Loading...
HomeMy WebLinkAboutObservation of Excavation 03.16.2026 March 16, 2026 Geo Quest Project No. 26-118 Dale Bauer 12 Sunrise Boulevard Silt, CO 81652 970-618-7435 dale@truenorthcolorado.com Subject: Open Hole InspecƟon and CompacƟon TesƟng of Engineered Fill Mr. Bauer, Geo Quest (GQ) visited the foundaƟon excavaƟon for a new residence at 611 ScuƩer Lane east of Rifle on March 2nd, 10th and 13th to observe subgrade condiƟons and the engineered fill secƟon. GQ made short site visits and did not perform full Ɵme observaƟon of the work. GQ observed and tested the compacƟon of two 12-inch layers of road base using the nuclear density method. GQ observed the road base that was placed with moisture and compac Ɵon control within the foundaƟon footprint areas using a vibratory plate compactor and walk behind sheepsfoot roller. The density of the engineered fill secƟon was at least 95% of the maximum dry density of the standard Proctor value. This meets and exceeds the 1,500 psf bearing capacity value that is referenced in the structural plan set produced by Studio M Engineers, LLC. Photos of the site and compacted fill are presented below in Figures 1 and 2. Respecƞully submiƩed, Geo Quest, LLC Kevin E. Dye, P.E. 3/16/26 Figure 1 – View looking north at foundaƟon excavaƟon Figure 2 – View looking west, tesƟng top of 24 inches of compacted road base