Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanK-CRONK P.o. Bo,o wack, co 8,;,, 970-250.0572 / kcuha}iIn.crrnik@ourlook.com Onsite Wastewater Treatment System Design March I8, 2025 Golden Project 439 Westbank Road Glenwood Springs, CO 8I60I Parcel No. 2395-02I-2-009 Lot 9 of Westbank Ranch Subdivision #2 Prepared By: K-Cronk Engineering, Inc. P.O. Box 140 Mack, CO 8I525 970-250-0572 Site History There is an existing four -bedroom residence on the site that is served by an existing onsite wastewater treatment system (OWTS). The existing septic tank is partially underneath a garage that was previously added on to the residence. The new owner of the property would like to replace the existing system with a modern one that is designed to accommodate a four -bedroom residential loading. The site consists of approximately 1.06 acres of cultivated native soil. Drainage is approximately 3% to the north. A soils evaluation and site study were conducted on the property of reference on 03/05/25 by Kachayla R. Cronka. Soils evaluation trench A was located approximately 65' north of the south property line and approximately 25' east of the west property line. This OWTS design has been prepared for the project based on information disclosed during the site study mentioned above. A discussion of the engineered OWTS design follows. The locations of the soil evaluation trenches are shown on the Plot Plan included in this report. Development of Design Parameters Soils evaluation trench A was extended to a depth of 96" below ground surface (BGS). There was no ground water or evidence of periodically saturated soils observed to a depth of 96" BGS. There was also no limiting layer identified to a depth of 96" BGS. The soils evaluation indicates two distinct soil horizons underlie the site. A lithological description follows: depth in. description 0" — 12" sandy loam w/ organics, brown (Soil Type 2, USDA — sandy loam, granular, moderate structure) 12" — 96" sandy loam, brown (Soil Type 2, USDA — sandy loam, blocky, moderate structure) Soils evaluation trench B was extended to a depth of 48" below ground surface (BGS). The soils lithology matched that described for Trench A above. Based on the results from the 03/05/25 soils evaluation, Soil Type 2 and the corresponding long term acceptance rate (LTAR) of 0.60 are chosen for overall system sizing for a pressurized infiltrator trench soil treatment area design to discharge to subsoils below the 24" depth. a Kachayla R. Cronk holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile Evaluation of Soils Training. Svstem Design A pressurized INFILTRATOR trench soil treatment system is proposed for discharge of septic effluent at the site. Construction of the system will consist of excavating level trenches in the area comprising the soil treatment area. Gradin during construction may affect sloe therefore contractor shall verify slope at time of installation. Soil treatment area orientation may be ad'usted per site variations to facilitate consistent trench depth runnin arallel to final contours. The initial excavation shall be continued to a level depth of 24" BGS (see Soil Treatment Area Cross Section). If consistent trench depth cannot be maintained INFILMTOR chambers may be installed level at 24" minimum and 48" maximum BGS. After removal of surface soils, the open excavations will be disked or scarified to promote subsurface absorption. A lift station will be employed to discharge septic effluent into the soil treatment area. Following completion of the initial excavation, INFILTRATORS (QUICK4 STANDARD or equivalent) will be used to construct a septic effluent distribution system. The INFILTRATOR effluent distribution system will be installed in accordance with the "Infiltrator Technical Manual", available from Infiltrator Systems Inc., 123 Elm Street, Suite 12, Old Saybrook, Connecticut 06475. Adjacent INFILTRATORS sbaIl be fastened with a miniminn of three 3 3/a" self -tapping screws to prevent movement and separation durin backfilling. After the INFILTRATORS are installed, synthetic filter fabric (140-200 mesh) will be placed over the INFILTRATORS and the system will be covered with a soil cap. The soil cap will consist of approximately 12" minimum of native soil backfill. The soil cap will be mounded 5% above the existing ground surface to promote surface run off away from the soil treatment area. Septic effluent will be introduced into the soil treatment area through pressurized distribution laterals installed in each row of INFILTRATORS as shown in the included graphics. The injection laterals will consist of 1-1/2" Schd 40 PVC pipe with 5/32" holes equally spaced 36" o.c. along each row of INFILTRATORS. Holes in the injection laterals will be drilled at 12:00 o'clock to direct effluent up for dispersal against the top of the chamber. Injection laterals shall be suspended from the top of the chamber with all-weather plastic pipe strapping (min. 120 lbs tensile strength) at every chamber joint connection. Septic effluent will be delivered to the distribution laterals through a 2" (Schd 40 PVC) pressure manifold. The pressure manifold will be centrally located in the soil treatment area (see attached soil treatment area plan view). There is an existing tank on the site that has been used for sewage storage. The tank will be removed or abandoned in place and replaced with a new tank described below. Abandonment shall consist of pumping the tank of all solids and crushing the top and sides in before filling all void space with structural fill. A 1,250 gallon, two compartment septic tank is required to provide a minimum of 48 hours retention time for sewage generated from the proposed project. A 500-gallon, single compartment pump chamber will be placed down -gradient of the 1,250 gallon tank. Alternatively, a 1,500 gallon, concrete, two -compartment septic tank may be used without the pump chamber. The tanks must be approved and accepted by CDPHE for use as a septic tank. A list of such tanks may be found here: httns://c(li)he.colorado.gov/OW"I'S under "Regulation 43: product acceptance lists". Provide water -tight risers to surface with securely fitted lids for access to all compartments of the septic tank. If applicable, a non -corrodible Orenco filter (model # FTW0436-28) shall be installed at the final outlet tee of the two -compartment septic tank to limit the size of solids and sludge passing into the pump chamber. The filter must be accessible for cleaning and replacement from the ground surface. A screened effluent pump will be placed in the pump chamber. The 2 effluent pump system will employ an OSI high head, non -clog (3/4" solids handling capability), effluent pump (OSI model no. PF500511) and screened pumping vault (OSI model no. PVU57-1819-L). A 2" Schd 40 PVC pressure transport line will be used to transfer septic effluent from the pumping system to the STA. The pressure main will be self -draining or be buried a minimum of 36" below ground surface to prevent freezing. All pressure piping and construction shall be completed in accordance with the attached graphics. As shown in the included graphics, the trench soil treatment system will consist of three (3) trenches 3' wide x 24" deep x 56' long with fourteen (14) INFILTRATOR (or equivalent) units each for a total of forty- two (42) units. The soil treatment area will encompass an area of 504 sq. ft. DESIGN CALCULATIONS DESIGN LOADING RATE OF 3 BEDROOMS @ 150 GAL./BEDROOM-DAY = 450 gal./day PLUS 4"' BEDROOM @ 75 GAL./BEDROOM-DAY = 525 gal./day DESIGN LONG TERM ACCEPTANCE RATE (LTAR) = 0.60 GAL./SQ.FT./DAY A LTAR'WHERE, A = SOIL TREATMENT AREA (SQ. FT.) Q= DESIGN FLOW (GAL./DAY) LTAR = LONG TERM ACCEPTANCE RATE (GAL./SQ.FT./DAY) A = � - = 875 SQ. FT. SOIL TREATMENT AREA ADJUSTMENT