HomeMy WebLinkAboutSecond Correction LetterGarfield County Community Development Department 04/30/2023 Owner: IRMW LLC P.O. Box 1037 Carbondale, CO 81623 Architect: Jordan Architecture P.O. Box 1031 Glenwood Springs, CO 81602 Contractor Tally Ho Construction P.O. Box 188 Rifle, C 81650 Re: Corrections and Conditions of Approval Job Address: 1058 County Road 100 Dear Jordan Architecture, The County Building Department has performed a review on the response and drawings for the building permit application and for the new building proposed at the above address. There are items that need to be addressed prior to considering issuance of the building permit and items that can be addressed after the issuance of the building permit. Items addressed adequately have been removed. Please provide a response letter addressing each item listed in the "Items to address prior to issuing a building permit". Response not required for the "Conditions to be addressed during construction" but please address if clarification is needed. Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for the resubmittal. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Corrections to address prior to issuing a building permit: PI ase provide a code analysis, Type of Construction, Occupancy Classification, fire s ppression, allowable building area, allowable building height, occupant loads, separated r non -separated uses, incidental uses, accessibility, etc. The Code Analysis is referencing plywood on the roof and floor of the mezzanine. These areas are required to be non-combustible. (IBC 603) ,3 The building square footage including the upper level is approximately 10,813.33 square feet. Assuming this is a Type 1113 (see previous comment about a code analysis) please provide a fire suppression system to serve the building. (Amendment to the IFC requires fire suppression if the square footage including all levels are more than 9000 sq. ft.) The statement provided does not provide adequate information to verify compliance. Please provide the specific fireproofing product to be used and provide details. To utilize Type IIA Construction, fire proofing details need to be provided. The Primary Steel is to have individual protection. This will be the columns and the beams attached to the columns, beam to beam connections are secondary and are allowed to be within a fire -resistive wall or roof assemblies. Please provide details for each assembly and the UL listing it complies with. h" Please provide Civil Drawings showing how, but not limited to parking, roof drainage, surface drainage, will be addressed. (IBC 107 and IBC 1804.4) The site plan is not a Civil Drawing, provide drawings stamped by a civil engineer. The site plan indicates multiple arrows stating "2% slope to drain" There is no drain show on the plans. "Drainage across property lines shall not exceed that which existed prior to grading" The drawings do not indicate how the drainage will be contained on the site. 140 Please provide a site -specific soils report. It shall address soils, geological conditions, geological hazards, ground water, debris flow potential, and rock fall. (Plat Note #2) 21 A site specific geotechnical, soils, and foundation analysis shall be required for all new construction. The analysis shall address soils, geoNic conditions, geologic hazards, and groundwater concems, Compliance with the recommendations of the analysis shall be required. Engineered foundations may be requued pursuant to the findings and recommendation of the geotethnical and saHs analysis. Appropriate mitigation for geotechnical issues induding but not limited to debris flow potential and rockfall shall be designed at the time of building permit in accordance with the geotechnical and Sells analysis. The soils report submitted does not address the items listed in the plat notes. The report submitted refers to a previously conducted geological hazards review, which could address the plat notes. Please provide that report. y4' Please show compliance with the Town of Carbondale Watershed Protection Requirements and permitting as required. (Plat Note #5) 1 reached out to the Town of Carbondale for the applicant; the town has a well in the vicinity. I received an email stating approval from the Public Works Director. This comment is considered closed. y2-Provide proof of adequate, reliable, physical, long-term and legal water supply to serve the uses in the building. (UDC 7-104) Showing the tanks that are being fed from a well is not adequate proof of water. Please provide documentation that the well is allocated for this proposed commercial building. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 13 PI ase show where the non -potable water system is supplied from and include all re uirements in the IPC Chapter 13 on the drawings. e response is inadequate. The plumbing drawings are indicating non -potable water. the site plan does not include a non -potable water source and there is nothing showing compliance to Chapter 13. Please address the comment. Please show handrails on both sides of the stairs with the required extensions. (IBC 1014) Details could not be found on the plans. 