HomeMy WebLinkAboutCommCheck ReporteCOMcheck Software Version COMcheckWeb
�J( Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
Construction Site:
2018 IECC
Carbondale, Colorado
5b
New Construction
8%
Owner/Agent:
Additional Efficiency Package(s)
Credits: 1.0 Required 1.0 Proposed
Enhanced Envelope Performance, 1.0 credit
Building Area Floor Area
1-steel building (Warehouse) : Nonresidential 8400
Envelope Assemblies
Designer/Contractor:
Assembly
Gross Area
Cavity Cont.
Proposed
Budget U-
or
R-Value R-Value
U-Factor
Factors.)
Perimeter
Roof: Metal Building, Screw Down, Liner System without
8400
20.0 19.0
0.047
0.035
Thermal Blocks, [Bldg. Use 1 - steel building]
Floor: Unheated Slab -On -Grade, Vertical 2 ft., [Bldg. Use 1 -
500
-- 15.0
0.520
0.540
steel building] (c)
NORTH
Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber
5752
0.0 19.0
0.050
0.052
(compressed at girt), [Bldg. Use 1 - steel building]
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
552
-- --
0.290
0.450
6'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
80
-- --
0.290
0.450
4'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building]
126
— —
0.140
0.370
Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 -
840
— —
0.130
0.310
steel building]
FACT
Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber
843
0.0 19.0
0.050
0.052
(compressed at girt), [Bldg. Use 1 - steel building]
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
24
-- --
0.290
0.450
6'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
16
-- --
0.290
0.450
4'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building]
21
— —
0.140
0.370
Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 -
336
— —
0.130
0.310
steel building]
Project Title: Report date: 04/21/26
Data filename: Page 1 of 12
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont. Proposed
R-Value U-Factor
Budget U-
Factor(.)
SOUTH
Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber
3391
0.0
19.0 0.050
0.052
(compressed at girt), [Bldg. Use 1- steel building]
Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building]
21
---
-- 0.140
0.370
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
336
- 0.290
0.450
6'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
32
—
-- 0.290
0.450
4'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density,
1890
0.0
15.0 0.057
0.090
Furring: Metal, [Bldg. Use 1 - steel building]
WEST
Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber
1003
0.0
19.0 0.050
0.052
(compressed at girt), [Bldg. Use 1 - steel building]
Window: Vinyl Frame: Operable, Perf. Specs.: Product ID
48
—
-- 0.290
0.450
6'x4' pella, SHGC 0.24, [Bldg. Use 1 - steel
building] (b)
Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building]
21
-
- 0.140
0.370
Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 -
168
-
- 0.130
0.310
steel building]
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c) Slab -On -Grade proposed and budget U-factors shown in table are F-factors.
Envelope.- ..
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title
Project Title:
Data filename:
Signature
Date
Report date: 04/21/26
Page 2 of 12
COMcheck Software Version COMcheckWeb
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Construction Site:
2018 IECC
New Construction
Owner/Agent:
Additional Efficiency Package(s)
Credits: 1.0 Required 1.0 Proposed
Enhanced Envelope Performance, 1.0 credit
Allowed Interior Lighting Power
.Lvoposed
Interior Lighting TBD: No lighting fixtures specified
Designer/Contractor:
Project Title: Report date: 04/21/26
Data filename: Page 3 of 12
COMcheck Software Version COMcheckweb
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
2018 IECC
New Construction
0 (Unspecified)
Owner/Agent:
Allowed Exterior Lighting Power
A
Area/Surface Category
Designer/Contractor:
B C D E
Quantity Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Total Tradable Watts (a) = o
Total Allowed Watts = a
Total Allowed Supplemental Watts (b) = 35C
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 350 watts may be applied toward compliance of both non -tradable and tradable
areas/surfaces.
ProposedPower
Exterior Lighting TBD: Exterior lighting zone not specified (see project screen)
Project Title: Report date: 04/21/26
Data filename: Page 4 of 12
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
2018 IECC
Carbondale, Colorado
5b
New Construction
Owner/Agent:
Additional Efficiency Package(s)
Credits: 1.0 Required 1.0 Proposed
Enhanced Envelope Performance, 1.0 credit
Mechanical Systems List
Quantity System Type & Description
Designer/Contractor:
Mechanical Compliance Statement
Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
ame - Title
Signature
Date
Project Title: Report date: 04/21/26
Data filename: Page 5 of 12
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
# I Plan Review
& Rea.ID i
C103.2 Plans and/or specifications provide all
[PR111 information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
C402.4.1 The vertical fenestration area <= 30
[PR10]1 percent of the gross above -grade wall
area.
