HomeMy WebLinkAbout1.10 Exhibit I - Traffice AssessmentAmi’s Acres 096671019 Page 1 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 February 16, 2026 Mr. Yancy T. Nichol Sopris Engineering LLC 502 Main Street, Suite A3 Carbondale, CO 81623 Re: Ami’s Acres Traffic Study Letter Garfield County / Glenwood Springs, Colorado Dear Mr. Nichol: This letter documents the results of a traffic study including trip generation, trip distribution, traffic assignment, and operational analysis for the redevelopment of Ami’s Acres located in Garfield County / Glenwood Springs, Colorado. The site is currently 73 campgrounds and two homes. The redevelopment is proposed to include up to 98 new single-family detached homes in addition to the two existing homes to remain. A vicinity map is attached as Figure 1. A conceptual site plan for the project is attached. It is expected that the project will be completed in the next several years. Since traffic along Highway 6 is constant without any significant development to the west, analysis was conducted for one horizon, which serves as both the near- and long-term horizons. The site accesses along Highway 6 were included as a part of this study following the State of Colorado Department of Transportation (CDOT) standards and requirements. Due to the very low traffic volume generated to the west of Ami’s Acres, it was conservatively assumed that five vehicles per hour are traveling past the site in both directions during the morning and afternoon peak hours (previous counts identified just one or two vehicles per hour on this stretch of roadway). Due to the insignificant amount of traffic traveling eastbound and westbound on the old Highway 6 frontage road through both access intersections, no annual growth rate was applied. Therefore, the traffic volumes projected represent both short term build out and the long term 20-year horizon. Regional access to Ami’s Acres is provided by Interstate 70 (I-70) while primary access to the site is provided US-6 and the old US-6 alignment which is referred to herein as the US-6 Frontage Road. Direct access to the site is provided by two existing accesses along the US-6 Frontage Road. EXISTING ROADWAY NETWORK The US-6 Frontage Road is a western extension to US-6, following the old highway alignment prior to the construction of Interstate 70. The roadway ends approximately 2,500 feet west of Ami’s Acres. Between the existing campground and the dead end, the US-6 Frontage Road provides access to a single detached home. The roadway operates with a single through lane in each direction and has a posted speed limit of 40 miles per hour (mph) adjacent to Ami’s Acres site. Two project “T”-accesses currently exist along the US-6 Frontage Road approximately 340 feet apart, measured center to center. Both the East Access (#1) and the West Access (#2) provide the same geometry and control for vehicle movements. The southbound approaches operate with a single lane for both left and right turning movements. The eastbound approaches have one lane for shared left turning and through movements. The westbound approaches operate with a single lane for shared through and right turning movements. There are no existing stop signs, but it can be assumed that the vehicles on the US-6 frontage road have the right of way. An aerial photo that illustrates both existing accesses configuration is provided as follows. Ami’s Acres 096671019 Page 2 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 East (#1) and West (#2) Accesses and US-6 Frontage Road The intersection lane configuration and control for the existing accesses is shown in attached Figure 2. TRIP GENERATION Site-generated traffic estimates are determined through a process known as trip generation. Rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the