HomeMy WebLinkAboutA7 - Utility Report Stamped
1
TABLE OF CONTENTS
Introduction ..................................................................................................................................... 3
Location ................................................................................................................................ 3
Existing Land Use ................................................................................................................. 3
SANITARY SEWER SYSTEM ..................................................................................................... 4
Sanitary Sewer Connectivity................................................................................................. 4
Local Sanitary Sewer System ............................................................................................... 5
Wastewater Loading Rates ................................................................................................... 5
WATER DISTRIBUTION SYSTEM............................................................................................. 7
Regional Water Distribution Plan and Connectivity ............................................................ 7
Proposed Development Design ............................................................................................. 8
SHALLOW UTILITIES ................................................................................................................. 9
CONCLUSION ............................................................................................................................. 10
REFERENCES ............................................................................................................................. 11
Exhibits
A. Holy Cross Energy Will Serve Letter
B. Black Hills Energy Will Serve Letter
C. CenturyLink-Lumen Technologies Will Serve Letter
D. Spring Valley Sanitation District Will Serve Letter
2
Vicinity Map
3
INTRODUCTION
This report was prepared for an application to amend the subdivision Preliminary Plan and Planned
Unit Development (P.U.D.) zoning to reflect the removal of the land west of County Road 114 from
the P.U.D. The land west of County Road 114 in the previous application has been conserved and
sterilized for agricultural uses and open space.
The current amendment application is for 94 residential units in total. This reflects a reduction if 42
residential units from the approved Preliminary Plan that was last amended in 2016.
Location
The 203.7-acre Lake Springs P.U.D. is a proposed residential development located in within
Sections 33 and 34 of Township 6 South, Range 88 West of the 6th Principal Meridian and Section 4
of Township 6 South, Range 88 West of the 6th Principal Meridian in Garfield County, Colorado.
County Road 114 runs north to south through the west boundary of the existing property. County
Road 114 intersects County Road 115 about 250 feet north of the property. The project is bounded
by two separate parcels owned by the Colorado Mountain College to the south and east. Rivendell
Distribution is located to the west of property. There are also some other private properties located
to the west, north, and east of the property.
The service area considered for sanitary sewer and water analysis in this report consists of the
proposed Lake Springs P.U.D. and potential offsite flows. The proposed site will contain 84 single-
family lots and 10 multi-family housing lots, resulting in 94 homes.
Existing Land Use
The project site is currently mostly undeveloped land and is covered with grasses, and woody
stemmed plants. The land currently has a few small structures that will be removed with the
proposed development and a few historic structures that will remain within open space parcels. The
property includes the existing County Road 114 corridor contained within a 60’ easement and an
existing pond along the east side of the County Road. A series of narrow ranch roads cross the
property which will be removed from the proposed development.
4
SANITARY SEWER SYSTEM
Sanitary Sewer System Connectivity
There is an existing 15-inch sanitary sewer main located adjacent to the western property boundary
of the proposed site in a 30-foot easement. The sanitary sewer runs from the north to the south,
ultimately discharging to the Spring Valley Sanitation District sewage treatment plant that is
operating at a small fraction is the plant’s capacity of 500,000 gallons per day. The Spring Valley
Ranch sanitary sewer main was constructed based on the full build-out of the Lake Springs P.U.D.
(originally planned for 210 units [194 single family and 16 multi-family]) as well as the entire
Spring Valley Ranch (which was to include 500+ lots). See Exhibit D for the will serve letter
provided by Spring Valley Sanitation District.
The proposed development will connect to the existing 15-inch sanitary sewer segment that runs
along County Road 114 in two locations. The existing projected volume of sewage flow entering the
existing 15-inch segment of mainline during average daily flow is projected to be 0.065 cfs and the
peak hour flow is projected to reach 0.163 cfs based on 300 gallons per day per dwelling unit
assuming a typical home with 4 residents for all of the proposed units. A peak flow factor of 2.5
multiplied by the average daily flow was used to determine the peak discharge into the sanitary
sewer main at the connection to Lake Springs P.U.D. A 16-hour day was assumed for the
calculations of the average day and peak hour flow. Therefore, the plant will remain well below
capacity with the proposed Lake Springs P.U.D. addition.
According to the wastewater treatment plant operator, the existing 15-inch sanitary sewer main is
also currently running at a very small portion of its capacity at the lowest tie-in location near the
CMC campus. There are currently no measured flow rates on the existing pipe. The estimated
allowable capacity of the 15-inch sanitary sewer main is 2.89 cfs flowing at 80% capacity at a grade
of 0.21-percent. The main was sized to function as the sole collection pipe to service future growth
within the Spring Valley Ranch area down to the plant. The 0.163 cfs peak flow from Lake Springs
P.U.D. would make up only about 5.6% of the existing pipe design capacity.
Therefore, the potential offsite flows and the flows generated by the proposed development can be
5
conveyed by the existing and the proposed system of gravity sewer piping to the existing wastewater
treatment plant. A new inline manhole will be required for one of the 2 connections to the 15”
existing pipe and one existing manhole will need to be reworked to add a new 12” pipe connection.
Local Sanitary Sewer System
All of the proposed development in Lake Springs P.U.D. lies uphill of the existing mainline or its
proposed extensions and no internal lift stations are required. The proposed sanitary sewer system
for the Lake Springs P.U.D. residential development will service 84 single family units and 10 multi-
family units. Preliminary layouts of the local streets, grading, and utility alignments were used to
determine the sanitary basin boundaries.
Laterals and interceptors of 8-inch and 12-inch diameter sewer line form a network of sanitary sewer
piping that will eventually carry flows to the existing 15-inch diameter mainline in three different
locations. A table of the proposed sanitary sewer lengths required to service the proposed
development can be seen in Table 1 below.
Table 1, Sanitary Sewer Improvements Required to Service Lake Springs P.U.D.
Improvement Description Length of Line Size of Line
Gravity Sewer 12,722 feet 8-inch and 12-
inch
Wastewater Loading Rates
The sanitary sewer pipe sizing is based on the Spring Valley Sanitation District design guidelines.
The average sanitary sewer flow rate for single-family residential developments is 300 gallons per
dwelling unit per day. The 10 multi-family units were also assumed to have an average sanitary
sewer flow rate of 300 gallons per dwelling unit per day. Peak factors associated with sanitary sewer
loading rates were assumed to be 2.5. All sanitary sewer pipes were sized for a Peak Hourly Flow,
which is the Average Day Flow, not including infiltration, multiplied by the Peaking Factor. The
total Average Daily Flows, including a Peak Hourly (Design) Flow for the sanitary sewer system are
summarized in Table 2 below.
6
Table 2, Lake Springs P.U.D. Sanitary Sewer Loading Rates
Land Use
Maximum
Dwelling
Units
(DU)
Loading
Rate
Gpd/DU
Total Ave.
Daily Flow
Gpm
Peaking
Factor
PF
Peak Hour
Flow
Gpm
Single Family Attached
BASIN A
7
300 2.19 2.5 5.47
Single Family and Multi
Family Attached
BASIN B
87 300 27.19 2.5 67.97
TOTAL 136 29.38 2.5 73.44
Table 3 details the predicted sewer demand for each of the proposed 2 sanitary basins connecting to
the 15-inch existing pipe and tabulates the flow totals for both the average daily and peak hour
flows. The capacities in the 8-inch and 12-inch diameter pipes were determined throughout the
proposed site and at the tie-in locations to the existing 15-inch sanitary sewer mainline. The
estimated average daily flow from the proposed site that is being routed to the existing 15-inch
diameter sanitary sewer mainline is 0.065 cfs and the peak hour flow from the proposed site that is
being routed to the existing main from the site is 0.164 cfs. The combined flow from the existing
parcels and the proposed site at the farthest downstream tie-in location along the existing 15-inch
sanitary sewer main will be well below the pipe’s capacity during average day and peak hour
demands of 2.89 cfs flowing at 80% capacity at a grade of 0.21-percent.
This average daily flows and peak hour flows from the proposed preliminary plan is a 30.1%
reduction in the flows from approved preliminary plan.
The proposed sewer pipe network capacities are reflected in Table 3.
7
Table 3, Lake Springs P.U.D. Sanitary Sewer Demand by Basin
Lake Springs
P.U.D.
Basins
Max.#
Units
Peak.
Hour
(gpm)
***
Pipe
Size
%
Full
Sub Basin A1 35 27.35 8” dia. 11.1%
Sub Basin A2 52 40.63 8” dia. 14.0%
Combined
Basin A
87 67.98 12” dia. 8.6%
Basin B 7 5.47 8” dia. 3.5%
Total All
Basins 94 73.44
** Capacity calculations based on minimum pipe slope assumed 0.5%
WATER DISTRIBUTION SYSTEM
Regional Water Distribution Plan and Connectivity
The proposed development, Lake Springs Ranch P.U.D., will not connect to any existing regional
water districts or facilities. There are no plans for any future expansion of the proposed water
system for offsite properties.
The Lake Springs Ranch P.U.D. development will be served by Carbondale Fire Protection District
and its closest fire station near the intersection of State Highway 82 and County Road 154. There
are no fire hydrants in the area that are close enough to the property for use to fight a house fire on
the property. The proposed fire hydrant placement is designed to provide all the necessary coverage
for the 94 residential units.
8
Proposed Development
A new community water system is to be installed to provide fire protection, irrigation, and domestic
use for the 94 units proposed in the development.
The proposed system will be supplied from two onsite wells that have been tested for a recoverable
flowrate of 115 gpm and 100 gpm. The well pumps will be up a pair of separate 4” water lines up
to a water treatment building just south of the wells for water quality treatment. A single 4-inch
water storage tank supply line will transfer water from the water treatment building up the proposed
road network about 1,500 feet with an elevation climb of 118 feet before injection into the 350,000
gallon storage tank. This tank size is a reduction of 50,000 gallons from the previous approved
preliminary plan due to the reduction in demand from the removal of 42 residential units. The water
will receive the necessary chorine contact time in this 4” pipe up to the tank. The proposed storage
tank is located on Tank Road which is a gravel service road serving off of High Alpine Drive. The
tank will provide water to all of the 94 residential units through a series of 12 inch and 8 inch water
lines. There will be 2 pressure zones in the system due to the high elevation change on the property.
A pressure reducing valve will be located on Lake Springs drive above the 18 lots in Block 1 of the
development.
The Average Daily Demand for residential use was developed by using the proposed layout and the
typical water demand rates of 350 gallons per day per dwelling unit (gpd/DU) for single family and
multi-family lots. The water demands were based on a 16-hour day. Additionally, an irrigation
demand of 58.5 gpm, which is based on 2,500 square feet of irrigated landscaping per lot during the
month of June was also added to this number. Should the water storage tank be emptied due to a line
break, the recovery time to refill the tank will be approximately 39 hours. This is based on a
pumping rate of 150 gpm in the proposed 4-inch supply line. A 93 gpm pumping rate from the water
treatment building is necessary to maintain a full water tank storage during the irrigation season.
The final water report and community water system application for the State of Colorado will
provide all of the WaterCAD analysis.
9
The proposed system within the Lake Springs Ranch P.U.D. residential development will be
designed with one 12-inch C-900 diameter trunk line which reduces to 8” C-900 mains according to
the needs of the system as listed in the WaterCAD analysis. Condition #13 of the 2016 Preliminary
Plan Amendment resolution (Resolution No. 2016-35) asked that the water system be looped. There
are portions of the higher elevations of water system that are now looped in order to get the required
fire flow according to the estimated house size and fire rating for the single-family houses.
However, there is no great benefit to the system pressures to loop the lower portion of the system
since there is already a pressure reducing valve on the 8” water main just above where a potential
lower loop could occur between the pipes in Van Cleve Lane and Lake Springs Drive. A looped
connection line at this location would have also required a second pressure reducing valve vault on
the Van Cleve Lane pipe and there would be only a minor benefit to the pressures of the homes
below a tee. Therefore, the applicant is asking that this condition be eliminated due to the changes to
the water system design layout.
Each single-family unit shall have a single 2-inch diameter water service stub for irrigation and
domestic use. The townhomes can be served with an ¾” water service. All fire hydrants, valves and
other appurtenances shall be constructed in accordance to the Garfield County Unified Land Use
Resolution of 2024 and international fire code.
SHALLOW UTILITIES
The Lake Springs Ranch P.U.D. will connect to existing telephone, gas, and electric lines.
Holy Cross Energy will serve the site with electricity. A will serve letter is included as Exhibit A.
The proposed development will tie into existing electric overhead power lines that run east to west
near the southern boundary line. A portion of these overhead lines will be replaced with
underground lines within most of the property boundary in order to not negatively impact the
proposed lot layout. A second overhead electric line extends north on the neighboring Rivendell
Distribution property on the west side of County Road 114. This second overhead line will also be
replaced with a new underground electric alignment where it crosses the subject property and
County Road 114. This line will go back to overhead electric at an existing power pole near the
10
current entrance to the Rivendell Distribution property before continuing north across the Rivendell
Distribution property as per existing.
Black Hill Energy will provide the proposed development with gas service. See Exhibit B for the
will serve letter. The nearest Black Hills Energy facility is a regulator station on the Colorado
Mountain College property to the southwest of the nearest proposed lots for Lake Springs Ranch
P.U.D. A 4-inch diameter gas line is required to be extended along an existing Black Hills Energy
gas easement on the Colorado Mountain College property and then up the east side of the right-of-
way of County Road 114, a total of about 5,050 feet. Any future extensions to the north beyond the
development would need to extend up County Road 114 off the 4-inch loop. Black Hills Energy will
require a 4-inch loop up County Road 114 within the subject property and around Lake Springs
Drive. All of the other dead-end lines would only need to be 2-inch in diameter.
CenturyLink-Lumen Technologies will be the provider of fiber optic phone and data service. See
Exhibit C for the will serve letter. The nearest location of the existing phone network is at the turn in
County Road 114 north from the main part of campus and the Pinyon Pines Apartments. The fiber
optic line would also be installed on the east side of County Road 114 off the paved surface in the
right-of-way for a length of about 3,600 feet to the first lots of the proposed development.
CONCLUSION
This utility report was prepared in compliance with the Garfield County standards and specifications.
It presents the proposed sanitary sewer and water distribution system layout with consideration of
the Spring Valley Sanitation District system capacity and the flowrates of the well pump tests
performed in 2023 by Zancanella and Associates. The proposed sanitary sewer system will provide
adequate capacity to serve the proposed residential development. The proposed water distribution
system will meet peak hour demands and maximum day demands plus fire flow while maintaining
adequate flow and pressure. The existing segments of sanitary mainline, to which the Lake Springs
Ranch P.U.D. development will connect, has been demonstrated to be adequate.
The cost of extending service to the subject property is the responsibility of the applicant for each of
the utilities.
11
REFERENCES
International Fire Code: International Code Council, 2021.
International Building Code: International Code Council (ICC), 2018.
WaterCAD v8.0: WaterCAD for AutoCAD, Haested Methods Solution Center, Waterbury, CT,
2025.