C402.4.1 The skylight area <= 3 percent of the
[PR1111 gross roof area.
Complies?
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies
[]Does Not
❑Not Observable
❑Not Applicable
❑Complies
[]Does Not
[]Not Observable
❑Not Applicable
C402.4.2 In enclosed spaces > 2,500 ft2
❑Complies
[PR14]1 directly under a roof with ceiling
❑Does Not
heights >15 ft. and used as an office,
❑Not Observable
lobby, atrium, concourse, corridor,
storage, gymnasium/exercise center,
[]Not Applicable
convention center, automotive
service, manufacturing, non -
refrigerated warehouse, retail store,
distribution/sorting area,
transportation, or workshop, the
following requirements apply: (a) the
daylight zone under skylights is >=
half the floor area; (b) the skylight
area to daylight zone is >= 3 percent
with a skylight VT >= 0.40; or a
minimum skylight effective aperture
>= 1 percent.
C406 Plans, specifications, and/or ❑Complies
[PR9]1 calculations provide all information []Does Not
with which compliance can be
determined for the additional energy ❑Not Observable
efficiency package options. []Not Applicable
Additional Comments/Assumptions:
Comments/Assumptions
11 High Impact (Tier 1)_7 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Report date: 04/21/26
Data filename: Page 6 of 12
Section
Footing / Foundation Inspection
Complies? Comments/A:
& Req.ID
'C303.2
Slab edge insulation installed per
❑Complies
[F04]2
manufacturer's instructions.
❑Does Not
i
❑Not Observable
❑Not Applicable
C303.2.1
Exterior insulation protected against
❑Complies
[F06]1
damage, sunlight, moisture, wind,
❑Does Not
landscaping and equipment
❑Not Observable
maintenance activities.
[]Not Applicable
C105
Installed slab -on -grade insulation type
❑Complies See the Envelope Assemblies table fo
[F03]2
and R-value consistent with insulation
❑Does Not
specifications reported in plans and
❑Not Observable
COMcheck reports.
❑Not Applicable
C402.2.4
Slab edge insulation depth/length.
❑Complies See the Envelope Assemblies table Po
[F07]2
Slab insulation extending away from
❑Does Not
building is covered by pavement or
[]Not Observable
i
>= 10 inches of soil.
[]Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Report date: 04/21/26
Data filename: Page 7 of 12
Section
#
Framing / Rough -In Inspection
Complies?
& Rea.ID_
C303.1.3
Fenestration products rated in
[]Complies
i FR121 '
accordance with NFRC.
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products are certified as
❑Complies
[FR1311
to performance labels or certificates
❑Does Not
provided.
❑Not Observable
❑Not Applicable
C402.4.3
Vertical fenestration SHGC value.
❑Complies
[FR1011
❑Does Not
❑Not Observable
❑Not Applicable
C402.4.3,
Installed vertical fenestration U-factor
❑Complies
C402.4.3.
and SHGC consistent with label
❑Does Not
4
specifications and as reported in plans
❑Not Observable
[FR811
and COMcheck reports.
❑Not Applicable
C402.5.7
Vestibules are installed on all building
❑Complies
[FR17]3
entrances. Doors have self -closing
❑Does Not
devices.
❑Not Observable
[]Not Applicable
Additional Comments/Assumptions:
Comments/Assurn
See the Envelope Assemblies table for valu
See the Envelope Assemblies table for valu
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) '3 1 Low Impact (Tier 3) 1
Project Title: Report date: 04/21/26
Data filename: Page 8 of 12
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Re .ID
C402.5.5.
Stair and elevator shaft vents have
❑Complies
C403.2.4.
motorized dampers that automatically
❑Does Not
3
close. Refernece section C403.7.7 for
❑ Not Observable
[ME3]3
operational details.
j❑Not Applicable
C403.7.7 Outdoor air and exhaust systems have ❑Complies
[ME58)3 motorized dampers that automatically ❑Does Not
shut when not in use and meet
maximum leakage rates. Check ❑Not observable
gravity dampers where allowed. '❑Not Applicable
Reference section language for
operational details.
