HomeMy WebLinkAboutApplicationIle Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfieldcountyco.gov
TYPE OF CONSTRUCTION
INVOLVED PARTIES
Property Owner: Emily Johnson Phone: (858 )243-3671
Mailing Address:138 Flying Fish RD, Carbondale CO, 81623
Email Address: emilyrj1090@gmail.com
Contractor: Jay DeWire
Mailing Address:
Email Address: aspenviking@gmail.com
Phone: g{ 70 ) 309-2955
Architect: Land and Shelter Phone: (301
Mailing Address: 1323 Westridge Ct, Carbondale, CO 81623
Email Address: evanspurrell@landandshelter.com
Engineer: Caryatid Structural Phone: (970 )239-1187
Mailing Address: P.O.Box 1214, Carbondale, CO 81623
Email Address: elizabeth@caryatidstructural.com
Manufactured Home Installer:
Mailing Address:
Email Address:
PROJECT DETAILS
Phone: ( )
The project includes interior and exterior finish renovations with some rearrangement of walls as well as an addition and
Describe Work: reconfiguration of the roof on the east side of the house. The interior improvements include new gas fireplaces, modernized
mechanical systems, replacing existing windows/doors, installing new or larger windows/doors in select locations,
expansion of an existing wood deck, a new hot tub on a slab at grade.
,nb Address:138 Flying Fish RD, Carbondale CO, 81623
Assessor's Parcel Number:
239132100029
Sub. Lot , Block
Owner's Valuation of Work: $$301,613.68 Property Size (Sq. Ft. or Acres): 4.82 Acres
Sq. Ft. of Building: 4,163 Height: 291-611 # of Floors:2
Class of Work: INew Remodel/Alteration Addition
Garage: Attached Detached
PROJECT DETAILS CONTINUED
Septic: ■ OWTS Community
Type of Heat: j�Natural Gas
❑ Propane
❑
Electric
❑ Other
Driveway
❑Exempt
❑ Permit #:
Permit:
_
N_OT.ICE _
Authority. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
1 hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state, or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring
the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
Emily Johnson April 1, 2026
Property Owner Print and Sign
Date
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuation:
Plan Check Fee:
Permit Fe :
Manu. Home Fee:
Misc. Fees:
Total Fees
Fees Paid:
Balance Due:
BP No:
OWTS No:
SU
-�-
-
Setbacks:
OCC Group:
Const. Type:
Zoning:
BUILDING / PLANNING DIVISION:
Sig Approval
Date