ONSITE WASTEWATER TREATMENT SYSTEM DESIGN
PROPOSED RESIDENCE
TBD MAMM CREEK ROAD
GARFIELD COUNTY, COLORADO
PROJECT NO. 25-7-508.02
DECEMBER 10, 2025
PREPARED FOR:
TORREY & SONS, LLC
ATTN: TORREY BYMAN
854 ANTLER POINT LANE
SILT, COLORADO 81652
torreybyman(c_outlook.com
TABLE OF CONTENTS
INTRODUCTION.................................................................................................................... 1 -
PROPOSED CONSTRUCTION.............................................................................................- 1 -
SITECONDITIONS............................................................................................................... - 1 -
SUBSURFACECONDITIONS............................................................................................... - 1 -
OWTSANALYSIS.................................................................................................................. - 2-
DESIGNRECOMMENDATIONS........................................................................................... - 2-
SOILTREATMENT AREA............................................................................................. - 2-
OWTSCOMPONENTS................................................................................................. - 3-
OWTS OPERATION AND MAINTENANCE........................................................................... - 5 -
OWTSHOUSEHOLD OPERATION.............................................................................. - 5-
OWTSMAINTENANCE................................................................................................. - 6-
OWTS CONSTRUCTION OBSERVATION............................................................................ - 6-
LIMITATIONS........................................................................................................................ - 6 -
FIGURES
FIGURE 1 - OWTS SITE PLAN
FIGURE 2 - SOIL TREATMENT AREA CALCULATIONS
FIGURE 3 - SOIL TREATMENT AREA PLAN VIEW
FIGURE 4 - SOIL TREATMENT AREA CROSS-SECTION
ATTACHMENTS
VALLEY PRECAST 1,500 GALLON, TWO -COMPARTMENT SEPTIC TANK DETAIL
POLYLOK DISTRIBUTION BOX
Kumar & Associates, Inc. ® Project No. 25-7-508.02
INTRODUCTION
This report provides the results of a design for an onsite wastewater treatment system (OWTS)
for the proposed residence to be located at TBD Mamm Creek Road (County Road 315), Parcel
240108100200, Garfield County, Colorado. The project site is shown on Figure 1. The purpose
of the report is to provide design details for the OWTS in accordance with Garfield County
Environmental Health Department Onsite Wastewater Treatment System Regulations and the
Colorado Department of Public Health and Environmental Regulation #43. The services are in
accordance with our agreement for professional services to Torrey & Sons, LLC dated August 4,
2025.
PROPOSED CONSTRUCTION
The proposed residence will be a one to two story structure with an attached garage located on
the parcel as shown on Figure 1. The residence will have four bedrooms and the OWTS will be
designed for four bedrooms. The proposed soil treatment area (STA) for the OWTS will be located
southwest of the residence. Water service will be provided by an onsite well far from the residence
and OWTS. The route of the water supply line has not been designed at the time of this report
on Figure 1.
If proposed construction is different than that described, we should be contacted to re-evaluate
our design recommendations.
SITE CONDITIONS
The parcel is located west/northwest of Mamm Creek and Mamm Creek Road just south of County
Road 322. The site, shown on Figure 1, was vacant at the time of field exploration. The terrain
in the building area is gently sloping down to the south and west towards West Mamm Creek.
West Mamm Creek is approximately 70 feet southeast of the proposed STA. Vegetation consists
of grass, sagebrush, weeds and pinon and juniper trees.
SUBSURFACE CONDITIONS
The field exploration for the OWTS was conducted on August 28, 2025. Two profile pits were
excavated with a mini -excavator at the approximate locations shown on Figure 1 to evaluate the
subsurface conditions at the soil treatment area for the OWTS. The pits were logged by a
representative of Kumar & Associates. The logs of the profile pits are provided below.
Log of Profile Pit 1
depth I USDA Classification
0' '/2' TOPSOIL; organic Loam, firm, moist, dark brown.
%i-8' SANDY LOAM; moderate blocky structure, medium dense, slightly moist to moist, brown.
• Disturbed bulk sample obtained from 4 to 5 feet.
• Bottom of pit @ 8 feet depth.
• No groundwater or redoximorphic features observed at the time of pit excavation.
Kumar & Associates, Inc. 0 Project No. 25-7-508.02
-2-
Log of Profile Pit 2
0' '/2' TOPSOIL; organic Sandy Loam, firm, moist, brown.
'/,'-8' SANDY LOAM; moderate blocky structure, medium dense, slightly moist to moist, brown.
• Bottom of pit @ 8 feet depth.
• No groundwater or redoximorphic features observed at the time of pit excavation.
The soils encountered in the profile pits, below about '/z foot of organic topsoil, consisted of Sandy
Loam down to the pit depths of 8 feet. No free water was encountered in the pits nor indications
of seasonal high groundwater were observed at the time of the pit excavations.
Based on the subsurface conditions and laboratory testing, the design soils have been classified
as Type 2 per State regulations, which equates to a long-term acceptance rate (LTAR) of 0.60
gallons per square foot per day.
OWTS ANALYSIS
Based on the site conditions and profile pit evaluation, the evaluated area should be suitable for
a conventional infiltration disposal system. There is adequate elevation difference from the septic
tank to the STA for gravity flow. The STA will consist of chambers in a trench configuration based
in the Loam soils. The STA will be sized for four bedrooms and seven persons and an average
daily flow of 75 gallons per person, and an LTAR of 0.60 gallons per square foot per day in the
natural soils.
The effluent will gravity flow from the residence to the septic tank for primary treatment and then
gravity flow from the septic tank to the STA for dispersal and final treatment. The STA will consist
of three trenches with Infiltrator Quick 4 Plus Standard chambers. Equal distribution will be
provided to the chambers by a distribution box.
The route of the water supply line should be outside of any required setbacks. The required
setback of the water line from the septic tank is 10 feet, 5 feet for sewer and effluent lines, and 25
feet from the STA. We should be notified for additional recommendations if any of the setbacks
cannot be met.
DESIGN RECOMMENDATIONS
The design recommendations presented below are based on the proposed construction, the site
and subsurface conditions encountered, and our experience in the area. A layout of the proposed
OWTS components is provided on Figure 1. If conditions encountered during construction are
different than those that are described in this report, we should be contacted to re-evaluate our
design recommendations.
SOIL TREATMENT AREA
• The STA will consist of the three trenches with 18 Infiltrator Quick4 Plus Standard
chambers placed in each trench (54 chambers total) based in the natural soils. Equal
distribution will be provided to the trenches by a distribution box.
• The STA was sized based on an LTAR of 0.60 gallons per square foot per day.
Kumar & Associates, Inc. 0 Project No. 25-7-508.02
-3-
Each chamber was allowed 12 square feet of area. A 30% reduction for use of Infiltrator
chambers in a trench configuration were applied to the size of the STA. The total STA
design size is 648 square feet. Soil treatment area calculations are shown on Figure 2.
• A minimum of four feet of undisturbed soil between the trenches is required.
• Trenches should be cut a maximum of 4 feet deep at the up -slope side.
• The trenches should be oriented along ground contours to minimize soil cut and cover.
• The base and sidewalls of the trench excavations should be scarified prior to the chamber
placement.
• A minimum of 12 inches and a maximum of 36 inches of cover soil should be placed over
the chambers.
• Backfill should be graded to deflect surface water away from the STA and should be
sloped at 3 horizontal to 1 vertical or flatter. A swale to divert surface water flow away
from the STA may be needed upslope of the STA.
• Disturbed soil should be re -vegetated as soon as possible with a native grass mix. No
trees, shrubs or other plants with deep roots should be planted on or near the STA as this
may damage the system piping.
• Four -inch diameter inspection ports should be installed vertically into the knockouts
provided in the chamber end caps. Install ports at each end of the trench. The inspection
port piping should be screwed into the top to the chambers and should not extend down
to the ground surface inside the chambers. The inspection ports should extend at least 8
inches above the finished ground surface or be protected in a valve box at finished grade.
• Care should be taken to ensure that the STA is not driven before and after construction.
• The STA must be a minimum of 20 feet from the residence.
• The STA must be a minimum of 50 feet from the creek.
• The STA must be a minimum of 5 feet from the septic tank.
• The STA must be a minimum of 10 feet from the property lines.
• The STA must be a minimum of 25 feet from potable water supply lines.
• A plan view of the STA is presented on Figure 3 and a cross section of the STA is
presented on Figure 4.
OWTS COMPONENTS
Recommended OWTS components provided below are based on our design details and our
experience with the specific component manufacturers. Equivalent components may be feasible
but need to be approved by us prior to construction.
Septic Tank
• A Valley Precast 1,500 gallon, two -chamber septic tank should be used for primary
treatment. A detail of the tank is provided as an attachment.
• An effluent filter should be installed in the tank outlet tee.
• The tank must be a minimum of 5 feet from the residence.
• The tank must be a minimum of 10 feet from potable water supply.
• The tank must be a minimum of 5 feet from the STA.
• The tank must be a minimum of 50 feet from the creek.
• The tank must be set level. The excavation bottom must be free of large rocks or other
objects that could damage the tank during placement. A road base or gravel bedding
material may be needed to prevent tank damage during placement and act as a leveling
course.
Kumar & Associates, Inc. 0 Project No. 25-7-508.02
• The tank lids must extend to final surface grade and made to be easily located.
• Install the tanks with 2 feet minimum cover soil for frost protection. Maximum tank soil
cover is 4 feet.
Sewer Pipe
• The sewer line to the septic tank should not be less than the diameter of the building or
other drains and not less than 4 inches in diameter.
• The sewer pipe should have a rating of SDR35 or stronger. Schedule 40 PVC pipe is
required beneath any driveway or gravel surfaces.
• The sewer pipe should be sloped between 2% to 4% to help limit disturbance of solids in
the tank and potential sewage bypass of the first chamber of the tank. If a steeper slope
is needed, this can be accomplished with vertical step-downs in the sewer line.
• A minimum 36 inches of cover soil should be provided over the sewer pipe. Paved or
graveled areas, patios or other areas without vegetative cover may be more susceptible
to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas,
and the pipe be insulated on top and sides with 2-inch-thick blue foam insulation board. If
adequate soil cover is not possible, we should be contacted for re-evaluation prior to
installation.
• The sewer pipe should be bedded in compacted 3/4-inch road base or native soils provided
that the native soils contain no angular rocks or rocks larger than 2'/2 inches in diameter
to help prevent settlement of the pipe. Sags in the pipe could cause standing effluent to
freeze and damage the piping.
• Install cleanout pipes within 5 feet of the building foundation, where the sewer pipe bends
90 degrees or more and every 100 feet of sewer pipe.
• All 90-degree bends should be installed using a 90-degree long -sweep or by using two
45-degree elbows.
• The sewer line must be a minimum of 5 feet from any potable water supply lines.
• The sewer line must be a minimum of 50 feet from the creek.
• The sewer line location shown on Figure 1 is considered conceptual. We assume that
there will be only one sewer line exiting the residence. It is the responsibility of the
owner/contractors to locate all sewer line exit locations and connections to the septic tank.
We should be notified if there are other sewer lines exiting the building.
Effluent Transport Piping
• The effluent transport pipe should be 4-inch diameter SDR35 piping sloped at a 2%
minimum to flow from the septic tank to the distribution box and from the distribution box
to each trench. Piping should extend at least 6 inches into the top knockout provided in
the Infiltrator end caps and be screwed in place. Splash plates should be installed beneath
the inlet piping to help limit scouring of the infiltrative soil surface in the chambers.
• Schedule 40 PVC pipe is required below driveway or gravel surfaces.
• The effluent transport pipe should be bedded in compacted %-inch road base or native
soils provided that the native soils contain no angular rocks or rocks larger than 2'/z inches
in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing
effluent to freeze and damage to the piping.
• A minimum 18 inches of cover soil should be provided over the effluent transport pipe.
Paved areas, patios or other areas without vegetative cover may be more susceptible to
frost. We recommend 48 inches of soil cover over the effluent pipe and insulation with at
Kumar & Associates, Inc. ° Project No. 25-7-508.02
-5-
least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible,
we should re-evaluate the condition prior to installation.
• All 90-degree bends should be installed using a 90 degree long -sweep or by using two
45-degree elbows.
Distribution Box
• The distribution box will be used to equally divide effluent flow between the trenches. We
recommend the Polylok 6-hole distribution box since it is easily accessible from ground
surface for maintenance. A copy of the distribution box detail is provided as an attachment
to this report.
• The distribution box outlet pipes should be equipped with flow equalizers for ease of initial
setup and adjustment over time.
• The distribution box should be a minimum of 18 inches below grade with risers and an
access lid at or above grade.
• The distribution box must be accessible from ground surface for inspection and
maintenance per the State guidelines.
• The effluent line from the septic tank should be directed downward into the distribution
box with a 90-degree elbow inside the box.
• The distribution box must be installed level on a compacted road base subgrade to ensure
equal effluent distribution. If settlement of the distribution box occurs, unequal effluent
distribution may take place which could cause hydraulic overload of one of the trenches
and potential failure. The distribution box should be monitored periodically, and the speed
levelers should be adjusted as necessary for levelling.
• The ground surface above and around the distribution box should be graded to drain away
surface water to prevent standing water near the distribution box which could freeze or
cause settlement.
OWTS OPERATION AND MAINTENANCE
The OWTS will require periodic inspection and maintenance to function properly. A properly
designed, installed and maintained system can greatly increase its lifespan. The level of
maintenance will vary depending on the complexity of the system and water use habits of the
residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be
developed. Below are some basic recommendations for the OWTS O&M.
OWTS HOUSEHOLD OPERATION
• Use of high efficiency water fixtures is recommended to decrease the hydraulic load on
the OWTS system.
• Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil
absorption system.
• Do not irrigate the area on top of or directly upgradient of the soil absorption field as this
may cause a hydraulic overload.
• Do not dispose of household waste down drains as this may clog or damage OWTS
components. Examples of household waste includes: dental floss, cotton swabs, coffee
grounds, paper towels, feminine products and many other kitchen and bath items.
• Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized,
kitchen wastewater should be screened thoroughly. Many kitchen solids are not
decomposed in the septic tank and may cause increased tank pumping frequency.
Kumar & Associates, Inc. 0 Project No. 25-7-508.02
sm
Do not dispose of household chemicals, greases, oils, paints, hot tub water or water
softener backwash in household drains. A separate drywell, if feasible, may be necessary
for hot tub water or water softener backwash disposal.
Limit the use of bleach as this may harm useful bacteria in the septic tank and soil
absorption system.
Liquid dishwasher and clothes washer detergent is recommended for households served
by an OWTS. Clay substances used as fillers in powder detergents may result in clogging
of the soils absorption system.
OWTS MAINTENANCE
• Inspect the septic tank, effluent filter, distribution box, and STA at least annually for
problems or signs of failure.
• The effluent filter should be cleaned at least annually by spray washing solids into the first
chamber of the septic tank.
• The septic tank should be pumped and cleaned every 3 to 5 years depending on use.
Longer pumping intervals may increase the amount of solids that reach the STA, which
may shorten its life span.
• Pumping of the septic tank should take place when the level of the sludge and scum layers
combined take up 25 to 33% of the capacity of the first chamber of the tank.
OWTS CONSTRUCTION OBSERVATION
The Garfield County Environmental Health Department requires that the designer of the system
provide a record drawing and certification of the OWTS construction (As -Built inspection). We
should be provided with at least 48-hour notice prior to the installer needing the inspections. Prior
to issuance of our certification letter, we require observation of all system components prior to
backfill. The number of site visits required for the inspection will depend on the installer's
construction schedule.
LIMITATIONS
We have conducted this design in accordance with generally accepted engineering principles and
practices in this area at this time. We make no warranty either expressed or implied. The
recommendations provided in this report are based on the site conditions, profile pit evaluations
and soil texture analysis, the proposed construction and our experience in the area. Variations
in the subsurface conditions may not become evident until excavation is performed. If conditions
encountered during construction appear different from those described in this report, we should
be notified so that re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We are
not responsible for technical interpretations by others of our information. As the project evolves,
we should provide continued consultation and field services during construction to review and
monitor the implementation of our recommendations, and to verify that the recommendations
have been appropriately interpreted. Significant design changes may require additional analysis
or modifications to our design.
It is our opinion that the designed location of the OWTS components does not violate any setback
requirements of the Garfield County Regulations. Below is a table of common minimum horizontal
setbacks to OWTS components. Refer to the Garfield County Regulations for a complete list of
Kumar & Associates, Inc. 0 Project No. 25-7-508.02
-7-
required setbacks. We recommend the OWTS components be surveyed by a Professional
Colorado Land Surveyor for the installation layout.
Ttakin 1 _ Cnmmrnn Minimum 14nri7nntn1 Sathackc frnm AUUTS CmmnnnPnfc
Water
Occupied
Lined
Lake,
Irrigation
Dry
Septic
Wells
Supply
Dwelling
Ditch
Ditch,
Ditch or
Tank
Line
Stream
Gulch
STA
100,
25'
20'
_
10,
50,
25'
5'
Septic Tank 50'
10,
5'
10,
50,
10,
-
-
Building Sewer 50'
S'
0' 10'
50,
10'
Please contact us for any necessary revisions or discussion after review of this report by Garfield
County. If you have any questions, or if we may be of further assistance, please let us know.
Respectfully Submitted,
Kumar & Associates, Inc.
Shane M. Mello, Staff
Reviewed by:
David A. Young, P.E.
SMM/kac
=, 41216
h�
'�1�lIIAL
Kumar & Associates, Inc. ® Project No. 25-7-508.02
i p1ap
PRC
VALLEY Pf
1'50❑_{
TWO -CH
SEPTIC TANK
PROPOSED
POLYLOK 6-HOLE
DISTRIBUTION BOX
PROPOSED SOIL TREATMENT