FACTOR FOR PRESSURE TRENCH DESIGN = 0.8 SOIL TREATMENT AREA ADJUSTMENT FACTOR FOR USE OF CHAMBERS = 0.7 ADJUSTED SOIL TREATMENT AREA = 875 SQ.FT. X 0.8 X 0.7 = 490 SQ. FT. LENGTH OF 3' WIDE TRENCH REQ'D = 490 SQ.FT. / 3 FT. = 163.33 FT. USE 3 TRENCHES WITH 14 QUICK4 STANDARD INFILTRATORS (or equivalent) EACH, FOR A TOTAL OF 42 UNITS SOIL TREATMENT AREA SIZED AT 3 TRENCHES 3 FT. WIDE X 56 FT LONG = 504 SQ. FT. Installation - Setbacks. Notifications. and [ns ections The owner and installer shall be aware of and comply with the following installation and system operation requirements. The installer must be approved and licensed by Garfield County for installation of onsite wastewater treatment systems. Ali installation activities shall be conducted in accordance with current Garfield County OPPYS Re idalrans. If at any time during construction. subsurface site conditions are encountered which differ from the design parameters previously described. construction activities will stop, and the desi&nengineer and Garfield County will be contacted to address any necessary design modifications. s. The final cover shall not be placed on sewer lines, septic tank, or the soil treatment area until the system has been inspected and approved by the design engineer and Garfield County. The installer shall provide 48-hour notice for all required inspections. Installation procedures including grade, location, setbacks, septic tank size, and soil treatment size shall conform with the attached graphic details. Construction activities and system components will not encroach upon existing easements or utility corridors. A minimum of 5 ft of undisturbed soil shall be maintained between individual absorption elements and the septic tank. A minimum of 4' of undisturbed soil shall be maintained between adjacent absorption elements. ■ The installer must maintain all setbacks to utility lines, easements, property lines, or other adverse conditions, whether they are known and shown on the attached graphics or have been disclosed during construction. Vehicle traffic and parking is to be prevented over the soil treatment and repair area. Minimum setbacks for system components are: Septic Tank, Dosing Tank Building Sewer, Effluent Lines STA spring/well/cistern 50 50 100 potable water supply line 10 5 25 structure w/ crawls ace 5 0 20 structure w/o crawls ace 5 0 10 property lines, piped or lined irrigation 10 10 10 subsurface drain, intermittent irrigation 10 10 25 lake, water course, irri ation ditch, stream 50 50 50 cut slope steeper than 3H:1 V 10 10 25 septic tank -- -- 5 • Four -inch, 2-way clean out must be installed within 5' of the outside of the building. All gravity flow sewer lines and effluent distribution piping shall be 4 inches in diameter and have glued joints. All lines discharging sewage from the residence to the septic tank shall maintain a minimum fall of 1 /8 in. per foot and shall employ sweep 90's or 2-45's at all turns. All unperforated pipe used for gravity flow of effluent, including pipe from the foundation to the septic tank, must meet minimum standard ASTM-3034. Lines discharging from the septic tank to the soil treatment area shall maintain a minimum fall of 1/8 in. per foot. Sewer lines 4 under driveways shall meet the minimum Schedule 40 PVC standards. Additionally, effluent piping in traffic areas with less than 24" of cover shall be encased in 6" CMP or flow fill and covered with minimum 2" high density blue board insulation. • Sewer lines or domestic water lines shall be encased in minimum SCHD 40 with water -tight end caps or a minimum of 6" of flow fill at all points with less than 5' separation between sewer and domestic water lines. • Four -inch clean outs shall be installed at maximum 100' intervals in all gravity flow effluent lines exceeding 100' in length. + A minimum of 12" of soil cover (18" recommended) shall be maintained over all