Loading...
HomeMy WebLinkAboutOWTS Installation Observations - Certificate of OWTS 03.18.2026 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado March 18, 2026 Ted and Karen Miller 1248 Rimrock Drive Rifle, Colorado 81650 ted@tedmillerconsulting.com Project No. 25-7-114.02 Subject: Certification of Onsite Wastewater Treatment System (OWTS), Proposed Residence, Parcel 13, High Aspen Ranch, 1422 High Aspen Drive, Garfield County, Colorado Dear Mr. & Mrs. Miller: A representative of Kumar & Associates observed the installation of the Onsite Wastewater Treatment System (OWTS) for the residence at the subject site as required by the Garfield County Environmental Health Department. Our observations and recommendations are presented in this report. The services are supplemental to Kumar & Associates agreement for professional services with Ted Miller dated January 9, 2025. We previously designed the OWTS for the residence as submitted in our report dated March 17, 2025, Project No. 25-7-114.02. The system was designed for three bedrooms and 450 gallons flow per day. We performed our as-built evaluation on June 10, July 8, and December 23, 2025 and on January 6 and February 12, 2026. The OWTS components observed included: cleanout, sewer line, septic tank, pump, effluent line, and soil treatment area (STA) and the locations of these components. The installation and locations of the system components were verified as shown on Figure 1. Pictures of the OWTS components made during the site visits are included with this report. On June 9, 2025, a gradation analysis was performed on a sample of the sand filter material. The sand filter material classified as secondary sand. On February 27, 2026, after power had been supplied to the pump, a pump performance test was performed with adequate head pressure observed. It is our opinion that the OWTS was installed in general conformance with the above-referenced design. The observations and recommendations presented above are based on our site observations and our experience in the area. We make no warranty either express or implied. Alterations to the system or improper backfill and site grading could affect the operation and effectiveness of the OWTS. If you have any questions or if we may be of further assistance, please let us know. Kumar & Associates OWTS PHOTOGRAPH LOG PROPOSED RESIDENCE PARCEL 13, HIGH ASPEN RANCH 1422 HIGH ASPEN DRIVE GARFIELD COUNTY, COLORADO Project No. 25-7-114.02 Photograph 1: Sewer line exiting the residence and cleanout. Photograph 2: Septic tank inlet tee OWTS PHOTOGRAPH LOG PROPOSED RESIDENCE PARCEL 13, HIGH ASPEN RANCH 1422 HIGH ASPEN DRIVE GARFIELD COUNTY, COLORADO Project No. 25-7-114.02 Photograph 3: Valley Precast 1,000-gallon, 3-chamber septic tank Photograph 4: Soil treatment area (STA) prior to sand placement OWTS PHOTOGRAPH LOG PROPOSED RESIDENCE PARCEL 13, HIGH ASPEN RANCH 1422 HIGH ASPEN DRIVE GARFIELD COUNTY, COLORADO Project No. 25-7-114.02 Photograph 5: Soil treatment area (STA) with distribution lines and gravel. Photograph 6: Control panel GRADATION ANALYSIS TEST LABORATORY TEST REPORT DATA Laboratory Client: Location / Plant: Sample / Product: Sample Date: Lab Test Date: Job Number: SIEVE SIEVE OPENING IN MILLIMETERS PERCENT PASSING THRU SIEVE 3"75 100.0 1.5 37.5 100.0 3/4"19 100.0 3/8"9.5 100.0 No. 4 4.75 100.0 No. 8 2.36 85.0 No. 16 1.18 66.0 No. 30 0.6 42.0 No. 50 0.3 17.0 No. 100 0.15 6.0 No. 200 0.075 2.8 GRADATION RESULTS COMPARED TO PREFERRED AND SECONDARY SAND FILTER SPECIFICATIONS Value Units Preferred Sand Value Pass / Fail Preferred Sand Secondary Sand Value Pass / Fail Secondary Sand 1.04 millimeters 0.205 millimeters 0.25 to 0.60 FAIL 0.15 to 0.60 PASS 5.06 unitless ratio < or = 4.0 FAIL < or = 7.0 PASS 2.8 millimeters < or = 3 PASS < or = 3 PASS Effective Size - D10 - Diameter that 10 percent of the sample is finer than. Kumar Glenwood Springs Ted Miller Western Slope Materials - Carbondale Secondary Sand 06/09/2025 Uniformity Coefficient (D60 / D10) Percent passing thru #200 Sieve 06/09/2025 25-7-114.02 Parameter D60 - Diameter that 60 percent of the sample is finer than. 0 10 20 30 40 50 60 70 80 90 100 0.01 0.1 1 10 100 Pe r c e n t P a s s i n g S i e v e Diameter of Particle in Millimeters Plot of Gradation Analysis 3"1.5"3/4"3/8"#4#8#30#50#100#200 #16