Loading...
HomeMy WebLinkAboutArchitects ResponseGarfield County Community Development Department 03/28/2023 Owner: IRMW LLC P.O. Box 1037 Carbondale, CO 81623 Architect: Jordan Architecture P.O. Box 1031 Glenwood Springs, CO 81602 Contractor: Tally Ho Construction P.O. Box 188 Rifle, C 81650 Re: Corrections and Conditions of Approval Job Address: 1058 County Road 100 Dear Jordan Architecture, The County Building Department has performed the review on the building permit application and plans for the new building proposed at the above address. There are items that need to be addressed prior to considering issuance of the building permit and items that can be addressed after the issuance of the building permit. Please provide a response letter addressing each item listed in the "Items to address prior to issuing a building permit". Response not required for the "Conditions to be addressed during construction" but please address if clarification is needed. Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for the resubmittal. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Corrections to address prior to issuing a building permit: 1'" Please provide a full site plan showing all the improvements and easements on the property. It's difficult to determine the proposed location of the new building in relation to other buildings, improvements and easements. Survey Updated 2 Please provide a code analysis, Type of Construction, Occupancy Classification, fire suppression, allowable building area, allowable building height, occupant loads, separated or non -separated uses, incidental uses, accessibility, etc. We've added a code analysis on our cover sheet 3 The building square footage including the upper level is approximately 10,813.33 square feet. Assuming this is a Type 1113 (see previous comment about a code analysis) please provide a fire suppression system to serve the building. (Amendment to the IFC requires fire suppression if the square footage including all levels are more than 9000 sq. ft.) Building to be Type II -A, which allows area up to 12,000 S.F. without a fire suppression system. All bearing walls, primary structural frame, and floor assembly (including secondary structural members) will need to be 1 hour rated. Notes added to A5.1 sections. 4 I Tease provide Civil Drawings showing how, but not limited to parking, roof drainage, surface drainage, will be addressed. (IBC 107 and IBC 1804.4 Parking layout and drainage shown on architectural site plan 5 Please provide a parking plan with the required number of parking spaces. (UDC 7-302) • Office: 2413.33/250 = 9.65 = 10 spaces Warehouse: 8500/2000 = 4.2 = 5 Spaces Same as response to item 4. 6 Please provide accessible parking spaces and associated details to verify compliance. Please include the accessible route from the space into the building. (IBC 1106 and ANSI A117.1) Accessible parking space details added to A5.4. Route noted on site plan. 7 Please show the 30' Holy Cross Easement on the Survey and on the Site Plans. Survey Updated 8 Please provide a licensing agreement from Holy Cross to allow the septic tank and leach field in the easement. Provided 9 The new building is shown in the recorded Cattle Easement. Please address accordingly. Building location adjusted to sit outside of easement 10 Please provide a site -specific soils report. It shall address soils, geological conditions, geological hazards, ground water, debris flow potential, and rock fall. (Plat Note #2) 2021 SOILS REPORT PROVIDED. 11 Please show compliance with the Town of Carbondale Watershed Protection Requirements 'and permitting as required. (Plat Note #5) Tally Ho Construction will maintain proper storm water management for its building construction. The current entrance to the site serves as an active driveway to multiple businesses. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 945-8212 12 Provide proof of adequate, reliable, physical, long-term and legal water supply to serve the uses in the building. (UDC 7-104) Water supply shown on architectural site plan. 13 Please show where the non -potable water system is supplied from and include all requirements in the IPC Chapter 13 on the drawings. Hydrant location shown on site plan. The well is existing on Parcel 1A and will supply the water tanks. 14 The stackable washer and dryer do not comply with the required reach ranges, please address accordingly. (ANSI Al 17.1 — 611) Layout for room revised. Reach ranges shown on plan. Detail added to accessibility sheets. 15 A water X is shown in the same room as the washer and dryer. Please show that the clear floor space for the washer and dryer is compliant. (ANSI Al 17.1 — 611) Layout for room revised for compliance. 15 The detail for the restroom on sheet A5.3 does not match the dimensions on the floor plans. The lavatories are not to be in the required 60" water closet clearances. Please revise all the restrooms to comply. (ANSI Al 17.1 — 604) Restroom layouts updated to meet accessibility requirements 17 Please show the 5' turning space in all the restrooms. Doors shall not swing into the clear floor space or clearance for any fixture. (ANSI All 17.1 — 603.2) Turning space shown 18 Please show adequate details for the shower on the upper level to verify accessibility compliance. (ANSI Al 17.1 - 608) Shower dimensions updated and details added 19 The Toilet and Grab Bar Clearances shown on Sheet A5.3 are missing the required vertical grab bar. Please add it to the details. (ANSI Al 17.1 — 604.5) Detail updated to include additional grab bar 20 All doors to the restrooms and to the offices are to maintain 32" in the clear, typically a 36" wide door is compliant. Please change accordingly. (ANSI Al 17.1 — 404.2.2) Updated 21 Please add emergency lights outside of each exit door. (IBC1008.3.2) See MEP response ay other 22 Please add landings outside each exit door. (IBC 1010.1.6) Landings noted at exterior doors. Threshold detail provided on A5.3. 23 Please show handrails on both sides of the stairs with the required extensions. (IBC 1014) Handrails shown on plan and detail provided. 24 The common path of travel from the upper level exceeds the allowed 75'. Provide a second exit from the upper level. (IBC Table 1006.3.1) Stair landing to be set at exterior grade. Stair shown with path of travel more clearly. 25 Please show on the plans the required continuous air barrier, show air -sealing details across all joints and seams, and how penetrations will be sealed. (IECC C402.5) Sheet A5.5 with air sealing details added 26 Please provide cross sections showing insulation details for the roof, walls and slab on grade perimeter insulation. (IECC C402) This was provided with the additional submittal. Additional section cut and notes added for clarity. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 945-8212 27 Please provide U-Values for all the exterior doors including garage doors and exterior windows. Include the manufacturer and model for verification of compliance. (IECC C402) Notes added to cover sheet. 28 Provide ComCheck Reports for the Envelope, Mechanical and Lighting. (Garfield County Commercial Checklist) MEP engineer has provided the ComCheck for Mechanical and Lighting. Envelope ComCheck provided. We show insulation with values that meet the current building code. 29 Please provide mechanical ventilation and outdoor air for the interior office on the main level that has no window to the outside. (IBC 1203.1 and IMC 403) See MEP response by other 30 The TD-1's have a 4" outlet that transition to 2" Building Drains and 2" Building Sewers. Changes in size shall not be reduced in the direction of flow. Please address the pipe size accordingly. (IPC 704.2) See MEP response by other 31 P-1.1 —The Sand Oil Waste (SOW) is shown as a 2" diameter pipe outside Unit 6 but the SOW outside of Unit 3 is shown as a 4' diameter. Please show where the transition is going to take place (please see the previous correction which could address this correction). See MEP response by other 32 Cleanouts for Building Sewers are required every 100'. Please add cleanouts to the horizontal SOW between Units 2 and 5. (IPC 708.1.2) See MEP response by other 33 Cleanouts for Building Sewers are required every 100'. Please add cleanouts to the horizontal Building Sewer at the end of the line and between Units 2 and 5. (IPC 708.1.2) See MEP response by other 34 Please add cleanouts to the SOW Building Drain in Unit 1. (IPC 708.1.1) See MEP response by other 35 The Sand and Oil Interceptor Detail indicates a 4" discharge pipe but the Plumbing Plan indicates a 3" discharge, please coordinate. (IPC 704.2) See MEP response by other 36 Please show the required heat traps on the water heater detail. (IECC C404.3) See MEP response by other 37 Please add the required occupancy sensors to all lighting specified in IECC C405.2.1 and C405.2.2. See MEP response by other 38 The lighting schedule provides "Tags A-H". The Lighting Plan does not contain tags associated with the schedule. Please label the fixtures per the Schedule. Any space with over 150 watts of lighting, please add daylighting controls. (IECC C405.2.3) See MEP response by other 39 Please provide Lighting Reductions Controls. (IECC C405.2.2.2) See MEP response by other 40 Please provide a Statement of Special Inspections. (IBC 1704.2.3) Special Inspection Report provided once building is erected. 41 From the Planning Director: 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Demonstration of compliance with the conditions of approval contained in the Director's Decision for the IRMW Minor Subdivision, dated 2/9/17 including but not limited to plat notes, building envelopes, geo-tech/debris flow/rock fall conditions, addressing, watershed protection permits, landscaping/revegetation, weed management, wildfire mitigation and infrastructure provisions including water. See attached letter. A1.2 sheet added with Planning Conditions of Approval. Note added to verify compliance in field. Conditions to be addressed during construction: The approved plans are to be on -site for inspections. Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www.colorado.gov/pacific/dora/DPO Electrical Plumbing Permits Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. Drainage across property lines shall not exceed that which existed prior to grading. Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of non -erosive down drains or other devices. All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. Separate Sign Permits are required for any external signs. Please contact the County Planner for the application. Electrical Code compliance will be determined based on field inspections performed by the State Electrical Inspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough -In inspection with the State Electrical Inspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal for that Fire District prior to backfilling. If the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump will be required to be one -hour construction. (IBC Table 508.2.5) Please provide special inspections reports to the Building Department as specified within the General Notes of the structural drawings. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 1500psf. Combustible material is limited in Type I and Type II Construction. See IBC 603 for allowed combustible materials. All exterior lighting is to be downcast and shielded. Safety glazing is not designated on the plans. Safety glazing will be checked during the framing and final inspection. (IBC 2406.4) Any membrane and through penetrations of the fire resistive construction will be required to be fire -stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (IBC 713) A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location. The clothes dryer installed in a closet will require 100 square inches of make-up air in the closet enclosure. (IMC 504.5) The walls surrounding the toilet are to be non -absorbent for a height of 48" and 2' past on each side of the toilet. (IBC 1210.2.2) The layout of some restrooms will require right-hand flush water closets. (ANSI Al 17.1 - 604.6) All shower head control walls are to be at the end of the required 48" maneuvering clearances in front of the shower. (ANSI Al 17.1 — 1004.11.3.1.1) All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI Al 17.1 — 404.2.6) Grab bar backing is to be in place for all toilets, bathtubs and showers at framing inspection. A passing blower door test for the offices is required to be submitted prior to issuing the Certificate of Occupancy. Any combustible storage over 12' to the top of the stored material is required to comply with The International Fire Code Chapter 32. All infrastructure piping and stormwater drainage is to be inspected by the engineer of record. A stamped letter from the engineer accepting all infrastructure installation is required prior to the final inspection. Both hot and cold water piping is to be insulated, specified in the plumbing general notes The electric meters may need vehicle protection, check with your electrical inspector. Sincerely, ,, - 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 945-8212 John Plano Building Official CC: IRMW LLC, Owner Katie, Tally Ho Construction Karl Oliver, Carbondale Fire Glenn Hartmann, Garfield County Community Development 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 21 Please add emergency lights outside of each exit door. (IBC1008.3.2) MEP EGRESS LIGHTS ADDED TO PLAN. 28 Provide ComCheck Reports for the Envelope, Mechanical and Lighting. (Garfield County Commercial Checklist) COMM Check Provided 29 Please provide mechanical ventilation and outdoor air for the interior office on the main level that has no window to the outside. (IBC 1203.1 and IMC 403) MEP. ' ADDED EXHAUST FAN AND MAKE-UP AIR 30 The TD-1's have a 4" outlet that transition to 2" Building Drains and 2" Building Sewers. Changes in size shall not be reduced in the direction of flow. Please address the pipe size accordingly. (IPC 704.2) MEP. ALL SAND AND OIL PIPING CALLED OUT AS 4" 31 P-1.1 — The Sand Oil Waste (SOW) is shown as a 2" diameter pipe outside Unit 6 but the SOW outside of Unit 3 is shown as a 4' diameter. Please show where the transition is going to take place (please see the previous correction which could address this correction). MEP SEE ABOVE 32 Cleanouts for Building Sewers are required every 100'. Please add cleanouts to the horizontal SOW between Units 2 and 5. (IPC 708.1.2) MEP DONE 33 Cleanouts for Building Sewers are required every 100'. Please add cleanouts to the horizontal Building Sewer at the end of the line and between Units 2 and 5. (IPC 708.1.2) MEP DONE 34 Please add cleanouts to the SOW Building Drain in Unit 1. (IPC 708.1.1) MEP DONE 35 The Sand and Oil Interceptor Detail indicates a 4" discharge pipe but the Plumbing Plan indicates a 3" discharge, please coordinate. (IPC 704.2) MEP DONE 36 Please show the required heat traps on the water heater detail. (IECC C404.3) MEP DONE 37 Please add the required occupancy sensors to all lighting specified in IECC C405.2.1 and C405.2.2. MEP OCCUPANCY SENSORS HAVE BEEN ADDED IN THE LOCATIONS LISTED IN 405.2.1 38 The lighting schedule provides "Tags A-H". The Lighting Plan does not contain tags associated with the schedule. Please label the fixtures per the Schedule. Any space with over 150 watts of lighting, please add daylighting controls. (IECC C405.2.3) MEP ALL THE LIGHTS ARE MARKED WITH A SYMBOL LIKE " B-29" ON THE LIGHTING PLAN. THAT IS THE TAG AS SCHEDULED AND THE WATTS OF THE FIXTURE 39 Please provide Lighting Reductions Controls. (IECC C405.2.2.2) MEP LIGHTING REDUCTION CONTROLS HAVE BEEN ADDED EXECPT IN SPACES HAVING DAYLIGHTING CONTROLS 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 John Plano From: Kevin Schorzman <kschorzman@carbondaleco.net> Sent: Friday, May 1, 2026 2:22 PM To: John Plano Subject: RE: Proposed building on CR 100 The response to #11 is adequate. From: John Plano <jplano@garfieldcountyco.gov> Sent: Thursday, April 30, 2026 4:08 PM To: Kevin Schorzman <kschorzman@carbondaleco.net> Subject: RE: Proposed building on CR 100 Yeah, it's 1A... Summary Account R083968 Parcel 239335402001 Property 1058100 COUNTY RD, CARBONDALE, CO 81623 Address Legal Quarter SE Section_ 35 Township: 7 Range. 88 Subdivision: IRMW LLC Description PARCEL 1 Lot 1AAS PER MINOR SUBDIVISION PLAT RECEPTION NUMBER 893462_ Acres 57.773 Land SgFt 0 TaxArea 011 Subdivision IRMW LLC PARCEL 1 QMap Owner IRMW LLC P0BOX 1037 CARBON DALE CO 81623 John Plano Chief Building Official Garfield County Building Department 108 8th Street #401 Glenwood Springs, CO 81601 (970) 945-1377 Ext. 1560 From: Kevin Schorzman <kschorzman@carbondaleco.net> Sent: Thursday, April 30, 2026 3:30 PM To: John Plano <iplano@garfieldcountyco.gov> Subject: RE: Proposed building on CR 100 K Sorry to be dense on this, but is the proposed building actually on Lot 1A or 1 B? When I look at the site plans, I see reference to the lot line between 12 and 15 running through it which it doesn't look like actually happens on the plat that shows all the lots. From: John Plano <iplano@garfieldcountyco.gov> Sent: Thursday, April 30, 2026 2:10 PM To: Kevin Schorzman <1<schorzman@carbondaleco.net> Subject: Proposed building on CR 100 Hey Kev, Got a new building being proposed at 1058 CR 100. There's a plat note about C'dale's Water Shead Protection, below. Take a look at the response to #11. Is that an adequate response? In my 2"d correction letter I'm asking them to contact C'Dale and provide a letter of acceptance or are you good with their response? I'm also requesting actual Civil Drawings... 4j LAFTI�USUDFC rr�ai�iaaia�w�aiv r,a 4........ w ...,......�,-- --• --•- S) Future development on Lots 1A and 1B shall require compliance with Town of Carbondale Watershed Protection Requirements ar Thanks Man! Hope all's well! John Plano Chief Building Official Garfield County Building Department 108 8th Street #401 Glenwood Springs, CO 81601 (970) 945-1377 Ext. 1560 Garfield County's email domain has changed to @garfieldcountyco.gov. Please take a moment to update my contact information. John Plano To: brad Jordan Cc: katie@tallyhoconstruction.com; Karl Oliver; Glenn Hartmann; don vandevander Subject: RE: Proposed Building, 1058 CR 100 Attachments: 17-7-230 (04-07-17) Geologic Hazards.pdf Brad, Now that we received the Geologic Hazard Review Report, dated April 7, 2017, there are additional requirements to satisfy. Based on the report, attached, there are rock outcroppings with rock fall potential above the proposed building and debris flow concerns during a weather event. Please have the Geotech Engineers re-evaluate the recommendations in this report and provide guidance on a mitigation plan. The Geotech Report submitted dated Jan. 6, 2021, was only for foundation design. Sincerely, John Plano Chief Building Official Garfield County Building Department 108 8th Street #401 Glenwood Springs, CO 81601 (970) 945-1377 Ext. 1560 From: John Plano Sent: Monday, May 4, 2026 9:25 AM To: brad jordan <bradjordanarchitect@gmail.com> Cc: katie@tallyhoconstruction.com; Karl Oliver <koliver@carbondalefire.org>; Glenn Hartmann <GHartmann@garfieldcountyco.gov> Subject: Proposed Building, 1058 CR 100 Hi Brad, We still need more information to move this permit forward. Please see the attached letter. Sincerely, John Plano Chief Building Official Garfield County Building Department 108 8th Street #401 Glenwood Springs, CO 81601 (970) 945-1377 Ext. 1560