Loading...
HomeMy WebLinkAboutSoil Evaluation Geo Quest Project No. 25-159 Date: 12/17/25 Paƫ ArneƩ CR 301 Parachute, CO 81635 (970) 274-9775 mom.4x4@hotmail.com RE: Onsite Wastewater Treatment System (OWTS) Soil EvaluaƟon Dear Ms. ArneƩ, Geo Quest was asked to perform a soil evaluaƟon for a new OWTS at the property described as:  Garfield County Parcel No. 240506200089  County Road 301, Parachute, Colorado This memo presents the evaluaƟon details and USDA soil type encountered at the property on Friday, November 17, 2025. This informaƟon may be used in OWTS design. Soil EvaluaƟon Two soil profile test pits, idenƟfied as Test Pit 1 (TP-1) and TP-2, were excavated approximately 50 feet northeast and east of the proposed structure, near the planned OWTS site. The excava- Ɵons were completed with a Kubota mini excavator to maximum depths of 8 feet below ground surface and approximate locaƟons are shown on the aƩached Test Pit LocaƟon Map. RepresentaƟve soil samples were collected from the material layers encountered in the test pits. These samples were evaluated and classified using the USDA Soil Texture and Structure methods. The USDA classificaƟons were applied to the guidance document from Colorado De- partment of Public Health & Environment, RegulaƟon No. 43, Table 10-1 as presented below. Groundwater, bedrock or other limiƟng layers were not encountered in the test pits. Table 10-1 - Soil Treatment Area Long-Term Acceptance Rates Soil Type Soil Tex- ture Soil Struc- ture-Type Soil Struc- ture-Grade PercolaƟon Rate (MPI) Treatment Level 1 2A Silty Loam Blocky Weak 26-40 0.50 Respecƞully submiƩed, Geo Quest, LLC Kevin E. Dye, P.E. Figures: Test Pit LocaƟon Map, Test Pit Logs Approximate Test Pit LocaƟon map 12/17/25