Loading...
HomeMy WebLinkAboutEngineer's Approved DrawingsWater Specification Note 1) Refer to "Water Care Instructions" document for acceptable mineral levels 2) Do not use water supplied from a water softener 3) Do not add salt 4) Do not use Chlorine or Bromine 5) Do not use Ozone generators 6) Use only Hydrogen Peroxide as an oxidizor and UV for sanitation RESIDENTIAL REVISION CHANGES REV.DESCRIPTION DATE APPROVED A INITIAL RELEASE 6/16/2025 B ADJUST DIMENSIONS, REMOVE TWO STEPS, CHANGE LIGHT LOCATIONS, ADD SKIRTING 6/30/2025 C ADD JETS/JET PUMP 7/9/2025 D SWITCH TO GAS HEATER 7/30/2025 DSI Internal Use Only: Fabrication Plumbing Project Management Sales SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 1 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND IAPMOEGS ELECTRICAL 1) Electrical requirements are specified for each unit. Only a licensed qualified electrician should connect the power supply. 2) Some units require more than one supply circuit. All power supply circuits must be located in the same disconnect box. (per NEC) Disconnect box must be more than 5(five) feet away from the tub and less than 50(fifty) feet away and within sight of spa. 3) All spas require a continuous bond. All spas are shipped with a bond connection on the frame. This connection must be made in the field. 4) Never turn the power on to the spa if it is empty. The spa needs water to properly test and satisfy diagnostic computations. 5) All electrical supply to the tub must be GFCI protected. 6) Any nearby electrical outlets, windows, hand rails or metal fencing may have special bonding requirements. Consult your licensed qualified electrician. 7) The communication cables for touch pad, low voltage lighting and water level sensors must be housed in separate conduits from the power supply. Never run communication and line voltage wires together. GAS 1) Gas requirements are specified with each unit. (where applicable) 2) Gas lines must follow guidelines and code requirements for your location. 3) Ventilation and combustion air needs are different for each unit. Please take time to check all proposed heater locations with your gas company or gas fitter to insure adequate combustion air and ventilation. PLUMBING 1) Pipe materials for all pool recirculation and therapy lines to be schedule 40 PVC(ASTM D1785). PVC pipng shall be stamped with N.S.F. seal of approval. All plumbing fittings and pipe must be pressure rated. 2) Prior to connection to spa, all underground plumbing must be pressurized and maintain pressure for 24 hours minimum. 3) All plumbing stub-out locations will be labeled on drawing. Confirm location if applicable. 4) Never handle or lift tub by plumbing. It is the responsibility of the client to make sure that all products are in compliance with local codes andregulations. Certain jurisdictions may require additional testing and/or listing. It is also the responsibilityof the client to arrange and pay for any permits, permit fees, inspections and inspection fees.Consult your local governmental agencies for additional information. Diamond Spas, Inc reserves the right to change , amend and/or modify all or any part of the fabrication including but not limited to vessel and/or equipment design, layout and/or components, at any timewithout notice. Approval of this drawing is acknowledgement of this notice and is legally binding. GENERAL INSTALLATION GUIDELINES Stainless steel and copper can become hot if left in direct sunlight for extended periods of time. DSI recommends undermounting all outdoor spas. NEVER LEAVE THE SPA UN-COVERED WHILE EMPTY excessive heat can build up on the spa if it is not full of water. A solid or opaque covering will suffice. Heat damage is not covered under your warranty. NEVER LEAVE CHILDREN UNATTENDED AROUND SPA 1) Spa must sit on a smooth, flat, level concrete pad. Pad should be a minimum of 4" thick an or as per the structural engineer. 2) The area under the hot tub unit and the equipment must have a waterproof pan or membrane that goes into a drain to prevent flooding or water damage to the region below. 