HomeMy WebLinkAboutEngineer's OWTS Design PlanI I tA1
VEI
I
Ma (APPROXIMATE LOCATION) -9404� /
(CATION AND SETBACKS PRIOR TO CONSTRUCTION %
1 SR
1 1 _ o
\ 04
\ 11 L 1 /o0 46, 1 /
11
l 410'f
\ v� PROFILE /� /� /I\ /
I rn \ PIT PRO-2
O �TPRO-1-�''
\
00 III-ti -� \� pRppM �__;�- -- ----- �� --- -�\
O
FIN
4' COU
\\ a SEWERi
Vi
SER
i SWEEP BEND
LOT 3 %'/i''/ /'�' - / PVC WYx E4'
�
/ / SEWER CLEAN OUT DETAIL
RUIZ SOUTH MINOR SUBDIVISION ,% /� i y N.T.S.
ti 1059 COUNTY ROAD 331 -/ \
70 LF 4" PVC ® 2% MIN. AND LONG SWEEP ELBO
60 LF 4" PVC ® 2% MIN, AND LONG SWEEP ELBOW
50 LF 4" PVC 0 2% MIN. AND LONG SWEEP ELBOWS
\
DIRT DRIVE[ / \-� ,-/ - \ ' � �� 35 LF 4" PVC ® 2% MIN. AND LONG SWEEP ELBOWS
� ..- ' � � �'� - -� -i_ � �, -_. l � ` - /
L? 25 LF 4" PVC 0 2% MIN. AND LONG SWEEP ELBOWS
20 LF 4" PVC @ 2% MIN. AND LONG SWEEP ELBOWS
1
25.0' Water_PipelinT?,�\` `\ ���.� x�\ 10 LF 4" PVC ® 2% MIN. AND LONG SWEEP ELBOWS
/-A Right -of -Way
Easement; No. 2 PROPOSED A.D.U. TANK INSTALL y
1 1 000 GALLON 2 COMPARTMENT TANK,
�l� /% Reception Nb. 7$5066 �\ J I \\ 24' RISERS, COVERS FLUSH WITH FINISH
L 11 GRADE AND EFFLUENT FILTER n
10 LF 4" PVC 0 2% MIN. y
IF PLUMBING
INSTALLED RAW SPACE OR SEM N NBASEMENT
AGEPUMP
25.0 Gas Pipeline
Right -of -Way Easement THEN A SE MAY BEINDER NECESSARY
� II �` 1 Reception No. 785066� /
1\o��^m1 OwE��NG
/ z I I I 1 0^ , PROPOSED SANITARY SEWER
I I l I I I \ M DISCHARGE LOCATION
' } NO l I' I 1 \ /� J / (REFER TO PLUMBING PLANS)
n^-'\- / 4"0 PVC CLEAN OUT WITH RISER
N I I /) J 1 b \ V // AND CAP, FLUSH WITH SURFACE
/qz
Ilk Cy
,
II II} II� j II20.0' Irrigation Ditch \k \1 ,�� ;' 0 C
Easement
Reception No. 785066,-�` '11 o�ca.\o�
0.
0
GRAPHIC SCALE
30 0 15 30
2%
/
D 14*04'13"
R 550.18'
L 135.11'
( IN FEET )
1 inch = 30 ft.
50,
_", :o --.r
GRAPHIC SCALE
60 0 30 60
( IN FEET )
1 inch = 60 ft.
v.
X
PROPOSED A.D.U.
DISTRIBUTION BOX INSTALL
TUF-TITE 9HD2 WITH FLOW
EQUALIZERS. RISERS, AND
J LID AT FINISH GRADE
15 10 LF 4" PVC 0 2% MIN.
AND LONG SWEEP ELBOW
G
05 R
TOP SOILS AM
RA& 6ACIff1LL
OVER TRQIGES
Ir WK COwi
4g' wv6 cow.
INSTALL 70 ARC 36 CHAMBERS IN 7
ROWS OF 10 EACH WITH END CAPS
INSTALL END CAPS WITH 4"0 PVC
INSPECTION PORTS AND CAPS AT
BOTH ENDS OF EACH ROW, FLUSH
OR ABOVE GRADE (TYPICAL)
w t
z
EXISTING MAIN HOUSE
SEPTIC CLEAN OUT
TO REMAIN IN PLACE
EXISTING MAIN HOUSE
DISTRIBUTION BOX
TO REMAIN IN PLACE
EXISTING MAIN HOUSE
-SEPTIC TANK
TO REMAIN IN PLACE
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE GARFIELD COUNTY PUBLIC
HEALTH AGENCY ON -SITE WASTEWATER TREATMENT SYSTEM REGULATIONS, EVEN
THOUGH ALL SUCH REQUIREMENTS ARE NOT SPECIFICALLY NOTED ON THIS
DRAWING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH SPECIFIC DETAILS
AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS.
