Loading...
HomeMy WebLinkAboutOWTS Installation Observations 07.23.2026 OWTS Certificate of Inspection July 23, 2026 Golden Project 439 Westbank Road Glenwood Springs, CO 81601 Parcel No. 2395-021-02-009 Lot 9 Westbank Ranch Subdivision The onsite wastewater treatment system (OWTS) installation of reference was observed by this office on May 15, 2026. The system was found to generally conform with the plans and specifications set forth in the OWTS design prepared by this office on March 18, 2025. Observations are limited to components that were visible at the time of the inspection. The quality of the installation is dependent on the expertise of the installer, soil type, and weather conditions. This observation is not a guarantee of workmanship and/or parts and materials. Setback of OWTS components from property lines and easements are based on information provided by owner or owner’s representative. Soil cap and final grading associated with any OWTS components are not included in this certification. Copies of the engineered plan are on file at the Mesa County Building Department or may be obtained from the undersigned design engineer. Any additional OWTS construction must be completed according to the county regulations. Seal Kachayla Schroeder, P.E.