AREA (STA) CONSISTING OF
THREE ROWS OF 18
INFILTRATOR QUICK PLUS 4''` PROFILE
STANDARD CHAMBERS (64 PIT 1
CHAMBERS TOTAL). ■
1
_ r
PROFILE I
PIT 2
50' SETBACK
°�_ /• T❑ STA FROM
f CREEK
PROPOSED
4-BEDROOM
RESIDENCE
k
� 1
ti
25 0 25 50
SCALE -FEET
r25-7-508.02 Kumar & Associates QWTS SITE PLAN Fig. 1
OWTS SOIL TREATMENT AREA CALCULATIONS
In accordance with the Garfield County OWTS Regulations and the Colorado Department of
Public Health and Environment's Regulation #43, the soil treatment area was calculated as follows:
CALCULATION OF OWTS DESIGN FLOW:
Q = (F)(N)
WHERE:
Q = DESIGN FLOW
F = AVERAGE FLOW PER PERSON PER DAY
B = NUMBER OF BEDROOMS
N = TOTAL NUMBER OF PERSONS; 2 PERSONS PER BEDROOM IN FIRST 3 BEDROOMS
AND 1 PERSON PER EACH ADDITIONAL BEDROOM
PROPOSED RESIDENCE:
F=
B=
N=
Q=
CALCULATION OF OWTS SOIL TREATMENT AREA:
MINIUMUM TREATMENT AREA = Q _ LTAR
WHERE:
Q=
LTAR (SOIL TYPE 2) _
MINIMUM SOIL TREATMENT AREA =
REDUCTION FACTOR FOR CHAMBERS =
MINIMUM SOIL TREATMENT AREA WITH REDUCTION =
AREA PER INFILTRATOR QUICK 4 STANDARD CHAMBER =
TOTAL CHAMBERS NEEDED =
NUMBER OF TRENCHES =
CHAMBERS PER TRENCH =
TOTAL NUMBER OF CHAMBERS AS DESIGNED =
TOTAL SOIL TREATMENT AREA =
75 GALLONS PER DAY
4 BEDROOMS
7 PERSONS
525 GALLONS PER DAY
525 GALLONS PER DAY
0.6 GALLONS/FT2/DAY
875.0 SQUARE FEET
0.70
613 SQUARE FEET
12 SQUARE FEET
52 CHAMBERS
3
18 CHAMBERS
54 CHAMBERS
648 SQUARE FEET
25-7-508.02 1 Kumar & Associates I SOIL TREATMENT AREA CALCULATIONS I Fig. 2
TRANSPORT PIPING
SHOULD BE INSERTED
AT LEAST 6 INCHES
INTO THE UPPER
KNOCKOUT IN THE END
CAP. INSTALL SPLASH
PLATES BENEATH INLET
PIPING TO HELP LIMIT
SCOURING OF THE
INFILTRATIVE SURFACE.
INFILTRATOR QUICK4 PLUS
STANDARD CHAMBERS IN 3
TRENCHES. 18 CHAMBERS
PER TRENCH (54 TOTAL).
INFILTRATOR QUICK
4 PLUS STANDARD
END CAP.
SCALE —FEET
4 INCH DIAMETER
NON —PERFORATED
SDR35 TRANSPORT
PIPE SLOPED AT A
2% MIN. DOWN TO
TRENCH.
POLYLOK
6—HOLE
DISTRIBUTION
BOX
4 INCH DIAMETER
NON —PERFORATED
SDR35 TRANSPORT
PIPE SLOPED AT A
2% MIN. DOWN TO
DISTRIBUTION BOX.
VCH DIAMETER PVC
ERVATION PORTS
ALLED VERTICALLY INTO
KNOCKOUTS PROVIDED IN
END CAPS. INSTALL PORTS
AT EACH END OF EACH
TRENCH. REMOVABLE LID TO
BE PLACED ON TOP OF PIPE.
PIPE MUST STICK UP AT
LEAST 8 INCHES ABOVE
�f FINISHED GRADE OR BE
PLACED AT GRADE IN AN
ACCESSIBLE VALVE BOX.
PIPES SHOULD NOT EXTEND
TO SOIL SURFACE AND
SHOULD BE SECURED TO
CHAMBER WITH SCREWS OR
COUPLINGS TO PREVENT
SLIDING DOWNWARD.
Notes:
1. Chambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if
necessary.
2. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of
trench excavations should be scarified prior to chamber installation.
3. All piping should have a rating of SDR35 or stronger.
4. Changes to this design should not be made without consultation and approval by Kumar & Associates.
5. Refer to the Garfield County Onsite Wastewater System Regulations for other applicable specifications.
125-7-508.021 Kumar & Associates I SOIL TREATMENT AREA PLAN VIEW Fig. 3
EXCAVATE 36"
WIDE TRENCH
12" MIN./36" MAX.