Additional Comments/Assumptions:
Project Title:
Data filename:
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Report date: 04/21/26
Page 9 of 12
Rough -In Electrical Inspection I Complies? I Comments
C405.6
Low -voltage dry -type distribution
❑Complies
[EL26]Z
electric transformers meet the
❑Does Not
minimum efficiency requirements of
❑Not Observable
Table C405.6.
❑Not Applicable
C405.7
Electric motors meet the minimum
❑Complies
[EL27]2
efficiency requirements of Tables
❑Does Not
C405.7(1) through C405.7(4).
[]Not Observable
Efficiency verified through certification
under an approved certification
❑Not Applicable
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
C405.8.2,
Escalators and moving walks comply
❑Complies
C405.8.2.
with ASME A17.1/CSA B44 and have
❑Does Not
1
automatic controls configured to
❑ Not Observable
[EL28]2
reduce speed to the minimum
❑Not Applicable
permitted speed in accordance with
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
_
C405.9
Total voltage drop across the
❑Complies
[EL29]2
combination of feeders and branch
[]Does Not
circuits <= 5%.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1) , 2 Medium Impact (Tier 2) ; 3 1 Low Impact (Tier 3)
Project Title: Report date: 04/21/26
Data filename: Page 10 of 12
Section
& Req.ID
C303.1
[IN3]1
C402.2.1
[IN20]1
C303.1
[IN10]2
C303.2
[IN7]1
C105
[IN6]1
C402.2.3
[INB]z
C402.2.6
J [IN18]3
C105
[IN2]1
C402.5.1.
1
[IN1]1
Insulation Inspection Complies?
Roof insulation installed per
❑Complies
manufacturer's instructions. Blown or
❑Does Not
poured loose -fill insulation is installed
[:]Not Observable
only where the roof slope is <=3 in
❑Not Applicable
12
Insulation installed on a suspended
❑Complies
ceiling having ceiling tiles is not being
❑Does Not
specified for roor/ceiling assemblies.
❑Not Observable
Continuous insulation board installed
❑Not Applicable
in 2 or more layers with edge joints
offset between layers.
Building envelope insulation is labeled
❑Complies
with R-value or insulation certificate
❑Does Not
providing R-value and other relevant
❑ Not Observable
data.
❑Not Applicable
Above -grade wall insulation installed
❑Complies
per manufacturer's instructions.
❑Does Not
❑Not Observable
❑Not Applicable
Comments/Assumptions
Installed above -grade wall insulation ❑Complies See the Envelope Assemblies table for values.
type and R-value consistent with ❑Does Not
insulation specifications reported in
plans and COMcheck reports. ❑Not Observable
[]Not Applicable
Installed floor insulation type and R- ❑Complies See the Envelope Assemblies table for values.
value consistent with insulation ❑Does Not
specifications reported in plans and ❑Not Observable
COMcheck reports.
❑Not Applicable
Radiant panels and associated ❑Complies
components, designed for heat ❑Does Not
transfer from the panel surfaces to the ❑Not Observable
occupants or indoor space are
insulated with a minimum of R-3.5. ❑Not Applicable
Installed roof insulation type and R- ❑Complies See the Envelope Assemblies table for values.
value consistent with insulation
❑Does Not
specifications reported in plans and
[:]Not Observable
COMcheck reports. For some ceiling
❑Not Applicable
systems, verification may need to
occur during Framing Inspection.
All sources of air leakage in the
❑Complies
building thermal envelope are sealed,
[]Does Not
caulked, gasketed, weather stripped
❑Not Observable
or wrapped with moisture vapor-
permeable wrapping material to
❑Not Applicable
minimize air leakage.
Additional Comments/Assumptions:
1 'High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Report date: 04/21/26
Data filename: Page 11 of 12
Section
T
#
Final Inspection
Complies?
& Req.ID
C402.5
Building envelope contains a
❑Complies
[FI5511
continuous air barrier that has been
❑Does Not
tested and deemed to limit air leakage
❑Not Observable
<= 0.40 cfm/ft2.
❑Not Applicable
C402.5.6
Weatherseals installed on all loading
❑Complies
[F137]1
dock cargo door openings and provide
❑Does Not
direct contact along the top and sides
❑Not Observable
of vehicles parked in the doorway.
❑Not Applicable
C408.1.1
Building operations and maintenance
❑Complies
[FI5711
documents will be provided to the
[]Does Not
owner. Documents will cover
❑Not Observable
manufacturers' information,
specifications, programming
❑Not Applicable
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
Additional Comments/Assumptions:
Comments/Assumptions
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Report date:
Data filename: Page