Loading...
HomeMy WebLinkAboutHigh Strength Bolt Inspection Report 06.11.2026West Slope Testing & Inspection LLC Grand Junction, CO 81504 Inspection Report Date: 6-11-26 Client: CTL Thompson (Project No. GS06848.001) Project: Garfield County Airport Hangars -Phase 2 Address: 375 C.R. 352 Rifle, CO Building Permit No: BLCO-08-24-8865 General Contractor: High Performance Hangars Contractor that Performed Work: T.P.I. Industrial Inspection of shop fabrication or field work at job site: Field Report #1 Page 1 of 1 Report: Inspected high strength A325 bolting at the pre-engineered metal building frame except for flange bracing & center partition columns that were not yet installed. The high strength A325 bolting inspected above appeared to be in substantial conformance with the plans, and the building manufactures engineers letter for hardened washers not being required at slotted holes for jack beam to column connections along frame line D. Inspector/Technician: Douglas E Young Doaglas & young IC:C C'ertilication #5102224 5tr ct: r l Welding Specialāž¢ Inspector Ntrildural Steel & Boning Special Inspector SPray-appiled Fircp oor1ng Special Inspector