COVER SOIL GRADED —
TO DEFLECT
SURFACE WATER j
INFILTRATOR QUICK4
PLUS STANDARD
CHAMBER INSTALLED
LEVEL
1
EX
APPROX. ISTING
- — GROUND SURFACE
-- -- — __ - --- _ — 4' MIN. — _-
- UNDISTURBED-
- — — SOIL BETWEEN-
TRENCH£5.
-- _- NATIVE SOIL -. - -- SCARIFY GROUND = _
- SURFACE PRIOR TO - — -
_ — - CHAMBER PLACEMENT -
Notes:
1. Chambers should be installed level on a scarified ground surface. Concrete
sand may be used as a leveling course if necessary.
2. Care should be taken by the contractor to avoid compaction of the native soils in
the trench areas. The base and side walls of trench excavations should be
scarified prior to chamber installation.
3. Changes to this design should not be made without consultation and approval
by Kumar & Associates.
SCALE -FEET
25-7-508.021 Kumar & Associates I SOIL TREATMENT AREA CROSS—SECTION I Fig. 4
Item 0 1500 Gallon Top Seam - 2CP
150OT-2GP
DESIGN NOTES
• Design per performance test per ASTM
C1227
■ Top surface area 62.33 ft2
■ f'c ® 28 days; concrete = 6,000 PSI
Min.
Installation--
• Tank to be set on 5" min. sand bed or
pea gravel
• Tank to be backfilled uniformly on all
sides in lifts less than 24" and
mechanically compacted
■ Excavated material may be used for
backfill, provided large stones are
removed
• Excavation should be dewatered and
tank filled with water prior to being put
in service for installation with water
table less than 2' below grade
• Meets C1644-06 for resilient connectors
■ Inlet and Outlet identified above pip
■ Delivered complete with internal pipi
■ 4' Maximum bury depth
ALLOWABLE BURY
(Based on Water Table)
WATER TABLE
ALLOWABLE
EARTH FILL
0'-0"
3'-0"
1'-0"
3'-0"
2'-0"
4' 0"
3'-0"
4' 0"
DRY
4' — 0"
Digging Specs Invert
13' Long x 8' Wide Inlet Outlet Lengt
56" below inlet 56" 53" 132"
32° - Top
View
2W awr Acem
.•I TANK
1 ID
ier
3M
2S"
Section
View
h
Dimensions Net Capacity Net Weight
Width Height Inlet -Side- Outlet Total Lid Tank Total
68" 68" 1002 gal 507 gal 1509 gal 3600 Ibs 11180 Ibs 14780 Ibs
a VALLEY
❑ ,PRECAST, Inc.
Buena Vista, Colorado
Phone: 719-395-8764
Fax: 719-395-3727
Webolte: www.valleypmeasto m
Enadl: fronWesk@valleyprlx=Lcom
Polylok Distribution Box
Risers and Lid
UD-BOX 6 & UD-BOX 8
• 1�in�~I 1��1 � •
WIN
all
'� 1 . � •
`I�iili�ll� • "
ACCESS TO GRADE
REQUIRED
UD-BOX 6" RISE
UD10OX 72" Rf���
20" COVER FOR RISER & D-BOX
o ALLEY
Q ,,PRECAST, Inc,
Buena Vista, Colorado
D-BOX SEAL
WERynCONE@wrrm
4 !FALL)
{
TEAR OUT FOR
4" SDR-35 OR
SCHD-4O
NOT TO SCALE
REQUIRED
ROTO-FLOW 4"
LOT TO SCALE
OR
REQUIRED
POLYLOCK EQUALIZER
'V-NOTCHR WEER
WEIR SHAPE IS
SELF LEVEUNO
RIBS PROVIDE FR=
FIT FOR ALL 4' PIPE ID
NOT TO SCALE
GASKETED SEAL ON
LID & RISER
Phone: 719-395-6764
Fax: 719-395-3727
Webske: www.valleypmeasLoom
Email: fronWesk c@valleypnecasLoom