HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLMF-03-26-9707
DELGATO/SERGIO
PRE -FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE
7979 HIGHWAY 13 - parcel #212915200069
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE.
(2018 IECC'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR
MANUFACTURED HOME TYPE --
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1) FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH
2015 I.R.C., 2018 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
MANUFACTURER'S INSTALLATION REQUIREMENTS.
3) WILDFIRE MITIGATION RECOMMENDATIONS_: SHOULD COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST
SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY
COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION.
4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
5) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH -IN APPROVAL, ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL
INSPECTION & CERT. OF OCCUPANCY.
6) PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE
BUILDING INSPECTOR WITH FINAL APPROVAL/ SIGN -OFF FROM GARFIELD COUNTY'S
PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON -SITE WASTEWATER
TREATMENT SYSTEM.
7) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2500 PSF, 2' OF STRUCTURAL FILL REQUIRED. VERIFY 36
INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT
REQUIRED AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD
COPY.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
8) *NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
9) INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
10) LOCATE ALL UTILITIES PRIOR TO ANY WORK. 811 IS THE STATE UTILITY LOCATE NUMBER
11) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS
AND SEEDS.
12) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.
13) MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERTY, DRAINAGE SHALL NOT ENTER
NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE.