Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-03-26-9709 SUNLIGHT VALLEY HOLDINGS LLC PRE -FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE 5810 COUNTY ROAD 320 - parcel #217526200195 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. (2018 IECC'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR MANUFACTURED HOME TYPE -- AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY) 1) FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2015 I.R.C., 2018 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD.COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH -IN APPROVAL, ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 6) PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN -OFF FROM GARFIELD COUNTY'S PUBLIC HE/�LTH DEPARTMENT FOR INSTALLATION OF THE ON -SITE WASTEWATER TREATMENT SYSTEM. 7) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2000 PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT REQUIRED AT FIRST FOOTING INSPECTION. B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* 8) *NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 9) INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK. 10) LOCATE ALL UTILITIES PRIOR TO ANY WORK. 811 IS THE STATE UTILITY LOCATE NUMBER 11) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. 12) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION. 13) MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERTY, DRAINAGE SHALL NOT ENTER NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE.