Loading...
HomeMy WebLinkAboutCommCheck ReporteCOMcheck Software Version COMcheckWeb �J( Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area: Construction Site: 2018 IECC Carbondale, Colorado 5b New Construction 8% Owner/Agent: Additional Efficiency Package(s) Credits: 1.0 Required 1.0 Proposed Enhanced Envelope Performance, 1.0 credit Building Area Floor Area 1-steel building (Warehouse) : Nonresidential 8400 Envelope Assemblies Designer/Contractor: Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factors.) Perimeter Roof: Metal Building, Screw Down, Liner System without 8400 20.0 19.0 0.047 0.035 Thermal Blocks, [Bldg. Use 1 - steel building] Floor: Unheated Slab -On -Grade, Vertical 2 ft., [Bldg. Use 1 - 500 -- 15.0 0.520 0.540 steel building] (c) NORTH Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 5752 0.0 19.0 0.050 0.052 (compressed at girt), [Bldg. Use 1 - steel building] Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 552 -- -- 0.290 0.450 6&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 80 -- -- 0.290 0.450 4&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building] 126 — — 0.140 0.370 Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 - 840 — — 0.130 0.310 steel building] FACT Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 843 0.0 19.0 0.050 0.052 (compressed at girt), [Bldg. Use 1 - steel building] Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 24 -- -- 0.290 0.450 6&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 16 -- -- 0.290 0.450 4&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building] 21 — — 0.140 0.370 Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 - 336 — — 0.130 0.310 steel building] Project Title: Report date: 04/21/26 Data filename: Page 1 of 12 Assembly Gross Area or Perimeter Cavity R-Value Cont. Proposed R-Value U-Factor Budget U- Factor(.) SOUTH Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 3391 0.0 19.0 0.050 0.052 (compressed at girt), [Bldg. Use 1- steel building] Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building] 21 --- -- 0.140 0.370 Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 336 - 0.290 0.450 6&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 32 — -- 0.290 0.450 4&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density, 1890 0.0 15.0 0.057 0.090 Furring: Metal, [Bldg. Use 1 - steel building] WEST Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 1003 0.0 19.0 0.050 0.052 (compressed at girt), [Bldg. Use 1 - steel building] Window: Vinyl Frame: Operable, Perf. Specs.: Product ID 48 — -- 0.290 0.450 6&apos;x4&apos; pella, SHGC 0.24, [Bldg. Use 1 - steel building] (b) Door: Insulated Metal, Swinging, [Bldg. Use 1 - steel building] 21 - - 0.140 0.370 Door: Insulated Metal, Garage door 14% glazing, [Bldg. Use 1 - 168 - - 0.130 0.310 steel building] (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab -On -Grade proposed and budget U-factors shown in table are F-factors. Envelope.- .. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Project Title: Data filename: Signature Date Report date: 04/21/26 Page 2 of 12 COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: 2018 IECC New Construction Owner/Agent: Additional Efficiency Package(s) Credits: 1.0 Required 1.0 Proposed Enhanced Envelope Performance, 1.0 credit Allowed Interior Lighting Power .Lvoposed Interior Lighting TBD: No lighting fixtures specified Designer/Contractor: Project Title: Report date: 04/21/26 Data filename: Page 3 of 12 COMcheck Software Version COMcheckweb Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 2018 IECC New Construction 0 (Unspecified) Owner/Agent: Allowed Exterior Lighting Power A Area/Surface Category Designer/Contractor: B C D E Quantity Allowed Tradable Allowed Watts Watts / Wattage (B X C) Total Tradable Watts (a) = o Total Allowed Watts = a Total Allowed Supplemental Watts (b) = 35C (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 350 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. ProposedPower Exterior Lighting TBD: Exterior lighting zone not specified (see project screen) Project Title: Report date: 04/21/26 Data filename: Page 4 of 12 COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 2018 IECC Carbondale, Colorado 5b New Construction Owner/Agent: Additional Efficiency Package(s) Credits: 1.0 