3) Certain applications may use plywood decking and or other material for tub support. 4) PVC and conduit requirements are specified for each tub. Make sure that all underground lines are pressure tested prior to and during back fill. 5) DSI will specify the necessary space requirements for remote location equipment rooms. Equipment rooms are to be no more than 50' from the spa unless previously discussed with DSI. The room is recommended to be at or below the same elevation of the spa. 6) DSI recommends a floor drain in the spa vault and the equipment room vault. 7) Once you have the tub placed and level, connect all water, air and communication lines. All plumbing and communication lines are clearly labeled at the stub out location spa side as well as on the equipment package. DSI recommends that you fill and test the spa at this time to verify proper connection of all water, air and communication lines. 8) Upon inspection of all plumbing and conduits, you may now build the remaining retaining vault wall. Take appropriate precaution that the lines are not disturbed during back fill. 9) It is the responsibility of the owner/user to provide clear and easy access on all sides of the spa for repair. Otherwise, all additional costs to service and repair the spa will not be incurred by DSI. In addition, access to autocover equipment well and filter niche must be maintained. Inspection ports and/or service access is very important, please take this recommendation into consideration. If you have any questions and or need design ideas please call Diamond Spas. STAINLESS STEEL CARE 1) Stainless steel is highly resistant to rust and corrosion. Stainless steel is extremely durable and with proper care and maintenance will maintain it's luster and appearance indefinitely. 2) DSI uses 316L or 304L grade stainless. Each unit has a random hand finish applied to it as all product is hand crafted, exhibiting a visible concise weld seam. 3) DSI recommends rinsing any exposed stainless steel with fresh water on a a regular basis to remove any salt air or pollution contaminate. 4) Minor build up and/or spotting is simply removed with regular care and a "Scotch-Brite" scouring pad. 5) NEVER use steel wool or steel brushes on a DSI product. These products are carbon steel and leave particles that will rust and create stains. 6) If you should notice any staining and/or discoloration on the stainless steel surface it must be removed immediately. Most discoloration and staining is removed with the "Scotch-Brite" scouring pad. After the area is cleaned rinse with fresh water and dry with a a soft cloth. 7) Metal surfaces can become very hot if exposed to direct sunlight. DSI recommends covering exposed metal with stone, wood or decking, installing under shading or otherwise shielding the metal from exposure. 8) If you have any questions, please contact DSI at 1-800-951-7727 COPPER CARE 1) DSI uses CR110 copper sheets to fabricate all units. All products are custom fabricated and TIG welded by hand. Each product has a hand buffed finish and patina applied to it. DSI can also leave the product in its raw copper state upon request. 2) DSI recommends cleaning with a mild detergent and a soft cloth. Wipe after each and every use to avoid water spotting. Detergents should be free from acidic, chlorine-based, bleach based or abrasive cleaners. These detergents may strip the natural patina from copper and distort your finish. Thoroughly rinse the area with a clean, damp rag and dry with a soft, clean cloth. 3) Do not add detergent to pool or spa water as it may cause foaming. 4) Unless otherwise specified, DSI does apply a patina after fabrication. The copper will continue to spot and react to it's environment. 5) Copper is a “living metal” and its appearance will continually change over time. As it reacts to it’s environment, a natural patina process will develop leaving a wide range of colors (browns, pinks and sometimes blues and greens). Please note: copper will not change evenly. It can spot and streak, and in some instances may appear mottled. For many clients this is a desired appearance. They like the unpredictable nature of copper and admire it’s character. DSI is unable to tell you the exact color your product will change to - it simply depends on the environment the product is exposed to. 6) Although rare, the possibility does exist that a deep patina finish may cause color change to parts of the body that come into contact with the bathing surface. To reduce the chance of this occurring, simply clean the bath with a copper cleaner. 7) Metal surfaces can become very hot if exposed to direct sunlight. DSI recommends covering exposed metal with stone, wood or decking, installing under shading or otherwise shielding the metal from exposure. 8) If you have any questions, please contact DSI at 1-800-951-7727 Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 95.80 12.00 12.00 12.00 60.00 16.00 16.00 2.00 120.00 84.00 24.10 24.10 24.00 16.00 18.00 162.00 144.00 24.00 24.00 44.00 .19 TOP PLATE THICKNESS 76.00 24.00 SKIRT ALL SIDES EXCEPT EQUIPMENT SIDE RIGGING ON CORNERS ACCESS TO AUTOCOVER MUST BE MAINTAINED SPA FRAME MUST BE IN COMPLETE CONTACT WITH A FLAT AND LEVEL STRUCTURAL SURFACE. INSTALLATION SURFACE TO MAINTAIN FLATNESS OF +/- 0.125". ANY GAP LARGER THAN 0.25" BETWEEN THE FRAME AND INSTALLATION SURFACE MUST BE SHIMMED. CONTACT DSI FOR SHIMMING INSTRUCTIONS SPA FRAME MUST BE IN COMPLETE CONTACT WITH A FLAT AND LEVEL STRUCTURAL SURFACE. INSTALLATION SURFACE TO MAINTAIN FLATNESS OF +/- 0.125". ANY GAP LARGER THAN 0.25" BETWEEN THE FRAME AND INSTALLATION SURFACE MUST BE SHIMMED. CONTACT DSI FOR SHIMMING INSTRUCTIONS TO PREVENT FRAME AND SHELL CORROSION, ADEQUATE DRAINAGE AND VENTILATION IS REQUIRED. FRAME OR SHELL MUST NOT RESIDE IN STANDING WATER. TOPSIDE CONTROL WITH COVER AND BLACK PLASTIC RECESS TOP PLATES SHIPPED LOOSE RIGGING MIRRORED ON OPOSITE SIDE SPA SURFACE PREPPED FOR TILE APPLICATIONTILE PROVIDED AND INSTALLED ON SITE BY OTHERDSI RECOMMENDS LATICRETE LATAPOXY300 TILE ADHESIVE WITH SPECTRALOCK PROEPOXY GROUT FOR PROPER TILE ADHESION TREAD FINISHES BY OTHERDSI NOT RESPONSIBLE FORSLIPPERY TREAD SURFACES METAL SURFACES CAN BECOME VERY HOT IF EXPOSED TO DIRECT SUNLIGHT. DSI RECOMMENDS COVERING EXPOSED METAL WITH STONE, WOOD OR DECKING, INSTALLING UNDER SHADING OR OTHERWISE SHIELDING THE METAL FROM EXPOSURE NOTE: DUE TO THE LENGTH OF THE POOL, MINOR WALL DEFLECTION IS EXPECTED. DEFLECTION CAN BE REDUCED BY BRACING WALL FRAME TO VAULT WALL ON SITE. -SPA SURFACE PREPPED FOR TILE APPLICATIONTILE PROVIDED AND INSTALLED ON SITE BY OTHER-DSI RECOMMENDS LATICRETE LATAPOXY300 TILE ADHESIVE WITH SPECTRALOCK PROEPOXY GROUT FOR PROPER TILE ADHESION-DSI RECOMMENDS ONLY SUBMERSIBLE POOL TILESBE INSTALLED FOR POOL AND SPA APPLICATIONS-ALL HORIZONTAL TILED SURFACES MUST BE NON-SKID TILE. NOTE: STAINLESS STEEL SKIRTING IN COASTAL ENVIRONMENTS REQUIRES WEEKLY MAINTENANCE TO PREVENT SURFACE RUST FROM DEVELOPING. DSI RECOMMENDS RINSING ANY EXPOSED STAINLESS STEEL SURFACE WITH FRESH WATER AND DRYING WITH A SOFT DRY CLOTH TO REMOVE ANY SALT CONTAMINATE. ANY STAINING OR DISCOLORATION ON THE STAINLESS STEEL SURFACE MUST BE REMOVED IMMEDIATELY. MOST DISCOLORATION AND STAINING CAN BE REMOVED WITH A SCOTCH-BRITE SCOURING PAD FOLLOWED BY RINSING WITH FRESH WATER. SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 2 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND NOTES: - due to the custom nature and welding processes involved in fabrication, there may be some distortion or warpingof the flat surfaces on our products. - all inside weld seams will be visible. - spa will be insulated with a 2-part polyurethane foam. - standard foam, snap-lock cover to be supplied w/ spa. SPA DATA - SPA SURFACE AREA = 78.6 SQ. FT. - SPA CAPACITY = 1650 GALLONS - SPA WATER WEIGHT = 13765 LBS. - SPA SHELL WEIGHT = 4560 LBS. - SPA TOTAL WEIGHT = 18325 LBS. DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL 1/4" TWO PLACE DECIMAL 0.25" Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 18.00 