Trip Generation Manual1 published by the Institute of Transportation Engineers (ITE). ITE has established trip rates in nationwide studies of many types of land uses. This process was used to find both the existing and the proposed site trip generation. For the existing site, Kimley-Horn used the Campground/Recreation Vehicle Park (ITE 416) rates for the morning and afternoon peak hours of generator volumes with the existing 73 campground sites. For the proposed site, Single Family Detached Housing (ITE 210) was used for traffic associated with this redevelopment during the morning and afternoon peak hour of generator. The following Table 1 summarizes the estimated trip generation for traffic associated with the development (calculations attached). 1 Institute of Transportation Engineers, Trip Generation Manual, Twelfth Edition, Washington DC, 2025.  NORTH Ami’s Acres 096671019 Page 3 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Table 1 – Ami’s Acres Traffic Generation Comparison Land Use and Size AM Peak Hour of the Generator PM Peak Hour of the Generator In Out Total In Out Total Existing Site Use Campground/Recreational Vehicle Park (ITE 416) 73 Campsites 7 11 18 19 11 30 Proposed Site Use Single Family Detached Housing (ITE 210) 98 Dwelling Units 20 54 74 60 35 95 Net Difference in Trips +13 +43 +56 +41 +24 +65 As shown in the table and based on ITE Trip Generation calculations, the proposed redevelopment of Ami’s Acres to 98 residential homes is expected to generate approximately 74 trips during the morning peak hour of the generator and 95 trips during the afternoon peak hour of the generator. Since the existing Ami’s Acres Campground with 73 campsites is calculated to generate 18 morning peak hour trips and 30 afternoon peak hour trips during the generator, this equates to 56 more morning peak hour trips and 65 more afternoon peak hour trips than the current trips being generated by the development area with 73 camping sites. As this traffic increase is anticipated to be approximately just one vehicle every minute during the afternoon peak hour, the redevelopment project traffic volume will be easily accommodated on the surrounding street network. TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT Distribution of site traffic to the project accesses was based on the existing counts as well as the likely use of each access based on the development site plan. The directional distribution of traffic is a means to quantify the percentage of site-generated traffic that approaches the site from a given direction and departs the site back to the original source. The traffic assignment was obtained by applying the project trip distribution to the estimated traffic generation of the development shown in Table 1. Figure 3 illustrates the trip distribution and Figure 4 illustrates the traffic assignment for this project, including the proposed new 98 dwelling units and traffic generated by the two (2) homes to remain. TOTAL (BACKGROUND PLUS PROJECT) TRAFFIC Site traffic volumes were added to the through traffic volumes unrelated to the current site, to represent estimated total traffic conditions for the build out horizon. The total traffic volumes for the study area are illustrated in Figure 5. Highway 6 is projected to have a daily volume of approximately 1,070 vehicles per day to the east of Ami’s Acres, which is well under the capacity of the two-lane roadway. As such, this roadway was constructed to accommodate a daily traffic volume of 18,000 vehicles per day. This future daily volume represents approximately 6 percent of the roadway capacity. Ami’s Acres 096671019 Page 4 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 TRAFFIC OPERATIONS ANALYSIS METHODOLOGY Kimley-Horn’s analysis of traffic operations in the site vicinity was conducted to determine potential capacity deficiencies at the project key intersections for the opening horizon. The acknowledged source for determining overall capacity is the Highway Capacity Manual2. Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. It ranges from A (very little delay) to F (long delays and congestion). For intersections and roadways, standard traffic engineering practice recommends LOS D as the minimum threshold for acceptable operations for intersections and LOS E for movements. Table 2 below shows the definition of level of service for signalized and unsignalized intersections. Table 2 – Level of Service Definitions Level of Service Signalized Intersection Average Total Delay (sec/veh) Unsignalized Intersection Average Total Delay (sec/veh) A ≤ 10 ≤ 10 B > 10 and ≤ 20 > 10 and ≤ 15 C > 20 and ≤ 35 > 15 and ≤ 25 D > 35 and ≤ 55 > 25 and ≤ 35 E > 55 and ≤ 80 > 35 and ≤ 50 F > 80 > 50 Transportation Research Board, Highway Capacity Manual, Seventh Edition, Washington DC, 2022. Project accesses were analyzed based on average total delay analysis for unsignalized intersections. Under the unsignalized analysis, the LOS for a two-way stop-controlled intersection is determined by the computed or measured control delay and is defined for each minor movement. LOS for a two-way stop-controlled intersection is not defined for the whole intersection. Calculations for the level of service at the key intersections identified for the study are attached. The traffic analysis is based on the lane geometry and intersection control shown in Figure 2. The peak hour factor was used as determined by the existing turning movement counts. Synchro traffic analysis software was used to analyze the study area key intersection drives for level of service. The Synchro Highway Capacity Manual (HCM) methodology reports were used to analyze intersection delay and level of service. Project Accesses Operational Analysis The East Access (#1) and West Access (#2) along the US-6 Frontage Road both operate under assumed stop control for the southbound movements. With the existing lane configurations and the addition of project traffic, the movements at these access intersections are expected to operate acceptably at LOS A during both peak hours with full buildout of the residential neighborhood. Therefore, no improvements or modifications are anticipated to be needed at these access intersections based on the addition of project traffic and this operational analysis. Although R1-1 “STOP” signs are recommended to be installed for the southbound approaches to Highway 6 at both accesses. Table 3 provides the results of the level of service at both the East Access (#1) and West Access (#2) intersections along US-6 Frontage Road. 2 Transportation Research Board, Highway Capacity Manual, Seventh Edition, Washington DC, 2022. Ami’s Acres 096671019 Page 5 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Table 3 – US-6 Frontage Road Access LOS Results Scenario AM Peak Hour PM Peak Hour Delay LOS Delay LOS (sec/veh) (sec/veh) East Access (#1) Southbound Approach 9.1 A 9.1 A West Access (#2) Southbound Approach 8.8 A 8.8 A CDOT ACCESS PERMIT AND TURN LANE REQUIREMENTS The threshold for requiring an access permit along CDOT roadways occurs when project traffic is anticipated to increase the existing access traffic volume by more than 20 percent. Based on traffic projections, the addition of project traffic on the north legs of the US-6 Frontage Road at both accesses is anticipated to increase existing traffic volumes by more than 20 percent. Therefore, CDOT Access Permits are anticipated to be needed at both access intersections in association with this project. Auxiliary turn lane requirements were evaluated based on the State of Colorado State Highway Access Code for the Highway 6 accesses. The US-6 Frontage Road is assumed to be categorized as F-R: Frontage Road adjacent to Ami’s Acres. According to the State Highway Access Code for category F-R roadways, the following thresholds apply for implementation of auxiliary turn lanes: • A left turn lane with storage length plus taper is required for any access with a projected peak hour left ingress turning volume greater than 25 vph. If the posted speed is greater than 40 mph, a deceleration lane and taper is required for any access with a projected peak hour left ingress turning volume greater than 10 vph. The taper length will be included within the deceleration length. • A right turn lane with storage length plus taper is required for any access with a projected peak hour right ingress turning volume greater than 50 vph. If the posted speed is greater than 40 mph, a right turn deceleration lane and taper is required for any access with a projected peak hour right ingress turning volume greater than 25 vph. The taper length will be included within the deceleration length. • A right turn acceleration lane is required for any access with a projected peak hour right turning volume greater than 50 vph when the posted speed on the highway is greater than 40 mph and the highway has only one lane for through traffic in the direction of the right turn. • A left turn acceleration lane is generally not required for roadways posted less than 40 miles per hour except as may be determined by subsection 3.5. Based on these thresholds and warrants contained in the Access Code, the F-R (Frontage Road) designation of the US-6 Frontage Road, a 40-mph posted speed limit, and the anticipated project traffic volumes are as follows: East Access (#1) • An eastbound left turn deceleration lane is not warranted based on the projected background plus project traffic being zero (0) eastbound left turns during the afternoon peak hour and the threshold being 25 vehicles per hour. • A westbound right turn deceleration lane is not warranted based on the projected background plus project traffic being 40 westbound right turns during the afternoon peak hour and the threshold being 50 vehicles per hour. Ami’s Acres 096671019 Page 6 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 West Access (#2) • An eastbound left turn deceleration lane is not warranted based on the projected background plus project traffic being zero (0) eastbound left turns during the afternoon peak hour and the threshold being 25 vehicles per hour. • A westbound right turn deceleration lane is not warranted based on the projected background plus project traffic being 21 westbound right turns during the afternoon peak hour and the threshold being 50 vehicles per hour. CONCLUSIONS AND RECOMMENDATIONS Based on the traffic analysis presented in this report, Kimley-Horn believes that the redevelopment of Ami’s Acres from a 73-campsite campground to a residential neighborhood with up to 98 new homes plus the existing two (2) homes to remain will be successfully incorporated into the existing roadway network. US-6 Frontage Road is projected to have a daily volume of approximately 1,070 vehicles per day to the east of the site, which is well under the 18,000 vehicles per day capacity of the two-lane roadway. As such, this roadway was constructed to accommodate a daily traffic volume almost 20 times the amount of future traffic anticipated to be assigned to Highway 6 east of Ami’s Acres. It is recommended that R1-1 “STOP” signs be installed on the southbound exiting approach for both accesses to US-6 Frontage Road. Figure 6 attached outlines the recommendations from our traffic analysis including these STOP signs. It is expected that CDOT will require Access Permits for both access intersections along US-6 Frontage Road. No offsite transportation improvements are expected to be needed in associating with this redevelopment project. If you have any questions or require anything further, please feel free to call me at (303) 228-2304. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Curtis D. Rowe, P.E., PTOE Senior Vice President 02/16/2026 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Figures 35% 65% [35%] [65%] 1 35% [35%] 2 7(21) 19(13) 2 7(21) 13(40) 19(13) 36(23) 1 5(5) 7(21) 5(5) 19(13) 2 12(26) 13(40) 24(18) 36(23) 1 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Trip Generation Worksheets Project Subject Designed by Date Job No. Checked by Date Sheet No.of TRIP GENERATION MANUAL TECHNIQUES ITE Trip Generation Manual 12th Edition, Average Rate Equations Land Use Code - Campground/Recreational Vehicle Park (416) Independent Variable - Occupied Campsites (X) X =73 T = Average Vehicle Trip Ends Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (Series 400 Page 37) Average Weekday Directional Distribution: 36%ent.64%exit. (T) = 0.21(X) T =15 Average Vehicle Trip Ends (T) = 0.21 * (73.0)6 entering 9 exiting 6 +9 =15 Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (Series 400 Page 38) Average Weekday Directional Distribution: 65%ent.35%exit. (T) = 0.27 (X) T =20 Average Vehicle Trip Ends (T) = 0.27 * (73.0)13 entering 7 exiting 13 +7 =20 AM Peak Hour of Generator (Series 400 Page 39) Average Weekday Directional Distribution: 36%ent.64%exit. (T) = 0.25(X) T =18 Average Vehicle Trip Ends (T) = 0.25 * (73.0)7 entering 11 exiting 7 +11 =18 PM Peak Hour of Generator (Series 400 Page 40) Average Weekday Directional Distribution: 62%ent.38%exit. (T) = 0.41 (X) T =30 Average Vehicle Trip Ends (T) = 0.41 * (73.0)19 entering 11 exiting 19 +11 =30 Curtis D. Rowe Trip Generation for Campground/Recreational Vehicle Park Ami's Acres - Existing Campground 096671019January 27, 2026 Project Subject Designed by Date Job No. Checked by Date Sheet No.of TRIP GENERATION MANUAL TECHNIQUES ITE Trip Generation Manual 12th Edition, Average Rate Equations Land Use Code - Single-Family Detached Housing (210) Independent Variable - Dwelling Units (X) X =98 T = Average Vehicle Trip Ends Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (Page 232) Average Weekday Directional Distribution: 27%ent.73%exit. (T) = 0.70(X) T =69 Average Vehicle Trip Ends (T) = 0.70 * (98.0)19 entering 50 exiting 19 +50 =69 Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (Page 233) Average Weekday Directional Distribution: 62%ent.38%exit. (T) = 0.93 (X) T =91 Average Vehicle Trip Ends (T) = 0.93 * (98.0)57 entering 34 exiting 57 +34 =91 AM Peak Hour of Generator (Page 234) Average Weekday Directional Distribution: 27%ent.73%exit. (T) = 0.75(X) T =74 Average Vehicle Trip Ends (T) = 0.75 * (98.0)20 entering 54 exiting 20 +54 =74 PM Peak Hour of Generator (Page 235) Average Weekday Directional Distribution: 63%ent.37%exit. (T) = 0.97 (X) T =95 Average Vehicle Trip Ends (T) = 0.97 * (98.0)60 entering 35 exiting 60 +35 =95 Weekday (Page 231) Average Weekday Directional Distribution: 50%ent.50%exit. (T) = 9.09 (X) T =892 Average Vehicle Trip Ends (T) = 9.09 * (98.0)446 entering 446 exiting 446 +446 =892 Curtis D. Rowe Trip Generation for Single-Family Detached Housing Ami's Acres - Proposed Redevelopment 096671019February 16, 2026 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Intersection Capacity Analysis Outputs HCM 7th TWSC Total AM 1: Frontage Road & East Access 02/16/2026 Synchro 12 Report Page 1 Intersection Int Delay, s/veh 3.8 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 24 12 13 36 0 Future Vol, veh/h 0 24 12 13 36 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized -None -None -None Storage Length ----0 - Veh in Median Storage, #-0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 63 63 63 63 63 63 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 38 19 21 57 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 40 0 -0 67 29 Stage 1 ----29 - Stage 2 ----38 - Critical Hdwy 4.12 ---6.42 6.22 Critical Hdwy Stg 1 ----5.42 - Critical Hdwy Stg 2 ----5.42 - Follow-up Hdwy 2.218 ---3.518 3.318 Pot Cap-1 Maneuver 1570 ---938 1045 Stage 1 ----993 - Stage 2 ----984 - Platoon blocked, %--- Mov Cap-1 Maneuver 1570 ---938 1045 Mov Cap-2 Maneuver ----938 - Stage 1 ----993 - Stage 2 ----984 - Approach EB WB SB HCM Ctrl Dly, s/v 0 0 9.09 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1570 ---938 HCM Lane V/C Ratio ----0.061 HCM Ctrl Dly (s/v)0 ---9.1 HCM Lane LOS A ---A HCM 95th %tile Q(veh)0 ---0.2 HCM 7th TWSC Total PM 1: Frontage Road & East Access 02/16/2026 Synchro 12 Report Page 1 Intersection Int Delay, s/veh 2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 18 26 40 23 0 Future Vol, veh/h 0 18 26 40 23 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized -None -None -None Storage Length ----0 - Veh in Median Storage, #-0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 72 72 72 72 72 72 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 25 36 56 32 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 92 0 -0 89 64 Stage 1 ----64 - Stage 2 ----25 - Critical Hdwy 4.12 ---6.42 6.22 Critical Hdwy Stg 1 ----5.42 - Critical Hdwy Stg 2 ----5.42 - Follow-up Hdwy 2.218 ---3.518 3.318 Pot Cap-1 Maneuver 1503 ---912 1000 Stage 1 ----959 - Stage 2 ----998 - Platoon blocked, %--- Mov Cap-1 Maneuver 1503 ---912 1000 Mov Cap-2 Maneuver ----912 - Stage 1 ----959 - Stage 2 ----998 - Approach EB WB SB HCM Ctrl Dly, s/v 0 0 9.09 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1503 ---912 HCM Lane V/C Ratio ----0.035 HCM Ctrl Dly (s/v)0 ---9.1 HCM Lane LOS A ---A HCM 95th %tile Q(veh)0 ---0.1 HCM 7th TWSC Total AM 2: Frontage Road & West Access 02/16/2026 Synchro 12 Report Page 1 Intersection Int Delay, s/veh 4.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 5 5 7 19 0 Future Vol, veh/h 0 5 5 7 19 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized -None -None -None Storage Length ----0 - Veh in Median Storage, #-0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 50 50 50 50 50 50 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 10 10 14 38 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 24 0 -0 27 17 Stage 1 ----17 - Stage 2 ----10 - Critical Hdwy 4.12 ---6.42 6.22 Critical Hdwy Stg 1 ----5.42 - Critical Hdwy Stg 2 ----5.42 - Follow-up Hdwy 2.218 ---3.518 3.318 Pot Cap-1 Maneuver 1591 ---988 1062 Stage 1 ----1006 - Stage 2 ----1013 - Platoon blocked, %--- Mov Cap-1 Maneuver 1591 ---988 1062 Mov Cap-2 Maneuver ----988 - Stage 1 ----1006 - Stage 2 ----1013 - Approach EB WB SB HCM Ctrl Dly, s/v 0 0 8.79 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1591 ---988 HCM Lane V/C Ratio ----0.038 HCM Ctrl Dly (s/v)0 ---8.8 HCM Lane LOS A ---A HCM 95th %tile Q(veh)0 ---0.1 HCM 7th TWSC Total PM 2: Frontage Road & West Access 02/16/2026 Synchro 12 Report Page 1 Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 5 5 21 13 0 Future Vol, veh/h 0 5 5 21 13 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized -None -None -None Storage Length ----0 - Veh in Median Storage, #-0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 56 56 56 56 56 56 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 9 9 38 23 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 46 0 -0 37 28 Stage 1 ----28 - Stage 2 ----9 - Critical Hdwy 4.12 ---6.42 6.22 Critical Hdwy Stg 1 ----5.42 - Critical Hdwy Stg 2 ----5.42 - Follow-up Hdwy 2.218 ---3.518 3.318 Pot Cap-1 Maneuver 1561 ---976 1048 Stage 1 ----995 - Stage 2 ----1014 - Platoon blocked, %--- Mov Cap-1 Maneuver 1561 ---976 1048 Mov Cap-2 Maneuver ----976 - Stage 1 ----995 - Stage 2 ----1014 - Approach EB WB SB HCM Ctrl Dly, s/v 0 0 8.78 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1561 ---976 HCM Lane V/C Ratio ----0.024 HCM Ctrl Dly (s/v)0 ---8.8 HCM Lane LOS A ---A HCM 95th %tile Q(veh)0 ---0.1 kimley-horn.com 6200 South Syracuse Way Suite 300, Greenwood Village, CO 80111 303 228 2300 Conceptual Site Plan US - 6 INTERSTATE 70 (WB) INTERSTATE 70 (EB) 5734.30 667 20.00' 20.00' Access and Utility easement as per Amichaux Exemption plat.20.00' Found No. 5 Rebar Found Rebar W/Plas. Cap, PLS NO. 15710 Found CDOH Conc. R.O.W. marker Exemption Parcel No. 2 7.495 Acres Access and Utility easement as per Amichaux Exemption plat. 20.00' Overhead Utility Line(s) Overhead Utility Line(s) R 20' EV STUDIO 3 PLEX (41) 3-STORY TANDEM GARAGE 3BD/2BA 1312 SF (1968 SF W/ GARAGE) BOZEMAN - SMALL (11) 2-STORY 2-CAR GARAGE 2BD/2BA 1327 SF (1792 SF W/ GARAGE) BOZEMAN - LARGE (9) 3-STORY 2-CAR GARAGE ~4BD/3BA 2607 SF (3072 SF W/ GARAGE) 28'-0" 32 ' - 0 " 16'-0" 41 ' - 0 " UNIT TYPES: LODGE (19) 2-STORY 2 SURFACE PARKING 2BD/2.5BA 1152 SF 36 ' - 0 " 16'-0" BOZEMAN - MEDIUM (16) 2-STORY 2-CAR GARAGE 2BD/2BA 1583 SF (2048 SF W/ GARAGE) 32 ' - 0 " 32 ' - 0 " 32'-0" 32'-0" LODGE + GARAGE (2) 2-STORY 2-CAR GARAGE 2BD/2.5BA 1152 SF (1593SF W/ GARAGE) 16'-0" 21'-0" 21 ' - 0 " 36 ' - 0 " JOB NO: ISSUE RECORD: REVISIONS: DATE:PROGRESS DOCUMENTSNOT FORCONSTRUCTIONTHIS DRAWING HAS BEEN PREPARED BY THE ARCHITECT OF RECORD OR UNDER HIS DIRECT SUPERVISION AS AN INSTRUMENT OF SERVICE AND IS INTENDED FOR USE ONLY ON THIS PROJECT. ALL DRAWINGS, SPECIFICATIONS, IDEAS, AND DESIGNS, INCLUDING THE OVERALL LAYOUT, FORM, ARRANGEMENT, AND COMPOSITION OF SPACES AND ELEMENTS PORTRAYED, CONSTITUTE THE ORIGINAL UNPUBLISHED WORK OF THE ARCHITECT. ANY REPRODUCTION, USE, OR DISCLOSURE OF THE INFORMATION CONTAINED HERE-IN WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT IS STRICTLY PROHIBITED. THE ARCHITECT DISCLAIMS RESPONSIBILITY FOR ANY EXISTING BUILDING STRUCTURE, SITE CONDITIONS, EXISTING CONSTRUCTION ELEMENTS OR ANY DOCUMENTS DRAWINGS OR OTHER INSTRUMENTS USED FOR ANY PART OF THIS PROJECT WHICH DO NOT BEAR THE ARCHITECT'S SEAL. THE ARCHITECT'S SERVICES ARE UNDERTAKEN ON IN THE INTEREST OF THE PROJECT OWNER. NO OBLIGATION IS ASSUMED BY THE ARCHITECT FOR THE BENEFIT OF ANY OTHER ENTITY. RELATED DOCUMENTS: THIS DRAWING IS A SINGLE COMPONENT OF AN INTEGRATED SET OF CONSTRUCTION DOCUMENTS. GENERAL AND SUPPLEMENTARY CONDITIONS OF THE CONTRACT, GENERAL REQUIREMENTS, SPECIFICATIONS, AND OTHER DRAWINGS MAY AFFECT THE WORK DESCRIBED. FAILURE TO REVIEW AND INTEGRATE THE DESIGN INTENT OF THE WHOLE OF THE CONSTRUCTION DOCUMENTS DOES NOT RELIEVE THE CONTRACTOR FROM PROVIDING A COMPLETE PROJECT. COMPLY WITH ALL LAWS CODES, ORDINANCES AND REGULATIONS WITH THE AUTHORITIES HAVING JURISDICTION, AND WITH REQUIREMENTS OF THE LANDLORD IF REQUIRED AS PART OF THE WORK CONTAINED WITHIN. DO NOT START WORK UNTIL ALL PERMITS AND REQUIRED APPROVALS ARE OBTAINED. VERIFY ALL ACTUAL CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES VERIFICATION AND ACCEPTANCE OF ALL EXISTING CONDITIONS. APPLICATION OF A MATERIAL OR EQUIPMENT ITEM TO WORK INSTALLED BY OTHERS CONSTITUTES ACCEPTANCE OF THAT WORK, AND ASSUMPTION OF RESPONSIBILITY FOR SATISFACTORY INSTALLATION. DIMENSIONS SHOWN ARE TO FACE OF STRUCTURAL MATERIAL UNLESS OTHERWISE INDICATED CALCULATE AND READ DIMENSIONS, DO NOT SCALE THESE DRAWINGS. 1330 BURLINGTON STREET, SUITE 201 NORTH KANSAS CITY, MISSOURI 64116 816.715.1392 2/23/2026 3:47:50 PM 26-001 A0.00 GL E N W O O D S P R I N G S , C O ARCHITECTURAL SITE PLAN AM I ' S A C R E S XX.XX.2026 SD PACKAGE 1" = 50'-0"1 SITE PLAN