HomeMy WebLinkAboutHigh Strength Bolt Inspection Report 06.11.2026West Slope Testing & Inspection LLC
Grand Junction, CO 81504
Inspection Report
Date: 6-11-26
Client: CTL Thompson (Project No. GS06848.001)
Project: Garfield County Airport Hangars -Phase 2
Address: 375 C.R. 352 Rifle, CO
Building Permit No: BLCO-08-24-8865
General Contractor: High Performance Hangars
Contractor that Performed Work: T.P.I. Industrial
Inspection of shop fabrication or field work at job site: Field
Report #1
Page 1 of 1
Report: Inspected high strength A325 bolting at the pre-engineered metal
building frame except for flange bracing & center partition columns that were not
yet installed.
The high strength A325 bolting inspected above appeared to be in substantial
conformance with the plans, and the building manufactures engineers letter for
hardened washers not being required at slotted holes for jack beam to column
connections along frame line D.
Inspector/Technician: Douglas E Young
Doaglas & young
IC:C C'ertilication #5102224
5tr ct: r l Welding Special⢠Inspector
Ntrildural Steel & Boning Special Inspector
SPray-appiled Fircp oor1ng Special Inspector