Required 1.0 Proposed Enhanced Envelope Performance, 1.0 credit Mechanical Systems List Quantity System Type & Description Designer/Contractor: Mechanical Compliance Statement Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. ame - Title Signature Date Project Title: Report date: 04/21/26 Data filename: Page 5 of 12 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. # I Plan Review & Rea.ID i C103.2 Plans and/or specifications provide all [PR111 information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. C402.4.1 The vertical fenestration area <= 30 [PR10]1 percent of the gross above -grade wall area. C402.4.1 The skylight area <= 3 percent of the [PR1111 gross roof area. Complies? ❑Does Not ❑Not Observable ❑Not Applicable ❑Complies []Does Not ❑Not Observable ❑Not Applicable ❑Complies []Does Not []Not Observable ❑Not Applicable C402.4.2 In enclosed spaces > 2,500 ft2 ❑Complies [PR14]1 directly under a roof with ceiling ❑Does Not heights >15 ft. and used as an office, ❑Not Observable lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, []Not Applicable convention center, automotive service, manufacturing, non - refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent. C406 Plans, specifications, and/or ❑Complies [PR9]1 calculations provide all information []Does Not with which compliance can be determined for the additional energy ❑Not Observable efficiency package options. []Not Applicable Additional Comments/Assumptions: Comments/Assumptions 11 High Impact (Tier 1)_7 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Report date: 04/21/26 Data filename: Page 6 of 12 Section Footing / Foundation Inspection Complies? Comments/A: & Req.ID 'C303.2 Slab edge insulation installed per ❑Complies [F04]2 manufacturer's instructions. ❑Does Not i ❑Not Observable ❑Not Applicable C303.2.1 Exterior insulation protected against ❑Complies [F06]1 damage, sunlight, moisture, wind, ❑Does Not landscaping and equipment ❑Not Observable maintenance activities. []Not Applicable C105 Installed slab -on -grade insulation type ❑Complies See the Envelope Assemblies table fo [F03]2 and R-value consistent with insulation ❑Does Not specifications reported in plans and ❑Not Observable COMcheck reports. ❑Not Applicable C402.2.4 Slab edge insulation depth/length. ❑Complies See the Envelope Assemblies table Po [F07]2 Slab insulation extending away from ❑Does Not building is covered by pavement or []Not Observable i >= 10 inches of soil. []Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Report date: 04/21/26 Data filename: Page 7 of 12 Section # Framing / Rough -In Inspection Complies? & Rea.ID_ C303.1.3 Fenestration products rated in []Complies i FR121 ' accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are certified as ❑Complies [FR1311 to performance labels or certificates ❑Does Not provided. ❑Not Observable ❑Not Applicable C402.4.3 Vertical fenestration SHGC value. ❑Complies [FR1011 ❑Does Not ❑Not Observable ❑Not Applicable C402.4.3, Installed vertical fenestration U-factor ❑Complies C402.4.3. and SHGC consistent with label ❑Does Not 4 specifications and as reported in plans ❑Not Observable [FR811 and COMcheck reports. ❑Not Applicable C402.5.7 Vestibules are installed on all building ❑Complies [FR17]3 entrances. Doors have self -closing ❑Does Not devices. ❑Not Observable []Not Applicable Additional Comments/Assumptions: Comments/Assurn See the Envelope Assemblies table for valu See the Envelope Assemblies table for valu 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) '3 1 Low Impact (Tier 3) 1 Project Title: Report date: 04/21/26 Data filename: Page 8 of 12 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Re .ID C402.5.5. Stair and elevator shaft vents have ❑Complies C403.2.4. motorized dampers that automatically ❑Does Not 3 close. Refernece section C403.7.7 for ❑ Not Observable [ME3]3 operational details. j❑Not Applicable C403.7.7 Outdoor air and exhaust systems have ❑Complies [ME58)3 motorized dampers that automatically ❑Does Not shut when not in use and meet maximum leakage rates. Check ❑Not observable gravity dampers where allowed. '❑Not Applicable Reference section language for operational details. Additional Comments/Assumptions: Project Title: Data filename: 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Report date: 