underground utility locates is the responsibility of the owner or contractor. 811 is the
Colorado Utility Locate Hot Line.
Separate Sign Permits are required for any external signs. Please see the County website
for the application.
Electrical Code compliance will be determined based on field inspections performed by the
State Electrical Inspector, (303) 869-3458. Please have the inspector sign the building card
or provide written documentation of the inspections.
Any water supply that feeds a fire suppression systems or fire hydrants are to be inspected
by the Fire Marshal prior to backfilling.
Please provide special inspections reports to the Building Department as specified within the
General Notes of the structural drawings.
Geotechnical observation is required when the excavation is complete and written
verification be supplied at footing inspection, 1500psf.
Combustible material is limited in Type I and Type II Construction. See IBC 603 for allowed
combustible materials.
All exterior lighting is to be downcast and shielded.
Safety glazing is not designated on the plans. Safety glazing will be checked during the
framing and final inspection. (IBC 2406.4)
A Knox Box is required to be mounted adjacent to the gate. Please contact the Local Fire
District for exact location.
All accessible door hardware shall have a shape that is easy to grip, including pocket and
sliding doors. (ANSI A117.1 — 404.2.6)
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
A passing blower door test for the office is required to be submitted prior to issuing the
Certificate of Occupancy.
The required landscaping and irrigation along the east side of the property is to be in place
prior to the Final Building Inspection.
A separate Building Permit is required for the Future Employee Housing shown on the Civil
Drawings.
All infrastructure piping and stormwater drainage is to be inspected by the engineer of
record. A stamped letter from the engineer accepting all infrastructure installation is required
prior to the final inspection.
Sincerely,
John Plano
Building Official
CC via email:
Mark Gould Jr., Owner/Contractor
Robin Pitt, Glenwood Fire Department
Glenn Hartmann, Garfield County Community Development
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
Garfield County
Community Development Department
01 /16/2026
Owner:
MMME WG LLC
6874 Highway 82
Glenwood Springs Cc 81601
Guy Duplantier
Architect:
None
Contractor
Gould Construction
PO Box 130
Glenwood Springs, CO 81602
Re: Corrections and Conditions of Approval
.lob Address: 49893 Highway 6 &24
Dear Mr. Duplantier,
The County Building Department has performed the review on the building permit application
and plans for the new buildings proposed at the above address.
There are items that need to be addressed prior to considering issuance of the building permit
and items that can be addressed after the issuance of the building permit.
Please provide a response letter addressing each item listed in the "Items to address prior to
issuing a building permit". Response not required for the "Conditions to be addressed during
construction" but please address if clarification is needed.
Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for
the resubmittal.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970) 945-8212
Corrections to address prior to issuing a building_ permit:
1 Cover — The Code Summary is indicating the Snow Load as 40psf Ground Snow Load, the
County's amendment is to accommodate 40psf Roof Snow Load. Please see the attached
design criteria. Please change the drawings accordingly.
2 Cover — The Wind Speed is indicated as 105 mph; the county minimum is 115 mph. Please
change the drawings accordingly.
3 131.0 — The foundation is proposed without the required 36" of frost depth the County has
adopted. Please change the drawings to accommodate the required frost depth. There is an
allowance to utilize ASCE 32, which will require quite a bit of insulation to protect unheated
buildings from frost heave. (2015 IBC 1809.5) signed acknowledgement attached
4 The IBC required 5% of the Self -Storage units to be accessible, 4 units in this phase. Please
explain or show how that will be accommodated. (2015 IBC 1108.3) ADA procedures by
self storge operator attached
5 A3.0 and 11.0 — The plans indicate an office enclosed by insulated walls. There is not
enough detail to verify compliance with the 2018 International Energy Conservation Code.
Please see the attached Insulation Table and indicate the following on the plans:
The type of insulation in the wall and R-Values
The type of insulation for the roof and R-Values
® The U-Value for the door and window associated with the Office.
Provide details for the Slab Insulation with the type of insulation and R-Values. Also
known as "Slab Edge Insulation" the IBC Commentary is included that explains the
code and gives examples:
If the Prescriptive Method of insulation cannot be achieved, then a ComCheck Report will be
necessary to obtain compliance. office has been eliminated
6 Please show on the plans the method of heating the office, please include the make a model
of the heating appliance. (2015 IMC 303 and IECC C403) office has been eliminated
7 Please explain or show how plumbing fixtures will be compliant. Please bear in mind that the
restroom facilities are to be within 500'. (2015 IBC 2902 and 2902.3.2) office has been
eliminated
8 There is a letter in the submittal documents indicating that the City of Glenwood Springs will
be providing water to the site. Please provide a "Will Serve Letter" from the City of Glenwood
Springs. The city contact in the past has been Emery Ellingson in the Planning Department.
(LUDC 7-104) Attached
9 Please provide the CDOT Special Use/Utility Permit for the new water line in the right-of-
way. Correspondence attached, utility permit should not be required for a building permit
especially given that this is under three jurisdictions
10 Please provide fence and gate details. (#6 of Resolution 2023-02) attached
11 Please provide a Geotech/Soils Report. (#7 of Resolution 2023-02) attached
12 Please submit the Landscape Plan. (#11 of Resolution 2023-02) attached
13 Please supply the Engineering Certification required in the Land Use Change Permit. (#14
of Resolution 2023-02) Site work is not 100% complete, we do not want to bother the county
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
with an additional grading permit, we are asking to complete the site work under the building
permit. Engineering Certification will be provided upon completion of site work prior to CO
14 Please have the engineer provide a statement of special inspection. (2015 IBC Chapter 7,
1704.2.3, 170511.2, 1705.12.3, and Table 1705.3)
15 Typically the code requires a Hazardous Materials Report be submitted. Compliance with
this report is difficult as the storage for each tenant varies. A lease agreement has been
submitted in past applications that limits/disallows hazardous material storage. Please
submit a proposed lease agreement for verification. (2015 IBC 414) attached
Conditions to be addressed during construction:
The plans have been designed to the 2021 International Building Codes. The adopted codes
in Garfield County are the 2015 International Codes except for the 2018 International
Energy Conservation Code. The code analysis is to complies with the 2015 IBC. There
could be conflicts in the different versions of the codes, I am not comparing codes during the
review.
The approved plans are to be on -site for inspections.
Sanitary facilities are required to be provided for workers.
A list of required inspections will be attached to the plans. The State is to permit and
approve the electrical work.
httr)s://www.colorado_gov/pacific/dora/DPO Electrical Plumbing Permits
Underground utility locates is the responsibility of the owner or contractor. 811 is the
Colorado Utility Locate Hot Line.
Separate Sign Permits are required for any external signs. Please see the County website
for the application.
Electrical Code compliance will be determined based on field inspections performed by the
State Electrical Inspector, (303) 869-3458. Please have the inspector sign the building card
or provide written documentation of the inspections.
Any water supply that feeds a fire suppression systems or fire hydrants are to be inspected
by the Fire Marshal prior to backfilling.
Please provide special inspections reports to the Building Department as specified within the
General Notes of the structural drawings.
Geotechnical observation is required when the excavation is complete and written
verification be supplied at footing inspection, 1500psf.
Combustible material is limited in Type I and Type II Construction. See IBC 603 for allowed
combustible materials.
All exterior lighting is to be downcast and shielded.
Safety glazing is not designated on the plans. Safety glazing will be checked during the
framing and final inspection. (IBC 2406.4)
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970) 945-8212
A Knox Box is required to be mounted adjacent to the gate. Please contact the Local Fire
District for exact location. understood
All accessible door hardware shall have a shape that is easy to grip, including pocket and
sliding doors. (ANSI All 17.1 — 404.2.6) understood
A passing blower door test for the office is required to be submitted prior to issuing the
Certificate of Occupancy. Office has been eliminated
The required landscaping and irrigation along the east side of the property is to be in place
prior to the Final Building Inspection. understood
A separate Building Permit is required for the Future Employee Housing shown on the Civil
Drawings. understood
All infrastructure piping and stormwater drainage is to be inspected by the engineer of
record. A stamped letter from the engineer accepting all infrastructure installation is required
prior to the final inspection. understood
Sincerely,
John Plano
Building Official
CC via email:
Mark Gould Jr., Owner/Contractor
Robin Pitt, Glenwood Fire Department
Glenn Hartmann, Garfield County Community Development
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970) 945-8212
TBS TRACHTE
6Z Building Systems
O
February 19, 2026
Mark Gould
PO Box 130
Glenwood Springs, CO
RE: Storage buildings for Glenwood Springs, CO (Trachte Plan #62146)
Dear Mr. Gould:
This letter is in response to comments made by Garfield County relating to the self -storage
permit for Hwy 6 & 24, Glenwood Springs, CO. We have listed each comment as an "ITEM"
followed with our "RESPONSE" that pertains to our scope of work.
ITEM 1: Cover Sheet
RESPONSE: The building calculations have been revised to IBC 2015 with 40psf Roof snow load.
All pertaining documents have been updated accordingly.
ITEM 2: Cover Sheet
RESPONSE: The wind speed has been updated from 105mph to 115mph. Please refer to the
revised building calculations and code summary.
ITEM 3: Foundation Plan
RESPONSE: We have enclosed a foundation letter.
ITEM 4: Table 1108.3 Accessible Self -Service Storage Facilities
RESPONSE: There is a total of 614 units on the proposed buildings and the calculation for
accessible units is 10 + 2% of units over 200, Table 1108.3 of IBC 2015. The number required
would be 10 + 0.02*(614-200) =18.28 units or 19 units. We have added 19 units of accessible units
to the floor plans.
ITEM 5: Roof and Wall Insulation Information
RESPONSE: The office from Building A3 has been removed so this provision of -the code is not
applicable.
ITEM 11: Geotech/Soil Report
RESPONSE: This is outside the scope of Trachte Buildings Systems and will be addressed by
others. However, Trachte must be informed if the soil report indicates an allowable pressure to be
less than the 1500psf that is currently used in design.
ITEM 14: Statement of Special Inspection
RESPONSE: We have enclosed the statement of inspection form.
314 Wilburn Road • Sun Prairie, WI 53590
P: 800.356.5824 • F: 800.981.9014 • E: tbs@trachte.com • W: trachte.com
TRS TRACHTE
6010 Building Systems
If you have any questions or need additional information, please contact Jeff Bouchard, or
myself at (800) 356-5824.
Sincerely,
Joel G. oward
Professional Engineer
JGH:CZR
enclosures
OAEG/
9/2026
314 Wilburn Road • Sun Prairie, WI 53590
P: 800.356.5824 • F: 800.981.9014 • E: tbs@trachte.com • W: trachte.com
-?L,p5Rsh,sit -M Z►afl Lu7vq,
Garfield County
Community Development Department
02/25/2026
Owner:
MMME WG LLC
6874 Highway 82
Glenwood Springs Co 81601
Guy Duplantier
Architect:
None
Contractor:
Gould Construction
PO Box 130
Glenwood Springs, CO 81602
Re: Corrections and Conditions of Approval
.lob Address: 49893 Highway 6 &24
Dear Mr. Duplantier,
The County Building Department has performed a review on the resubmitted plans addressing
the comments from the correction letter dated 01/16/2026 for the new buildings proposed at the
above address.
There are items that were not addressed adequately. Prior to considering issuance of the
building permit further attention to these items is needed. Item address adequately has been
removed.
Please provide a response letter addressing each item listed in the "Items to address prior to
issuing a building permit". Response not required for the "Conditions to be addressed during
construction" but please address if clarification is needed.
Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for
the resubmittal.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
Corrections to address prior to issuing a building permit:
The physical resubmittal only included (2) sets of 6 sheets. Several more sheets were
revised while addressing comments. Please submit all revised sheets.
Missing sheets: A1.0, A2.0, A3.0, A4.0, A5.0, A8.0, A10.0, B1.0, B1.1, B1.2, B1.3, B1.4,
C1.0, C1.1, C1.2, C1.3-new sheet, C1.4-new sheet,C2.2, C3.1, C3.2, C3.3, Stopped the
comparison.
Based on the extent of the changed sheets, Please resubmit (2) FULL sets of coordinated
plan sets. Civil Drawings are unchanged and are not required to be resubmitted.
Resubmitted 2 Full Physical Sets and one Digital.
1 Cover — The Code Summary is indicating the Snow Load as 40psf Ground Snow Load, the
County's amendment is to accommodate 40psf Roof Snow Load. Please see the attached
design criteria. Please change the drawings accordingly.
The digital drawings and the physical drawings still display 40psf Ground Snow Load.
Please revise both the digital and submit revised sheets.
Corrected See physical and digital Resubmission
11 Please provide a Geotech/Soils Report. (#7 of Resolution 2023-02)
A Geotech/soils Report was not found in the resubmittal.
Submitted 2 physical and 1 digital see File 19-7-437 (08-20-19) Subsoil Study
Conditions to be addressed during construction:
The plans have been designed to the 2021 International Building Codes. The adopted codes
in Garfield County are the 2015 International Codes except for the 2018 International
Energy Conservation Code. The code analysis is to complies with the 2015 IBC. There
could be conflicts in the different versions of the codes, I am not comparing codes during the
review.
The approved plans are to be on -site for inspections.
Sanitary facilities are required to be provided for workers
A list of required inspections will be attached to the plans. The State is to permit and
approve the electrical work.
https://www.colorado.gov/pacific/dora/DPO Electrical Plumbinq Permits
Underground utility locates is the responsibility of the owner or contractor. 811 is the
Colorado Utility Locate Hot Line.
Separate Sign Permits are required for any external signs. Please see the County website
for the application.
Electrical Code compliance will be determined based on field inspections performed by the
State Electrical Inspector, (303) 869-3458. Please have the inspector sign the building card
or provide written documentation of the inspections.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
Any water supply that feeds a fire suppression systems or fire hydrants are to be inspected
by the Fire Marshal prior to backfilling.
Please provide special inspections reports to the Building Department as specified within the
General Notes of the structural drawings.
Geotechnical observation is required when the excavation is complete and written
verification be supplied at footing inspection, 1500psf.
Combustible material is limited in Type I and Type II Construction. See IBC 603 for allowed
combustible materials.
All exterior lighting is to be downcast and shielded.
Safety glazing is not designated on the plans. Safety glazing will be checked during the
framing and final inspection. (IBC 2406.4)
A Knox Box is required to be mounted adjacent to the gate. Please contact the Local Fire
District for exact location.
All accessible door hardware shall have a shape that is easy to grip, including pocket and
sliding doors. (ANSI A117.1 — 404.2.6)
A passing blower door test for the office is required to be submitted prior to issuing the
Certificate of Occupancy.
The required landscaping and irrigation along the east side of the property is to be in place
prior to the Final Building Inspection.
A separate Building Permit is required for the Future Employee Housing shown on the Civil
Drawings.
All infrastructure piping and stormwater drainage is to be inspected by the engineer of
record. A stamped letter from the engineer accepting all infrastructure installation is required
prior to the final inspection.
The County is in receipt of the compaction reports that were performed during the Grading
Permit. The condition below, from the Resolution, is to be satisfied prior to the final
inspection approval for the structures.
14. Prior to the issuance of building permits, the applicant shall provide engineering
certification that all site improvements including but not limited to rockfall protection,
debris flow mitigation and associated structures and fire protection system to include the 4
hydrants and water storage tank have been installed and completed.
Sincerely,
P444 ;V&"
John Plano
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)945-8212
Building Official