'PThe common path of travel from the upper level exceeds the allowed 75'. Provide a second exit from the upper level. (IBC Table 1006.3.1) The new door proposed on the south side requires access to a public way or safe dispersal area. Sidewalk and steps maybe in order. (IBC 1028.5) KI!lease show on the plans the required continuous air barrier, show air -sealing details across all joints and seams, and how penetrations will be sealed. (IECC C402.5) The air sealing details provided are for wood framed construction. Please provide appropriate details. Please provide U-Values for all the exterior doors including garage doors and exterior windows. Include the manufacturer and model for verification of compliance. (IECC C402) All that was found was a note stating Window U-Value is .26, which is not the same U- Values as the ComCheck Report. Please provide the information requested. ,,4eF'Iease provide a Statement of Special Inspections. (IBC 1704.2.3) Yes, the building department is to receive special inspection during construction. Please provide what is requested. Please review the code section referenced and provide the "Statement of Special Inspections" that is required by code. It's typically in the general notes on structural sheets and is missing from this plan set. 1704.2.3 Statement of special inspections. The applicant shall submit a statement of special inspections in accordance with Section 107.1 as a condition for permit issuance. This statement shall be in accordance with Section 1704.3. 41 From the Planning Director: Demonstration of compliance with the conditions of approval contained in the Director's Decision for the IRMW Minor Subdivision, dated 2/9/17 including but not limited to plat notes, building envelopes, geo-tech/debris flow/rock fall conditions, addressing, watershed protection permits, landscaping/revegetation, weed management, wildfire mitigation and infrastructure provisions including water. See attached letter. The response is to verify in the field. Conditions to be addressed during construction: The approved plans are to be on -site for inspections. Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. httr)s://www.colorado.gov/pacific/dora/DPO Electrical Plumbing Permits 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. Drainage across property lines shall not exceed that which existed prior to grading. Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of non -erosive down drains or other devices. All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. Separate Sign Permits are required for any external signs. Please contact the County Planner for the application. Electrical Code compliance will be determined based on field inspections performed by the State Electrical Inspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough -In inspection with the State Electrical Inspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal for that Fire District prior to backfilling. If the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump will be required to be one -hour construction. (IBC Table 508.2.5) Please provide special inspections reports to the Building Department as specified within the General Notes of the structural drawings. Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 1500psf. Combustible material is limited in Type I and Type II Construction. See IBC 603 for allowed combustible materials. All exterior lighting is to be downcast and shielded Safety glazing is not designated on the plans. Safety glazing will be checked during the framing and final inspection. (IBC 2406.4) Any membrane and through penetrations of the fire resistive construction will be required to be fire -stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (IBC 713) 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location. The clothes dryer installed in a closet will require 100 square inches of make-up air in the closet enclosure. (IMC 504.5) The walls surrounding the toilet are to be non -absorbent for a height of 48" and 2' past on each side of the toilet. (IBC 1210.2.2) The layout of some restrooms will require right-hand flush water closets. (ANSI All 17.1 - 604.6) All shower head control walls are to be at the end of the required 48" maneuvering clearances in front of the shower. (ANSI All 17.1 — 1004.11.3.1.1) All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI Al 17.1 — 404.2.6) Grab bar backing is to be in place for all toilets, bathtubs and showers at framing inspection A passing blower door test for the offices is required to be submitted prior to issuing the Certificate of Occupancy. Any combustible storage over 12' to the top of the stored material is required to comply with The International Fire Code Chapter 32. All infrastructure piping and stormwater drainage is to be inspected by the engineer of record. A stamped letter from the engineer accepting all infrastructure installation is required prior to the final inspection. Both hot and cold water piping is to be insulated, specified in the plumbing general notes The electric meters may need vehicle protection, check with your electrical inspector. The clothes washer and dryer are to have front controls to comply with accessibility reach requirements. Sincerely, pvm ;v&aa John Plano Building Official CC: IRMW LLC, Owner Katie, Tally Ho Construction Karl Oliver, Carbondale Fire Glenn Hartmann, Garfield County Community Development 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)945-8212 Jordan Architecture Inc. PO Box 1031, Glenwood Springs, CO 81602 970-618-6690 bradjordanarchitect@gmail.com jordanarchitecture.com 1058 Countv Road 100 Responses 2. Construction Notes on cover updated to concrete over metal framing at mezzanine. 3. Floor -ceiling and wall assemblies added to section sheet. Monokote product selected and called out on section sheet. Information and UL listings provided in spec sheets. 4. See civil drawings by other. 10. See soils report by other 11. Closed per previous comment list. 12. See civil drawings/specs by other. 13. See civil/MEP by other. 23. Detail added to sheet A5.4. Extensions shown at top and bottom of stair. 24. See civil plans by other. 25. Air sealing details on A5.5 updated. 27. See door and window specs provided by contractor/applicant. 40. See special inspection statement provided by structural. 41. Items to be verified in field. Respectfully submitted, Jordan Architecture