2. SYSTEM DESIGN FLOWS:
PROPOSED ADU: 3 BEDROOMS
PROPOSED POPULATION: 6 PEOPLE
PROPOSED DISCHARGE: 75 GAL./PERSON/DAY
TOTAL AVERAGE DAILY FLOW: 450 GAL/DAY TABLE 6-1
PROPOSED SEPTIC TANK MATERIAL: REINFORCED CONCRETE
MINIMUM SEPTIC TANK CAPACITY: 1,000 GALLONS TABLE 9-1
SOIL TYPE: 3A, U.S.D.A. CLASSIFICATION: SILTY CLAY LOAM TACTILE EVALUATION
TREATMENT LEVEL: TL1
PROPOSED TREATMENT SYSTEM: CHAMBERS IN TRENCH CONFIGURATION
METHOD OF EFFLUENT APPLICATION: GRAVITY
LONG TERM ACCEPTANCE RATE (LTAR): 0.30 GAL/DAY/SQ. FT. TABLE 10-1
REQ'D SOIL TREATMENT AREA:A= 450 GPD = 1,500 SQ. FT. FORMULA 43.10.C.4
0.30 GPD/S.F.
SIZE ADJUSTMENT FACTOR FOR APPLICATION METHOD: 1.0 TABLE 10-2
SIZE ADJUSTMENT FACTOR FOR DISTRIBUTION MEDIA: 0.7 TABLE 10-3
ADJUSTED SOIL TREATMENT AREA: A= 1,500 SQ. FT. x 0.7 = 1,050 SQ. FT.
MINIMUM NUMBER OF CHAMBERS: 1,050 S.F. = 70 CHAMBERS
15 S.F./CHAMBER
INSTALL 70 ARC 36 CHAMBERS IN A 7 PARALLEL TRENCH
CONFIGURATION OF 10 CHAMBERS EACH, AS SHOWN.
3. TOPSOIL: SOIL EXCAVATED FROM SITE ACCEPTABLE IF NO CLAY IS PRESENT.
4. VEHICULAR TRAFFIC IS PROHIBITED ON THE TANK AND ON THE FIELD.
5. CLEANOUTS ARE REQUIRED AT ALL BENDS AND AT LEAST EVERY 150
FEET ALONG THE EFFLUENT LINE.
6. INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS POINTS AT OR ABOVE
THE FINAL GRADE.
7. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG
AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED.
8. PROVIDE POSITIVE DRAINAGE OF SURFACE WATER AWAY FROM
ABSORPTION AREA USING DRAINAGE SWALES AS NECESSARY.
9. THE CONTRACTOR SHALL VERIFY ALL DEPTHS, SLOPES AND CLEARANCES FROM
THE PROPOSED HOME, WELLS AND STRUCTURES, PRIOR TO CONSTRUCTION.
10. THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. PERMIT MUST
BE OBTAINED FROM APPROPRIATE COUNTY OFFICIALS.
11. THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR
FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS OR
FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM.
12. SEPTIC TANK SHALL HAVE RISES OVER EACH ACCESS MANHOLE AND ALL RISERS
SHALL EXTEND TO OR ABOVE FINAL GRADE,
13. THE OWNER SHALL VERIFY ADEQUATE SEPARATION DISTANCES FROM THE SYSTEM,
PRIOR TO DRILLING ANY WELLS ON THE SITE
14. THE APPLICANT OR LICENSED INSTALLER SHALL NOTIFY THE COUNTY AND THE
ENGINEER NO LESS THAN TWO BUSINESS DAYS IN ADVANCE TO SCHEDULE A
FINAL FIELD INSPECTION OF THE SYSTEM, PRIOR TO BACKFILUNG THE SYSTEM.
15. THE APPLICANT OR LICENSED INSTALLER SHALL PROVIDE AN AS -BUILT
DRAWING OF THE SYSTEM TO THE COUNTY AND ENGINEER, UPON COMPLETION.
4
16. PLACE 2" BLUE BOARD INSULATION ABOVE ALL PIPES WHENEVER DEPTH IS LESS
THAN FROST DEPTH.
17. ALL SEWER LINES SHALL BE 4-INCH DIAMETER POLYVINYL CHLORIDE (PVC)
SCHEDULE 40, AND SHALL BE INSTALLED WITH MINIMUM SLOPES NO LESS THAN 2%
18. THE PROPERTY LINES AND IMPROVEMENTS SHOWN HEREON WERE OBTAINED FROM
THE " AS PREPARED BY BOOKCUFF SURVEY
SERVICES INC, DATED: 8 9 19 AND 2/18/20.
19. PROPOSED IMPROVEMENTS AND TOPOGRAPHIC CONTOUR INFORMATION WERE
OBTAINED FROM THE yAS
PREPARED BY: BOOKCLIFF SURVEYSERVICES INC., DATED: 11 24 25.
ABSORPTION TRENCH NOTES
1. ABSORPTION TRENCH LATERALS SHALL NOT EXCEED 100 FEET IN LENGTH.
2. THE BOTTOM OF THE ABSORPTION TRENCHES SHALL BE LEVEL.
3. DRAINAGE DITCHES SHALL PROVIDED ABOVE AND AROUND TRENCHES, AS
NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORP1ION AREA.
D 4. ABSORPTION TRENCH BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE SOIL
SMEARS INCURRED DURING EXCAVATION.
5. NO EXCAVATION OF ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER
AND USE OF RUBBER TIRE VEHICLES OVER TRENCH AREA IS PROHIBITED TO
MAINTAIN GOOD SOIL STRUCTURE.
6. UNSUITABLE MATERIAL EXISTING WITHIN THE TRENCH SHALL BE EXCAVATED AND
BACKFILL SHALL CONSIST OF ONSITE SELECT OR PIT -RUN MATERIAL.
7. CONTRACTOR SHALL INSTALL 4 INCH DIAMETER SCHEDULE 40 PVC INSPECTION
PORTS AND CAPS AT BOTH ENDS OF EACH ROW OF CHAMBERS, IN ACCORDANCE
WITH THE MANUFACTURER'S INSTALLATION GUIDELINES.
S. CONTRACTOR SHALL SNAP OFF THE MOLDED SPLASH PLATES LOCATED AT
THE BOTTOM OF THE END CAPS, AND INSTALL THE SPLASH PLATES AT
THE APPROPRIATE SLOTS BELOW THE INLETS IN ACCORDANCE WITH THE
MANUFACTURER'S INSTALLATION GUIDELINES.
9. CONTRACTOR SHALL ALIGN THE CHAMBER ROWS PARALLEL WITH THE
THE CONTOURS OF THE EXISTING TERRAIN. THE CONTRACTOR MAY CURVE
THE ALIGNMENT OF THE CHAMBER ROW, AS NECESSARY. IN ACCORDANCE
WITH THE MANUFACTURER'S INSTALLATION GUIDELINES.
10. CONTRACTOR SHALL PROVIDE AND VERIFY A MINIMUM 4 FEET OF DEPTH, OR
GREATER FROM THE BOTTOMS OF INSTALLED CHAMBERS TO CONFINING BEDROCK.
11. CONTRACTOR SHALL PROVIDE AND VERIFY A MINIMUM 12 INCHES OF COVER, OR
GREATER FROM THE TOPS OF INSTALLED CHAMBERS TO FINISH GRADE.
12. CONTRACTOR SHALL CONNECT THE 4 INCH DIAMETER PVC THE DISTRIBUTION
LATERAL PIPES AT THE MOLDED CIRCULAR BLOCK OUTS. WHICH ARE SITUATED
8 INCHES ABOVE THE BOTTOMS OF THE STANDARD QUICK 4 PLUS CHAMBER
END CAPS, IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION GUIDELINES.
PRO-1
PRO-2
EL=54104:
EL=5409f
5410
5410
F
W
5409
5409
5408
5408
P
5407
5407
a
�
saos
saos
5405
5405
5404
5404
0
5403
5403
0
�
�
5402
5402
5401
5401
LEGEND:
® TOP SOIL: USDA SOIL TYPE 3 SILTY CLAY LOAM
® USDA SOIL TYPE 3A SILT CLAY LOAM
NOTES:
1. PROFILE PITS WERE EXCAVATED BY OWNER DURING FEBRUARY, 2020.
2. NO FREE WATER WAS ENCOUNTERED IN THE PITS AT THE TIME OF THE SOILS EVALUATION,
3. SOIL SAMPLES WERE FIELD EVALUATED AND CLASSIFIED BY COUNTRY ENGINEERING INC. ON
FEBRUARY 22, 2020. BY VISUAL AND TACTILE METHODS ESTABLISH BY THE U.S.
DEPARTMENT OF AGRICULTURE AND THE NATURAL RESOURCE CONSERVATION SERVICE.
FINAI
3- 2- 26
FOR AND ON BEHALF OF
HIGH COUNTRY ENGINEERING, INC.
ir W U
Z Z >
OOr"W a
Uw�O z
l'o .--: Imo-: CD
00 N g 4
zu N z_ 11:j x 0 1) m
�FO
�w Co om
ao ' M 6
U LO -.
O a
U
�zn
V
In
Z
�.
O�qm
W
W
Go
Z
PON
o
W�
ci
Z
>aW
w
W
4 1 (D
_
�I
.
I"
501
®
Z
m .
nzr
W 0}
O
YJw
U
0
o
�r
0.
rI
V
2
2
'
0
(a
E_
i-
N
.L
0p
®
w
U
J
Ld
rn
w
0
0
w
�
Q
0 .
i�-
O_j
J�
Q
CO
L1J
�
U
¢0
0
d
U)
N
W
N
N
Q
PROJECT NO.
2261001
.00
OWTS - O
1
C1
1" =