HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-04-26-9779
AVLT COFFMAN RANCH LLC
UNHEATED OPEN-AIR POLE BARN
1837 COUNTY ROAD 100
DOUG COFFMAN SUBDIVISION Lot: 1 CONSERVATION
EASEMENT, 140.636 ACRES
1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS:IIWWW.COLORADO.GOWPACIFIC/DORA/DPO ELECTRICAL PLUMBING PE
RMITS
4) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
5) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED
PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE
CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY.
EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY
INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES.
6) SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE
CONTACT THE COUNTY PLANNER FOR THE APPLICATION.
7) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
8) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS
COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION,
3000 PSF.
9) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED.
10) UFER GROUNDS ARE REQUIRED TO BE INSPECTED AT FOOTING INSPECTION
11)ANY EXPOSED FOAM IS TO BE COVERED WITH AN IGNITION BARRIER OR A
THERMAL BARRIER BASED ON LOCATION. (IRC R316)
12) INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
13) LOCATE ALL UTILITIES PR10R TO ANY WORK. 811 1S THE STATE UTILITY LOCATE
NUMBER
14) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING
PLANTS AND SEEDS.
15) PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED.
16) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.
17) FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER.
18) PORTABLE RESTROOMS ARE TO BE SUPPLIED WHEN AN EVENT HELD IN THE
BARN, PERMANENT RESTROOMS ARE TO BE SUPPLIED IN A FUTURE PHASE.
19)THE CRUSHER FINES ACCESSIBLE ROUTE FROM THE PARKING TO THE BARN IS TO
BE STABLE, FIRM AND SLIP RESISTANT.
20) IF THE STRUCTURE IS EVER ENCLOSED A BUILDING PERMIT WILL BE REQUIRED.
21)THE STEPS FROM THE DECK TO GRADE REQUIRE HANDRAILS ON EACH SIDE OF
THE STAIRS.
22) IF THE BEAMS AND JOIST FOR THE DECK ARE WITHIN 6" OF GRADE, THE LUMBER
IS TO BE PRESSURE TREATED.
23) PROVIDE SPECIAL INSPECTION REPORTS SPECIFIED BY THE STRUCTURAL
ENGINEER TO THE INSPECTOR AT FRAMING INSPECTION.
24) POST THE MAXIMUM OCCUPANT LOAD OF 176.