Loading...
HomeMy WebLinkAboutEngineer's Letter 08.31.2026MTCG STRUCTURAL August 31, 2026 Brad Jordan Jordan Architecture PO Box 1031 Glenwood Springs, CO 81602 bradiordanarchitect@gmail.com RE: Pizarro Storage Tent — Uplift Resistance and Snow Mitigation Recommendations 234 County Road 236, Silt, CO 81652 Brad, As requested, we have reviewed the temporary storage tent structure constructed at the above site for the limited aspects noted above. We understand the tent is a Hills Industrial Double -Truss tent, 80 feet long x 50 feet wide x 26 feet high at the ridge. We have not been able to find any published snow load capacity for the tent structure noted. The tent is currently ballasted with six concrete ecology blocks (3,600# apiece), three per long side. We recommend that the tent structure is retrofitted with additional ecology blocks for uplift resistance. A total of twenty ecology blocks shall be used as ballast, eight each per long side and two each per gable end, evenly spaced and attached to the tent structure in a similar fashion to the existing ballast blocks. Tension cables and standard cable connection accessories rated for 2, 000 Ibs, or equal alternatives, shall be used to connect each ecology block from its cast -in pick point up to each adjacent tent frame haunch. Due to the unknown snow load capacity of the structure, we also recommend that a snow removal program is implemented to prevent snow accumulation on and against the tent structure. Note. the intemal strength and integrity of the tent and its framework, and any connections to it, is outside of the scope of these recommendations and has not been evaluated. Please feel free to contact our office should questions arise. Sincerely, MTCG Structural p,00 C/OFy S� �Ae (A 51 35 °' ;Q **ego S IONAL 08/31/2026 Steven R. Edmiston, P.E. S.E. Principal Mountain Town Consulting Group, LLC, P.O. Box 1577, Basalt, CO 81621 1 206-910-7766 1 steve@mountaintowncg.com www.MountainTownCG.com