04/21/26 Page 9 of 12 Rough -In Electrical Inspection I Complies? I Comments C405.6 Low -voltage dry -type distribution ❑Complies [EL26]Z electric transformers meet the ❑Does Not minimum efficiency requirements of ❑Not Observable Table C405.6. ❑Not Applicable C405.7 Electric motors meet the minimum ❑Complies [EL27]2 efficiency requirements of Tables ❑Does Not C405.7(1) through C405.7(4). []Not Observable Efficiency verified through certification under an approved certification ❑Not Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). C405.8.2, Escalators and moving walks comply ❑Complies C405.8.2. with ASME A17.1/CSA B44 and have ❑Does Not 1 automatic controls configured to ❑ Not Observable [EL28]2 reduce speed to the minimum ❑Not Applicable permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers. _ C405.9 Total voltage drop across the ❑Complies [EL29]2 combination of feeders and branch []Does Not circuits <= 5%. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) , 2 Medium Impact (Tier 2) ; 3 1 Low Impact (Tier 3) Project Title: Report date: 04/21/26 Data filename: Page 10 of 12 Section & Req.ID C303.1 [IN3]1 C402.2.1 [IN20]1 C303.1 [IN10]2 C303.2 [IN7]1 C105 [IN6]1 C402.2.3 [INB]z C402.2.6 J [IN18]3 C105 [IN2]1 C402.5.1. 1 [IN1]1 Insulation Inspection Complies? Roof insulation installed per ❑Complies manufacturer's instructions. Blown or ❑Does Not poured loose -fill insulation is installed [:]Not Observable only where the roof slope is <=3 in ❑Not Applicable 12 Insulation installed on a suspended ❑Complies ceiling having ceiling tiles is not being ❑Does Not specified for roor/ceiling assemblies. ❑Not Observable Continuous insulation board installed ❑Not Applicable in 2 or more layers with edge joints offset between layers. Building envelope insulation is labeled ❑Complies with R-value or insulation certificate ❑Does Not providing R-value and other relevant ❑ Not Observable data. ❑Not Applicable Above -grade wall insulation installed ❑Complies per manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable Comments/Assumptions Installed above -grade wall insulation ❑Complies See the Envelope Assemblies table for values. type and R-value consistent with ❑Does Not insulation specifications reported in plans and COMcheck reports. ❑Not Observable []Not Applicable Installed floor insulation type and R- ❑Complies See the Envelope Assemblies table for values. value consistent with insulation ❑Does Not specifications reported in plans and ❑Not Observable COMcheck reports. ❑Not Applicable Radiant panels and associated ❑Complies components, designed for heat ❑Does Not transfer from the panel surfaces to the ❑Not Observable occupants or indoor space are insulated with a minimum of R-3.5. ❑Not Applicable Installed roof insulation type and R- ❑Complies See the Envelope Assemblies table for values. value consistent with insulation ❑Does Not specifications reported in plans and [:]Not Observable COMcheck reports. For some ceiling ❑Not Applicable systems, verification may need to occur during Framing Inspection. All sources of air leakage in the ❑Complies building thermal envelope are sealed, []Does Not caulked, gasketed, weather stripped ❑Not Observable or wrapped with moisture vapor- permeable wrapping material to ❑Not Applicable minimize air leakage. Additional Comments/Assumptions: 1 'High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Report date: 04/21/26 Data filename: Page 11 of 12 Section T # Final Inspection Complies? & Req.ID C402.5 Building envelope contains a ❑Complies [FI5511 continuous air barrier that has been ❑Does Not tested and deemed to limit air leakage ❑Not Observable <= 0.40 cfm/ft2. ❑Not Applicable C402.5.6 Weatherseals installed on all loading ❑Complies [F137]1 dock cargo door openings and provide ❑Does Not direct contact along the top and sides ❑Not Observable of vehicles parked in the doorway. ❑Not Applicable C408.1.1 Building operations and maintenance ❑Complies [FI5711 documents will be provided to the []Does Not owner. Documents will cover ❑Not Observable manufacturers' information, specifications, programming ❑Not Applicable procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. Additional Comments/Assumptions: Comments/Assumptions 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Report date: Data filename: Page