RECOMMENDED VAULT DIMENSION FOR FUTURE SPA REPAIR C C D D AA BB 48.00 2.00 TYP RECLINE 6.19 OPERATIONAL WATER DEPTH 18.00 66.00 SECTION C-C SCALE 1 : 45 6.19 OPERATIONAL WATER DEPTH 1.00 SECTION D-D SCALE 1 : 45 12.00 12.19 36.00 12.00 6.19 OPERATIONAL WATER DEPTH SECTION A-A SCALE 1 : 45 24.19 48.00 6.19 OPERATIONAL WATER DEPTH SECTION B-B SCALE 1 : 45 **IMPORTANT NOTE**TILE INSTALLER TO VERIFYJET FACE IS ABLE TO TURN-DO NOT GROUT JET FACE NOTE: ALL PENETRATIONS FOR FITTINGS INCLUDE 1/4" SS SHIM SPA SURFACE PREPPED FOR TILE APPLICATION TILE PROVIDED AND INSTALLED ON SITE BY OTHER DSI RECOMMENDS LATICRETE LATAPOXY 300 TILE ADHESIVE WITH SPECTRALOCK PRO EPOXY GROUT FOR PROPER TILE ADHESION TILE DETAILTYPICAL JET TILE DETAIL NOTE: MAINTAIN ANY DECK SUPPORT STRUCTURE 1" MIN FROM SPA SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 3 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 1 3 6 7 7 7 7 7 7 2 4 5 14 15 59911 9119 - 1.50" FNPT DRAIN FITTING BELOW AUTOCOVER DRIVE MOTOR -CONNECTION TO WASTEWATER BY OTHER 813 10 12 12 AUTOFILL SENSOR IN SKIMMER 2" STUBOUT PLUMBED TO SPITTERS BY OTHER PLUMBER TO MAKE CONNECTION AND RUN PIPING TO WATER FEATURE 8 8 8 88 8 88 88 8 10 8 8888 8 8 8 8 8 8 8 9 9 NOTES: - PLUMBING: - (2X) 3" PVC - SUCTION - (1X) 1.50" PVC - SKIMMER SUCTION - (1X) 2.50" PVC - JET RETURN - (1X) 2" PVC - CIRCULATION RETURN - (1X) 1" CONDUIT - COMMUNICATION AND SPA LIGHT POWER - SPA SHELL WILL INCLUDE (2X) BONDING LUGS TO BE BONDED W/ MIN. #6AWG BARE COPPER CONDUCTOR. - SPA LIGHT POWER REQUIRES MIN. 14 GA WIRE AUTO COVER: -KEYPAD INSTALLED REMOTELY BY OTHER WITHIN EYESIGHT NO MORE THAN 15 FEET FROM AUTOCOVER -REQUIRES 115V 20A GFCI SERVICE AT KEYPAD -REFER TO MANUFACTURER INSTALLATION INSTRUCTIONS FOR KEYPAD INSTALLATION -ACCESS TO AUTOCOVER WELL AND EQUIPMENT MUST BE MAINTAINED -FASTENERS FOR DECKING OR COPING CAN NOT BE INSTALLED INTO AUTO COVER RAILS NOTE: -TOPSIDE CONTROL SHIPPED LOOSE -MUST BE LOCATED OUT OF DIRECT SUNLIGHT OR COVERED -25' CABLE INCLUDED A C C E S S T O A U T O C O V E R M U S T B E M A I N T A I N E D NOTE: MORE THAN 12 AVERAGE SIZED PEOPLE WILL FORCE WATER TO OVERFLOW INTO AUTOCOVER WELL. OVERFLOW WATER WILL DRAIN TO WASTE VIA 1.5" DRAIN IN FLOOR OF AUTOCOVER WELL -FASTENERS FOR DECKING OR COPING CAN NOT BE INSTALLED INTO AUTO COVER RAILS -SPA SURFACE PREPPED FOR TILE APPLICATIONTILE PROVIDED AND INSTALLED ON SITE BY OTHER-DSI RECOMMENDS LATICRETE LATAPOXY300 TILE ADHESIVE WITH SPECTRALOCK PROEPOXY GROUT FOR PROPER TILE ADHESION-DSI RECOMENDS ONLY SUBMERSIBLE POOL TILESBE INSTALLED FOR POOL AND SPA APPLICATIONS “Ideal temperatures for cold plunge therapy are typically 50 - 59 degrees. Speak with your health care provider prior to using cold plunge therapy.” ITEM NO.QTY.EQUIPMENT DESCRIPTION 1 1 CUSTOM STAINLESS STEEL SPA 316 SS VESSEL WITH 3X2X0.125 SS FRAME 2 1 autocover - CoverStar - CS300 - LH automatic electric safety cover 3 1 AUTOCOVER STATIC SPOOL AUTOCOVER STATIC SPOOL 4 1 AUTOCOVER LEADING EDGE 5 2 AUTOCOVER RAIL 6 1 AUTOCOVER SPOOL 7 6 AUTOCOVER - LID SUPPORT 8 24 WATERWAY MINI STORM JET(BLACK) PNs: 228-0379-CPVC, 229-7921 JET - WATERWAY - MINI STORM THREAD 9 8 Balboa Suction - 5 Inch - #30169-V, 30239-LP, 30341-BK, 30240U-BK Balboa - VGB rated 256gpm - 2008 ASME Certified - 5" Suction 10 2 light - Waterway - 3.5 inch - #630-6005 // 3-1/2" face - front access - RGB LED w/ preset lighting patterns - 12volt -low voltage connection to control #410117-60-0-TLA, CONN, ASSY JUMPER, DAISY-LINK, 60",OVERMOLD (Qty.2) // #701570-14-DLSO-TLA, PCBA, 14 LED, RGB, SPA LIGHT, DAISY LINK W/ STANDOFF,OVERMOLD (Qty.1) 11 2 1.5" WALL FITTING, WATERWAY PN 400-9151, 213-9341,219-9191 BLACK WALL FITTING WITH NUT, GASKET, AND DIRECTIONAL EYEBALL (BLACK) 12 2 skimmer - Waterway - front access - 510-1501 square spa skimmer - 1-1/2" S / 2" spigot - flow control with trim plate 13 1 RGB LIGHT BALLAST 701678-DLO-TLA, SPA LED CONTROL-40, 2 POS, DAISY-LINK, OVERMOLD 14 1 AUTOCOVER - COVERSTAR - KEYPAD NUMERIC KEYPAD COVER CONTROL 15 1 SPA TOUCH 2TC - #57329 TOPSIDE CONTROL - BALBOA - SPA TOUCH 2TC SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 4 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 6 12 0 18 UNOBSTRUCTED EXHAUST SIDE CONNECTION WATER SIDE CONNECTION BACK FRONT (USER INTERFACE) TOP HEATER INSTALLATION CLEARANCES (in.) 34.00 50.00 42.51 78.02 49.84 1 3 11 6 2 10 4 75 HEATER MUST BE LOCATED AWAY FROM VESSEL AS PER LOCAL CODE 3 - 6" FREE FROM FLAMABLE MATERIALS MUST BE MAINTAINEDAROUND GAS HEATER - REFER TO MANUFACTURER INSTRUCTIONS AND LOCAL CODES FOR AIR INTAKE AND VENT INSTALLATION 2" STUBOUT PLUMBED TO SPITTERS BY OTHER 8 230 V TO SWITCH POWER BY OTHER WIRED TO HYDROQUIP WIRED TO OZONE 71.00 50.00 CLEARANCE REQUIRED FOR FILTER MAINTENANCE 74102 NOTES: - SPA REQUIRES (1X)230V 60A GFCI SERVICE @ EQUIPMENT FOR PUMP POWER/CONTROL (MFG RECOMMENDS 6 GA COPPER CONDUCTOR) - AUTOCOVER REQUIRES (1X) 115V 20A GFCI SERVICE AT KEYPAD - AUTOFILL REQUIRES 1/2" FRESH WATER LINE WITH BACKFLOW AND FREEZE PROTECTION LOCATED AT EQUIPMENT - ALL EQUIPMENT WILL INCLUDE (2X) BONDING LUGS TO BE BONDED W/ MIN. #6AWG BARE COPPER CONDUCTOR. * MUST HAVE ACCESS AROUND ENTIRE PERIMETER OF AUTOCOVER BOX FOR FUTURE SERVICE NEEDS EQUIPMENT MUST BE LOCATED IN AN ENCLOSED VENTILATED AREA, PROTECTED FROM WEATHEREQUIPMENT MUST BE LOCATED WITHIN 30 FT OF SPA AND AT OR BELOW WATER LEVELCONTACT DSI IF PLUMING RUN REQUIRES MORE THAN THREE 90 DEG TURNS - Autofill requires 1/2" fresh water line with backflow and freeze protection located at equipment - GAS HEATER CONFIGURED FOR NATURAL GAS OPERATION EQUIPMENT LOCATION: - EQUIPMENT TO BE WITH FT OF SPA WITH AN ELEVATION CHANGE OF FT - INSTALLER TO VERIFY EQUIPMENT LOCATION OMNILOGIC LOAD CENTER REQUIRES CLEARANCE FOR PANEL ACCESS. TYPICALLY A 30" WIDE BY 36" DEEP BY 78" TALL AREA IN FRONT OF THE SUB PANEL MUST BE CLEAR OF OBSTRUCTION. GC IS RESPONSIBLE FOR PROVIDING PROPER ACCESS PER LOCAL CODE REQUIREMENTS SELF CONTAINED VESSELS ARE INHERENTLY NOISY. A HUMMING NOISE OF 80 dB OR MORE CAN BE EXPECTED. IF NOISE IS A POTENTIAL FACTOR THAT COULD IMPEDE THE ENJOYMENT OF YOUR NEW SPA, A REMOTE EQUIPMENT SOLUTION SHOULD BE CONSIDERED. YOUR SALES MANAGER CAN HELP YOU WITH OPTIONS. - Autofill requires 1/2" fresh water line with backflow and freeze protection located at equipment - Ethernet connection to router is required for remote equipment operation EQUIPMENT LOCATION: - EQUIPMENT TO BE WITH FT OF SPA WITH AN ELEVATION CHANGE OF FT - INSTALLER TO VERIFY EQUIPMENT LOCATION - INSTALLER TO CONTACT DSI IF INSTALLATION LOCATION CHANGES OR DOES NOT MATCH EQUIPMENT TO BE LOCATED INDOORNOTE: AMBIENT AIR TEMPERATURE AND OTHER ENVIRONMENTAL FACTORS WILL EFFECT CHILLER EFFICIENCY. MINIMUM ACHIEVABLE TEMPERATURE IS APPROXIMATELY 40° F.CHILLER: SHIPPED ON SEPARATE SKID WITH UNIONS.- TO MAINTAIN PROPER OPERATION OF CHILLER, IT IS IMPERATIVE THAT THE EQUIPMENT ROOM IS AIR CONDITIONED AND VENTILATED SO NOT TO EXCEED AN AMBIENT OPERATING TEMPERATURE OF 75 DEGREES FAHRENHEIT**COLD PLUNGE CONNECT PLUMBINGMUST BE INSULATED**TRANSFORMER: SHIPPED LOOSE & INSTALLED ON SITE BY OTHER.- FOR 120V 15A SWITCHED POWER WIRED BY OTHER.LED LIGHT CONTROLLER: SHIPPED LOOSE & INSTALLED ON SITE BY OTHERINTERMATIC TIMER - TIME CLOCK: SHIPPED LOOSE & INSTALLED ON SITE BY OTHER.- INSTALLER IS RESPONSIBLE FOR PROVIDING PROPER ACCESS PER LOCAL CODE REQUIREMENTS.PLUMBING BETWEEN EQUIPMENT & VESSEL:- MUST BE INSULATED TO PREVENT CONDENSATION NOTE: MORE THAN 4 AVERAGE SIZED PEOPLE WILL FORCE WATER TO OVERFLOW INTO AUTOCOVER WELL. OVERFLOW WATER WILL DRAIN TO WASTE VIA 1.5" DRAIN IN FLOOR OF AUTOCOVER WELL -CHILLER: SHIPPED ON SEPARATE SKID WITH UNIONS. -CHILLER REQUIRES CLEARANCE FOR PROPPER VENTILATION. -TYPICALLY 8" OF SPACE IN THE REAR, 48" TO BOTH SIDESAND 60" TO THE FRONT. -REFER TO MANUFACTUTERS INSTRUCTIONS FOR VENTING REQUIREMENTS. - TO MAINTAIN PROPER OPERATION OF CHILLER, IT IS IMPERATIVE THAT THE EQUIPMENT ROOM IS AIR CONDITIONED AND VENTILATED SO NOT TO EXCEED AN AMBIENT OPERATING TEMPERATURE OF 75 DEGREES FAHRENHEIT **COLD PLUNGE CONNECT PLUMBING MUST BE INSULATED** EQUIPMENT