gravity draining OWTS components to prevent freezing of septic effluent (excepting septic tank access ports which must be extended to the ground surface). • A minimum of 36" of soil cover shall be maintained over all non -draining pressure effluent line. ■ The septic effluent pumping system shall consist of OSI components (OSI, non -clog (3/4" solids handling capability) effluent pump model no. PF500511 and OSI screened pumping vault model no. PVU57-1819-L) as detailed in the attached effluent pumping system detail. The effluent pump control panel shall be Orenco model no. SIETM. Electrical wiring shall be continuous cable with all connections made in a weatherproof box. Limit switching shall consist of: 1) low level/pump off, 2) high level/pump on, and 3) high level alarm/system failure. The high-level alarm shall be both audible and visual and shall be easily detectable by occupants. Emergency notification information (e.g., telephone numbers of owner, Garfield County, service personnel) shall be posted near the high-level alarm. + The effluent pump shall be configured with a minimum dose volume of 100 gal (9.60" float differential for a single compartment, 500 gal. tank). Storage capacity in excess of the high- level alarm shall be 6" above the pump -on float level. • All access manholes on septic tanks and dosing chambers will be child proof and contain appropriate warning labels if accessible to the public. Confined space entry precautions should be observed by maintenance personnel. • The system contractor shall be aware of the potential for construction activities to reduce soil permeabilities at the site through compaction, smearing, and shearing. The following precautions and construction procedures should be employed during installation to minimize disturbance to native soils: i. Excavation should proceed only when the moisture content of the soil is below the plastic limit. If a sample of soil forms a rope instead of crumbling when rolled between the hands it is too wet and should be allowed to dry before excavation continues. ii. Excavation and backfill equipment should work from the surface where at all practical to avoid compaction of the soils at depth. iii. The bottom and sidewalls of the excavation should be left with a rough, open surface. The appearance should be that of broken or ripped soil as opposed to a sheared, smeared, or troweled surface. Any smoothed or smeared surfaces should be removed with a toothed rake or shallow ripper, taking care to remove loose residues from the bottom of the excavation by hand if necessary. iv. Care should be taken in placing fill materials in the excavation to avoid damaging the exposed soil surfaces. Operation - Maintenance and Inspections • The owner shall install a structural barrier if necessary and take precautions to prevent vehicular traffic, excessive surface watering, accidental flooding, or other activities in the vicinity of the soil treatment area which may compact, saturate, or otherwise alter the subsurface soil parameters used in designing the septic system. • The owner will plant and maintain grass or other shallow rooted cover crop to prevent erosion and promote evapotranspiration over the soil treatment area. ■ The owner will inspect and maintain the required mounding and drainage away from the soil treatment area to prevent saturation from precipitation and surface flows. ■ To mitigate the generation of preferential flow channels which may compromise the operation of the system, the owner will inspect and prevent intrusion of burrowing animals and deep- rooted plants into the soil treatment area. ■ The septic effluent pump and the effluent pump filter shall be inspected and cleaned as necessary every six (6) months. • The owner will conduct periodic maintenance of the septic system by removing accumulated sludge from the septic tank every 3-4 years to prevent clogging of the soil treatment area. C Limitations This report is a site -specific design for installation of an onsite wastewater treatment system and is applicable only for the client for whom our work was perforined. Use of this report under other circumstances is not an appropriate application of this document. This report is a product of K-Cronk Engineering, Inc. and is to be taken in its entirety. Excerpts from this report may be taken out of context and may not convey the true intent of the report. It is the owner's and owner's agent's responsibility to read this report and become familiar with the recommendations and design guidelines contained herein. The recommendations and design guidelines outlined in this report are based on: 1) the proposed site development and plot plan as furnished to K-Cronk Engineering, Inc. by the client, and 2) the site conditions disclosed at the specific time of the site investigation of reference. K-Cronk Engineering, Inc. assumes no liability for the accuracy or completeness of information furnished by the client. Site conditions are subject to external environmental effects and may change over time. Use of this plan under different site conditions is inappropriate. If it becomes apparent that current site conditions vary from those anticipated, the design engineer and Garfield County should be contacted to develop any required design modifications. K-Cronk Engineering, Inc. is not responsible and accepts no liability for any variation in assumed design parameters. K-Cronk Engineering, Inc. represents this report has been prepared within the limits prescribed by the owner and in accordance with the current accepted practice of professional engineering in the area. No warranty or representation, either expressed or implied, is included or intended in this report or in any of our contracts. SEAL a� p, 0 0 L I CF o' 61140 A ' W � �A � (� Kachayla . Cronk, P.E. 03 f/8� Date NOTE: This OWTS design is meant to include the following seven pages: 1) plot plan 2) septic layout plan 3) notes for your installer 4) soil treatment area plan view 5) soil treatment area cross section 6) pump vault detail 7) pump curve The plan is not to be implemented in the absence of these sheets. 7 .A f 1 1 approx. Loca of exisiting - exact loa of fleld unk but belleved be on north due to exls- slope of pri 1 B -West6..,i_ , >ad- - soli eval, r trenches approx, Location of retaining wall 1.06 acre GOLDEN PROJECT 439 WESTBANK ROAD 2395-021-02-009 PLOT PLAN MARCH 18, 2025 NORTH SCALE, 1'=40' NOTE EXISTING SEPTIC TANK TO BE ABANDONED IN PLACE OR REMOVED. IF THE TANK IS TO ABANDONED, IT MUST BE PUMPED OUT PRIOR TO CRUSHING, AND THE REMAINING VOID IS TO BE FILLED WITH GRAVEL, SAND, OR COMPACTED SOIL NOTE THE FOLLOWING SETBACKS MUST BE SEPTIC TANK SPRINGS/WELLS 50' LAKE/STREAM/IRRIG. DITCH-50' INTERMITTENT IRRIG. DITCH-10' GATED PIPE 10' SOLID PIPE/LINED DITCH 10' ➢OMESTIC WATER CISTERN —50' ➢OMESTIC WATER LINE 10' STRUCTURE W/CRAWLSPACE — 5' �� Westbank Road- MAINTAINED+ I STA I 100' 50' 25' 25' 10' I 100' 25' 20' STRUCTURE W/OCRAWLSPACE-5' 10, PROPERTY LINE 10' 10, drive existing tank 4o be abandoned In l place or removed { 1 / 1,500 gallon, two compartment L` concrete septic ll tank w/ effluent I pump I 4 I I SCHD 40 O f Glenn out +I existing residence SCHD 40 pressure transport main (see note addressing cover) I 1 I Isoil eva(. trenches A _ i N- I /f .g y� o� soil treatment area (STA) consisting of 3 rows of 14 Qu1ck4 Standard Infiltrators (or equivalent) for a total of forty-two units � �haMber n iL repair area F'�RpArdx. 6I' wi end ty T 1 caps, 1 � ' NOTE CALL 811 FOR UTILITY LOCATES GOLDEN PROJECT 439 WESTBANK ROAD 2395-021-02-009 SEPTIC LAYOUT PLAN MARCH 18, 2025 NORTH SCALE: 1'=30' I I 1.06 acres a, I a 0 L I ro I I I I approx. location I of retaining wall I I 3 NOTE CONTRACTOR TO VERIFY SLOPE) SOIL TREATMENT AREA ORIENTATION TO BE ADJUSTED PER SITE VARIATIONS TO FACILITATE CONSISTENT TRENCH DEPTH, RUNNING PARALLEL TO CONTOURS, K-CRONK �)-�1� ���.1)j� � ,' h',1�"f1�13,ie1.�'1'1,11�•ai��l[llirl,lC.t'U111 NOTES FOR YOUR INSTALLER This is a STAMPED, ENGINEERED design — yes, septics are "simple" and water runs downhill. However, like anything that is engineered, it is critical that you follow the design so the system performs as intended — I cannot approve a system that was not installed to plans! If, FOR ANY REASON, you need to: 1. Change the location/rotation of the septic tank (i.e. plumbing was stubbed out of different wall, etc.) 2. Change the location/rotation of the soil treatment area (i.e. slope differed from the design, owner has changed the site plan, etc.) YOU MUST CONTACT THIS OFFICE FOR A REVISED DESIGN! The revision must be submitted and approved through the County (with a County $ revision fee) prior to calling in for inspection. Revisions take time, so please be prompt when contacting us to ensure the project is not delayed. Next, and I cannot stress this enough - DO NOT install the chambers DEEPER than the maximum depth stated in the design — the depth is determined by factors that the design engineer cannot control. This includes SATURATED/POOR SOIL CONDITIONS & COUNTY OWTS CODE. Our designs give the widest range of depth possible for the specific site — if the required depth cannot be met, other options may need to be explored. If the soil treatment area is installed at a depth greater than allowed, there are very few solutions to resolve the problem. Examples include: • Removing all components and reinstalling them in a different location at correct depth. « Backfilling trenches to an acceptable depth (using WASHED CONCRETE SAND ONLY), installing a pump chamber, effluent pump, and pressurizing the system. Please reach out at any time during the installation process if you have any questions — this office has experienced several installations that have failed County inspections due to issues described above — I would like to see every system PASS without comment as this makes everyone's job easier. Kachayla Cronk, P.E. — (970) 250-0572 soil treatment area (STA) consisting of 3 rows of 14 Qu1ck4 Standard Infiltrators (or equivalent) for a total of 42 units with pressure dlstrlbutlon system as shown 1-1/2' SCHD 40 PVC pressure Laterals with 5/32' holes spaced 36' o.c. Drll( holes at 12,00 o'clock to direct discharge up to disperse against top of chamber, typ. two (2) of six (6) SCREW DETAIL NTS ,approx. 61' w/ endcaps, typ —56' of chambers,typ 1 m 48', typ. rI 4' min. III Y i (10recommended) a t c d c a _ E u O1 II I� L ` al 2' SCHD 40 r 2' SCHD 40 } pressure pressure l manifold transport main ` V septic Influent — from lift station irovlde venting and observation/ba(an ports at each end of Infiltrator trenches as shown (see detail on So(( Treatment Area - Cross Section) S❑IL TREATMENT AREA — PLAN VIEW SCALE1 1'=10' GOLDEN PROJECT 439 WESTBANK ROAD 2395-021-02-009 SOIL TREATMENT AREA -PLAN VIEW MARCH 18, 2025 SCALE; 1'=10' fasten adjacent Infiltrators w/ (3) 3/4' screws at approximately 10 o'clock, 12 o'clock, and 2 o'clock position, typ. INFILTRATOR_(QUICK4 STANDARD OR EQUIVALENT), INSTALL IN ACCORDANCE WITH 'INFILTRATOR TECHNICAL MANUAL, INFILTRATOR SYSTEMS INC., 123 ELM STREET, SUITE 12, OLD SAYBROOK, CONNETICUT 06475 SYNTHETIC FILTER FABF (140-200 MESH) OVER INFILTRATORS, TYP. 1-1/2' SCHD 40 PRESSURE LATERAL WITH 5/32' HOLES SPACED 36' O.C. AT 12 O'CLOCK TO DIRECT DISCHARGE UP FOR DISPERSION AGAINST TOP OF CHAMBER (TYP. 1 OF 8) PROVIDE VENTING/INSPECTION PORTS AT EACH END CAP AS SHOWN PROVIDE SANDY LOAM SOIL CAP (MOUND 5%), TYP, EXISTING FGROUND DISK OR SCARIFY { 36' i 4-min. 2' SCHD 40 PVC--(05preferrect> PRESSURE MANIFOLD FOR ALL LINES WITH LESS-T INSTALLATION DIMENSIONS THAN 36' OF COVER, PROVIDE TYPICAL OF ALL TRENCHES MIN. 1/8' FALL PER 12' RUN FOR DRAIN BACK TO