Loading...
HomeMy WebLinkAboutBlower Door Test Report2173 River Road Accurate Insulation � Grand Junction, CO. 81505 Builder: IVWL 6 Community: I, li � (1 . [J.,. , � Lot# City: Duct Leakage Test Results System# 1 (P3 cfm25 System# 2 Q cfm25 System# 3 cfm25 Sum of any others: Total of all: cfm25 cfm25 State: Prescriptive Method 23 ❑ Performance/ERI Method 0-- Prescriptive Method cfm25(total) To qualify as "substantially leak free", Qn total must be less than or equal to 0.04 if air handler unit is installed. If air handler unit is not installed, Qn Total must be less than or equal to 0.03. This testing method meets the requirement in accordance with Section R403.3.3. Is the air handler unit installed during testing? YES (=0.04 Qn) ❑ NO (=0.03 Qn) (51-7 Total z u 03 -Q n of All Systems Total Conditioned 5F Pass � Fail Company Name: Accurate Insulation Signature of Tester: Printed Name: Phone: Rich Romero 970-901-6868 Accurate Insulation Permit#: n Job Information Builder: al( h hW`7 � Community: Lot: Address: I Ll (o ( JI , , 11I C ► 1, 1e,,- ( '` } City: State: Zip: Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method Prescriptive Method- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at pressure of 0.2-inch w. g. (50 Pascals) in Climate Zones 1 and 2. Performance or ERI Method -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH (50) value, as shown on Form R405-202 (Performance) or R406-2020 (ERI), section labeled as infiltration, subsection ACH50. ACH (50) specified on Form R405-202-Energy Cak (Performance) or R406-2020 (ERI): 6 q Z x 0 1�3. -7 7y � 3•� ACH (50) CFM (50) Building Volume Method for Calculating building volume: aPASS o%trieved from architectural plans o Co-"e software calculated o Field measured and calculated During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infilitration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continous ventilation systems and heat recovery ventilatiors shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the tst, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Accurate Insulation Phone: 970-296-0041 Signature of Tester;.-_ , Printed Name of Tester: Rich Romero Issuing Authority: Building Performance Institute Date of Test: .3j 2 /-1i 7 License/Certification: 5072554