ROOM MUST BE ADEQUATELY VENTILATED TO PREVENT MOISTURE ACCUMULATION. REFER TO LOCAL CODE FOR REQUIREMENTS. “COLD PLUNGES AND COLD PLUNGE EQUIPMENT WILL accumulate condensation DURING NORMAL OPERATION. VESSEL INSTALLATION LOCATION AND EQUIPMENT ROOM MUST BE ADEQUATELY VENTILATED AND CONSTRUCTED WITH A FLOOR DRAIN TO PREVENT MOISTURE collection. REFER TO LOCAL CODE FOR REQUIREMENTS.” REFER TO MANUFACTURER AND LOCAL CODES FOR FURTHER INSTALLATION INSTRUCTION PLUMBING BETWEEN EQUIPMENT & VESSEL MUST BE INSULATED TO PREVENT CONDENSATION **SPA MUST BE INSULATED** NOTES: - SPA REQUIRES (1X)230V 60A GFCI SERVICE @ EQUIPMENT FOR PUMP POWER/CONTROL (MFG RECOMMENDS 6 GA COPPER CONDUCTOR) - SPA REQUIRES (1X)230V 60A GFCI SERVICE @ EQUIPMENT FOR PRIMARY 11KW HEATER (MFG RECOMMENDS 4 GA COPPER CONDUCTOR) - SPA REQUIRES (1X)230V 125A GFCI SERVICE @ EQUIPMENT FOR COATES HEATER (MFG RECOMMENDS 4 GA COPPER CONDUCTOR) - AUTOCOVER REQUIRES (1X) 115V 20A GFCI SERVICE AT KEYPAD - AUTOFILL REQUIRES 1/2" FRESH WATER LINE WITH BACKFLOW AND FREEZE PROTECTION LOCATED AT EQUIPMENT - ALL EQUIPMENT WILL INCLUDE (2X) BONDING LUGS TO BE BONDED W/ MIN. #6AWG BARE COPPER CONDUCTOR. * MUST HAVE ACCESS AROUND ENTIRE PERIMETER OF AUTOCOVER BOX FOR FUTURE SERVICE NEEDS EQUIPMENT MUST BE LOCATED IN AN ENCLOSED VENTILATED AREA, PROTECTED FROM WEATHEREQUIPMENT MUST BE LOCATED WITHIN 30 FT OF SPA AND AT OR BELOW WATER LEVELCONTACT DSI IF PLUMING RUN REQUIRES MORE THAN THREE 90 DEG TURNS - 6" FREE FROM FLAMABLE MATERIALS MUST BE MAINTAINEDAROUND GAS HEATER- DIRECT AIR INTAKE DUCT KIT AND FLUE COLLAR ADAPTER PROVIDED BY DSI- REFER TO MANUFACTURER INSTRUCTIONS AND LOCAL CODES FOR AIR INTAKE AND VENT INSTALLATION EQUIPMENT LOCATED OUTDOORS IRON MIGHT PUMP CONNECTED TO EXISTING WATER FEATURE BY OTHER ITEM NO.QTY.EQUIPMENT DESCRIPTION VOLTAGE HP / Amp NOTES 1 1 EQUIPMENT SKID 14 GA 304L STAINLESS STEEL EQUIPMENT SKID 2 1 ENERGY EFFICIENT SINGLE SPEED PUMP P/N SP2305X7EE HAYWARD MAXFLO XL-SP2305X7EE 230V 0.75 HP 2" SUCTION, 1.5" RETURN 3 2 pump - Waterway - Executive 56 - 4hp - 372162A-13 2-speed centrifugal pump and motor, 4 h.p., 130gpm @ 60 ft.TDH, 2 1/2" suction, 2" discharge 230 volt 4 h.p.- 4.4 amp / 12 amp 230V connection to control 4 1 HAYWARD HYDRAPURE UV AND OZONE SYSTEM-REQUIRES 49" CLEARANCE UV/OZONE SANITIZER, 10-120 GPM, PN: 004952002000 120/240V 5 1 INLINE ZINC ANODE P/N 104-D 6 1 chemical pump - Stenner - Peristaltic Pump #E10T1F 3-point roller peristaltic chemical pump -- 1/4" OUTLET 120 volt 60 Hz , 240volt 50 Hz .17 AMP 25 psi max operating pressure, 3 oz per hour, Programmable pump with automatic dosing control for timed applications 7 1 HAYWARD HC-SERIES UNIVERSAL GAS HEATER 275,000 BTU DUAL-FUEL, MIN/MAX FLOW RATES 25/125 GPM, PN: HDF-275 8 1 pump - Waterway - Iron Might - 3J10020-0E86 Centrifugal pump and motor, 1/8 h.p., 40gpm@10ft.TDH, 1-1/2" suction, 1-1/2" discharge 230 volt 1.3 amp 9 1 HYDROQUIP REMOTE HEATER SYSTEM 11KW, OUTDOOR RATED HYDROQUIP P/N CS8800A, 50 amp max system breaker-6ga copper wire and 60 amp max heater breaker-4ga copper wire heater breaker 240V 2" UNIONS 10 1 HAYWARD SWIM CLEAR FILTER 200 HAYWARD SWIM CLEAR FILTER P/N C200 50" CLEARANCE REQUIRED FOR FILTER SERVICE 11 1 AUTO FILL LEVELOR K1100 auto-fill control - input from sensor - 24VAC output to 1" solenoid valve 115/230 volt 1/.5 amp 115V connection to control. requires 1/2" backflow protected and freeze protected water line. ***DO NOT CONNECT TO WATER SOFTENED LINE*** SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 5 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 146.00 29.20 29.20 29.20 29.20 29.20 144.00 2.00 4.00 ASTM TAPERED FOAM COVER NOTES: *PROJECTS WILL NOT BE SCHEDULED UNTIL COVER COLOR IS SELECTED* 10" ADJUSTABLE STRAP LOCATIONS ARE DETERMINED BY COVER MANUFACTURER UNLESS OTHERWISE NOTED BY CLIENT - INCLUDES A MINIMUM OF 8 EVENLY DISTRIBUTED STRAPS. COVER MANUFACTURER MAINTAINS A +1.0" TOLERANCE ON OVERALL COVER DIMENSIONS FLOATING FOAM COVER *FLOATING COVERS DO NOT MEET SAFETY BARRIER REQUIREMENTS* COLOR: TBD NOTE: STRAP LOCATIONS ARE DETERMINED BY COVER MANUFACTURER UNLESS OTHERWISE NOTED BY CLIENT COVER MANUFACTURER MAINTAINS A -1.0" TOLERANCE ON OVERALL COVER DIMENSIONS ASTM TAPERED FOAM COVER NOTES: SEWN COVER STRAPS/BUCKLES EXCLUDEDCOVER TO BE SECURED USING SEPERATE HOLD DOWN STRAP KIT AND ANCHORS. ANCHORS TO BE INSTALLED IN DECKING PER MANUFACTURER INSTRUCTIONS FOR ASTM COMPLIANCE *IF COVER COLOR IS NOT SELECTED AT TIME OF APPROVAL DEFAULT COVER COLORS WILL BE PROVIDED* COVER MANUFACTURER MAINTAINS A +1.0" TOLERANCE ON OVERALL COVER DIMENSIONS ASTM TAPERED FOAM COVER NOTES: 10” adjustable strap locations are determined by cover manufacturer unless otherwise noted by client - Includes a minimum of 8 evenly distributed straps. Spa covers must be strapped down to a flat, level surface. Locking cover strap buckles will be provided and must be installed on site for ASTM compliance. Covers that exceed 108” in length will not be warrantied by the manufacturer against sagging, puddling, buckling or breakage *IF COVER COLOR IS NOT SELECTED AT TIME OF APPROVAL DEFAULT COVER COLORS WILL BE PROVIDED* COVER MANUFACTURER MAINTAINS A +1.0" TOLERANCE ON OVERALL COVER DIMENSIONS F O L D V E L C R O F O L D V E L C R O SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 6 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND SHEET OF DRAWN CHECKED UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. DO NOT SCALE DRAWING MATERIAL FINISH Rotary Hand Brushed THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF DIAMOND SPAS INC. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF DIAMOND SPAS INC. IS PROHIBITED. 4409 Coriolis WayFrederick, CO 80504ph. 720-864-9115 1-800-951-SPASfax. 1-866-605-2358 GB 8/1/2025CS 8/1/2025 6 6 304 / 316 L STAINLESS STEEL REVISION D HYDROSPA 5523 - RIVERS BEND Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 Diamond Spas Inc 4409 Coriolis Way Frederick, CO 80504 (720) 864-9115 Fax 866-605-2358 Drawing Approval for Fabrication Project # __________________ Project ID: _____________________________________ Design Manager: ________________________ Drawing Revision: ____________ Drawing Date: ____________________ Total Pages in Drawing Set: __________ It is the responsibility of the purchaser to make sure that all products are in compliance with local codes and regulations. Certain jurisdictions may require additional testing and/or listing. It is also the responsibility of the client to arrange and pay for any permits, permit fees, inspections and inspection fees. Consult your local government agencies for additional information. Diamond Spas Inc reserves the right to change, amend and/or modify all or any part of the fabrication including but not limited to vessel and/or equipment design, equipment layout and/or components at any time without notice. Approval of the referenced drawings is acknowledgement of this notice and is legally binding. Diamond Spas Inc will not change the overall vessel design without prior written acknowledgement from client. Insulated Foam Cover Color Choice: __________________________________ Automatic Cover Color Choice: ________________________________________ Cover Color Link: https://www.diamondspas.com/swimming-pool-spa-collection/custom-spas-hot-tubs/spa-cover-colors/ Project Primary Contact: _______________________________________________________ Phone #: _________________________________________________________________________ Email: _____________________________________________________________________________ Project Installation Address: ___________________________________________________ ___________________________________________________ Project Installer: _________________________________________________________________ Phone #: __________________________________________________________________________ Email: _____________________________________________________________________________ I, __________________________ acknowledge that I have read, understand and approve the entirety of the drawing set; as outlined in "total pages in drawing set" above, as drawn. I further acknowledge I am the owner/purchaser or are a fully authorized agent acting on behalf of the owner, have the requisite authority to bind the owner and have informed the owner of the terms and conditions outlined above. Digital acknowledgements and signatures are legally binding. Signed: ___________________________________________________ Date: _____________________________ This may not be the ship to address Not Applicable Not Applicable Rivers Bend 8/1/2025D 6 5523 Charlie Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 Briston Peterson PSI Craned 417 Rivers Bend, Carbondale, CO 81623 970-948/5597 970-948-5597 Aspen Glen Black Briston @briko.com Charcoals Briston 8/4/2025 Briston @brikor.com Project # __________________ Project ID: _____________________________________ Design Manager: ________________________ Drawing Revision: ____________ Drawing Date: ____________________ Construct a crawl space a person can enter to make repair, minimum 18" wide Plan to construct removable panels to gain access Plan for a method to slide, move or hoist the vessel to gain access Plan for demolition to occur or gain access Plan to hoist vessel as necessary All service and repairs require access to the outside of the vessel. The purchaser accepts the related responsibility for the method of access selected as part of the architectural design, outside of the DSI scope of work. The referenced drawings do not include access unless it is part of the metal fabrication we provide. Diamond Spas Inc recommends a minimum vault of 18" wide surrounding vessel for future maintenance. The following access methods have been reviewed and considered: NOTE: Installer should test the vessel for leaks prior to completing surrounding finishes. Diamond Spas Inc 4409 Coriolis Way Frederick, CO 80504 (720) 864-9115 Fax 866-605-2358 Access Method Acknowledgement I, __________________________ acknowledge that I have read, understand and acknowledge my responsibility regarding future maintenance access. I further acknowledge I am the owner/purchaser or are a fully authorized agent acting on behalf of the owner, have the requisite authority to bind the owner and have informed the owner of the terms and conditions outlined above. Digital acknowledgements and signatures are legally binding. Signed: ___________________________________________________ Date: _____________________________ Rivers Bend D Charlie 8/1/2025 5523 Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 Briston 8/4/2025 Diamond Spas Inc 4409 Coriolis Way Frederick, CO 80504 (720) 864-9115 Fax 866-605-2358 Fabrication Scheduling Project # __________________ Project ID: _____________________________________ Desired Project Delivery Date: _______________________________________________________ I acknowledge I am the owner/purchaser or are a fully authorized agent acting on behalf of the owner, have the requisite authority to bind the owner and have informed the owner of the terms and conditions outlined above. Digital acknowledgements and signatures are legally binding. Signed: ___________________________________________________ Date: _____________________________ I understand there is $160 per day storage fee in the event i ask Diamond Spas Inc to hold my completed project past the scheduled ship date I understand there is a $1000 late fee in the event the final payment is received after the due date (21 days prior to scheduled ship date) I understand there is a $1000 cancellation fee due to the carrier in the event I cancel the shipment of my project after arrangements have been made with the carrier ________ _______ ________ Rivers Bend We are asking for a general timeline to try and better schedule your project Your requested delivery date is not a confirmation of scheduling. We are currently shipping newly approved projects between October - December (depending on scope and subject to change). Projects are scheduled in the order received. 5523 Docusign Envelope ID: 200FB013-8AEA-4E1C-A5E9-6E7B1E8190D3 October first week 8/4/2025