LIFT NOTE, STATION, TYP, IF CONSISTENT TRENCH DEPTH 2' SCHD 40 PVC PRESSURE' CANNOT BE MAINTAINED, TRANSPORT LINE FROM LIFT INFILTRATOR CHAMBERS MAY BE STATION INSTALLED LEVEL AT 24' MIN. AND 48' MAX BGS S❑IL TREATMENT AREA — CROSS SECTI❑N (TYPICAL 3 OF 3) SCALES 1'=10' SOILS LOG NOTES #1 SOIL TYPE 2, USDA - SANDY LOAM, GRANULAR, MODERATE STRUCTURE #2 SOIL TYPE 2, USDA - SANDY LOAM, BLOCKY, MODERATE STRUCTURE NO GROUNDWATER OR EVIDENCE OF PERIODICALLY SATURATED SOILS PRESENT TO A DEPTH OF 96' BELOW GROUND SURFACE (BGS) ELEVATION DESIGN SPECIFICATIONS DESIGN DISTANCE FROM FOUNDATION LINE TO SEPTIC TANK = 20' DESIGN DISTANCE FROM SEPTIC TANK TO SOIL TREATMENT AREA = 150' ASSUMED ELEVATION OF GROUND SURFACE AT ENTRY TO SOIL TREATMENT AREA = 100.00, ELEVATION OF INFILTRATIVE SURFACE OF SOIL TREATMENT AREA = 98,00' ASSUMED INVERT ELEVATION OF SEWAGE LINE AT EXIT FROM FOUNDATION LINE = 96.15' INVERT ELEVATION OF SEWAGE LINE AT ENTRY TO SEPTIC TANK = 95.50' SUSPEND PRESSURE LATERAL WITH ALL WEATHER PLASTIC PIPE STRAP WITH 120 LBS TENSILE STRENGTH AT EVERY CHAMBER CONNECTION, TYP. PROVIDE MIN. 1/8'-- FALL PER 12' RUN FOR DRAIN BACK TO PRESSURE MANIFOLD, TYP, -12' L_� -96, SOILS LOG (SEE NOTES) GOLDEN PROJECT 439 WESTBANK ROAD 2395-021-02-009 SOIL TREATMENT AREA - CROSS SECTION MARCH 18, 2025 SCALE, AS SHOWN 4' SCHD 40 PVC VENT/INSPECTION PORT SOIL CAP\ 3/4' THREAD CAP 3/4' THREAD NIPPLE TO SURFACE FOR CLEAN OUT AND PRESSURE BALANCING (END OF LATERAL ONLY) 1-1/2' SCHD 40 PVC PRESSURE LATERAL WITH 5/32' HOLES SPACED 36' O.C. AT 12 O'CLOCK TO DIRECT DISCHARGE UP FOR 3/4' THREAD TEE DISPERSAL AGAINST TOP OF INFILTRATOR PRESSURE LATERAL CONSTRUCTION DETAIL SCALE: 1 "=1' mI ^�\ W f� V J C) O cz CU Q Q cz O CU L O ^E W rC/) V J E =3 n W v� cn E w z 00 °? z � rn T ¢ O N co N m O r 3 w U `o J M O w C ¢ w m a g N o 0 x � w O C R 00 Ln n m w v Q v 3 R Q) N U O EL N U 2 U � O � O � m U) — O N C7 � v fn v � CO C 'v V) N v — v+•- N LZ J ,O 3 N E L O >T O E U v o QN 0 0 v c rn � o, E =O.EE c U C c O 0 U U N a- O _ 2 v C 0 O � N O O J � U � 0 0 Co � C > > 0 a W m L 1 O � C ra O E O U.� _v0 WYofaN 0 CU�-ozQ-om -j PQ T �' V) zwo> w3I x I A In IL U IIE J0',0�2: Q� OMMDQ ILF l7�WIL2: � � O O C N cn U V7 V7 O 0 a3 0 O U) > v 0 O E _ o 0 0- o T CD o t aci c - O U) v U v = CL O Q U Q c c w v c o I- x v E 0 (7 c c v — o 0 CD v— rn a>i c 0 a O v °' o 0 ono N C + O CO O O a)E Q E o v E o=3o o c a I > (D a) �� �� a rn, c v v :E -co a�- E a cD a O M 1 y U d N v a+ 0 0 LO 0 O C cn O _0 J 2 O 0 � LLJ N Of Pump Selection for a Pressurized System - Single Family Residence Project GOLDEN - 439 WESTBANK Parameters Discharge Assembly Size 2.00 inches Transport Length 150 feet Transport Pipe Class 40 Transport Line Size 2.00 inches Distributing Valve Model None Max Elevation Lift 20 feet Manifold Length 26 feet Manifold Pipe Class 40 Manifold Pipe Size 2.00 inches Number of Laterals per Cell 6 Lateral Length 24 feet Lateral Pipe Class 40 Lateral Pipe Size 1.50 inches Orifice Size 5/32 inches Orifice Spacing 3 feet Residual Head 5 feet Flow Meter None inches 'Add -on' Friction Losses 0 feet Calculations Minimum Flow Rate per Orifice 0.68 gpm Number of Orifices per Zone 54 Total Flow Rate per Zone 36.5 gpm Number of Laterals per Zone 6 % Flow Differential 1 st/Last Orifice 0.2 % Transport Velocity 3.5 fps Frictional Head Losses Loss through Discharge 2.7 feet Loss in Transport 3.4 feet Loss through Valve 0.0 feet Loss in Manifold 0.2 feet Loss in Laterals 0.0 feet Loss through Flowmeter 0.0 feet 'Add -on' Friction Losses 0.0 feet Pipe Volumes Vol of Transport Line 26.1 gals Vol of Manifold 4.5 gals Vol of Laterals per Zone 15.2 gals Total Volume 45.9 gals Minimum Pump Requirements Design Flow Rate 36.5 gpm Total Dynamic Head 31.2 feet f� Orenco Y 12 160 140 1 Pum Data 10 20 30 40 50 60 70 Net Discharge (gpm) Legena System Curve: Pump Curve: Pump Optimal Ranger Operating Point: Design Point: