Loading...
HomeMy WebLinkAboutDrainage MemorandumDrainage Memorandum To: Chris Bendon From: Jesse K. Swann, PE Date: April 24, 2026 Re: Drainage Memo -Sweet Water Ranch Road 2 — New Leaf Lane Encl: Appendix This drainage memo has been prepared by Sopris Engineering (SE) to support the construction a new secondary egress road (New Leaf Road) that connects Sweetwater Road to multiple building sites that are either currently under construction or conceptualized for future development. The secondary egress road travels predominantly through Eagle County for the first 2 miles, before entering Garfield County for the last 0.4 miles, ultimately terminating at the previously permitted Upper Houser Loop Road. The proposed road provides a secondary means of egress per Eagle County requirements given the number of structures proposed and served by Upper Houser Loop Road. Eagle County requires secondary egress roads to be single lane road accessible to a passenger vehicle, at a minimum, maintained throughout the year. The proposed egress road is not required for emergency vehicle or fire truck access. Emergency services access is provided by the previously permitted Road 3 as depicted in Figure 1 below. The information provided within this drainage memo is specific to the portion of the road residing within Garfield County. A Drainage Basin Delineation Exhibit (Exhibit A) is provided as an attachment to illustrate the tributary drainage basins associated with the secondary egress road, along with summary peak runoff rates tributary to the proposed culverts. Additionally, a Nationwide 14 Permit has been submitted to the Army Corps of Engineers to confirm regulatory compliance regarding wetland disturbance. A copy of these approvals will be forwarded to Garfield County once received. Project Overview: The proposed project involves construction of a new gravel secondary egress road that generally follows an existing two track internal ranch road and across undeveloped rangeland within the subject property. The objective of the proposed improvements is to provide a suitable secondary means of egress for the multiple structures in development in compliance with Garfield and Eagle County regulations. Site Overview: The proposed access road is served from Sweetwater Road within Eagle County and crosses Sweetwater Creek. A separate permit covers work in this area to include the construction of a new bridge over Sweetwater Creek. The proposed road then climbs approximately 500 feet over two miles before crossing into Garfield County. The overall topography within the surrounding area is relatively to moderately flat, with slopes ranging from 5% to 12% - generally sloping toward the north and east. The existing surface is primarily comprised semiarid rangeland along with cultivated pastures that feature several lateral irrigation ditches for flood irrigation. Pockets of pinyon, Gambel oak, and sage, are sporadically present within the development area as well. The new road design accommodates existing irrigation practices and concentrated stormwater runoff by elevating the road along pastureland or locating culverts at existing defined drainage channels. Sweetwater Creek, located at the entrance to the proposed road, serves as the ultimate receiving waterbody for upstream development within the New Leaf Road access area. Although Sweetwater Creek is not included in any FEMA Flood Insurance Rate Maps, floodplain studies conducted in anticipation of future bridge crossings indicate that the 100-year floodway and floodplain remain confined near the ordinary high-water mark, well below the proposed roadway. 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 pg. 1 Figure 1: Aerial Image of Site Hydrologic Analysis Methods & Assumptions: Various culverts are necessary along -the proposed -access road to properly convey stormwater. runoff; hence, stormwater modeling was carried out to size these culverts. The NRCS Technical Release-55 (TR-55) hydrologic method was utilized via Storm and Sanitary Analysis (SSA) software for calculating runoff volume, peak runoff discharge, and other hydrologic data for small watersheds. The NRCS TR-55 method requires rainfall data, soil type, Time of Concentration (Tc) and an estimate of the Curve Number (CN) to develop peak flow rates. In addition, the NRCS method can be used where the following criteria applies: • Watershed area is greater than 0.1 acres and less than 25 mi2 • CN is 50 or greater • Tc is greater than 0.1 hours and less than 10 hours • The computed value of IaIP is between 0.1 and 0.5. These parameters were checked during the analysis for each of the drainage basins and confirmed to comply with the limitations associated with TR-55. This is noted within each of the drainage basin descriptions below. Input Parameters: • Rainfall Data: 100-year cumulative storm for Garfield County Colorado, with a total rainfall amount of 2.58 inches using a SCS Type II 24-hr storm distribution was applied for the model's rain gauge. The rainfall depth was referenced from NOAA Rainfall Depth Charts. • Soil Type: Based on National Resource Conservation Service (NRCS) soil survey data, the area primarily consists of hydrologic soil group C. 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 pg. 2 • Curve Number (CN): Weighted Curve Numbers (CNs) were established based on ground cover classifications and a soil hydrologic classification of Type C. Ground cover classifications were determined through field inspections and aerial drone imagery. The following Curve Numbers were assigned based on these parameters: o Pasture, Grassland (Condition: Good): 74 o Sagebrush Range (Condition: Fair): 63 o Pinyon & Juniper (Condition: Fair): 73 o Gravel Roads: 89 o Development <50% grass cover: 86 • Time of Concentration (Tc): Aerial topography was referenced in support of estimating the time of concentration for each of the drainage basins described below. It should be noted that sheet flow was limited to 300 linear feet. The results of the TR-55100-yr peak discharge analysis for each of the drainage basins are summarized below: Drainage Basin Descriptions: The study area was divided into multiple drainage basins to route the design storm event through the development and size proposed culverts. The basins are further described below: Basin UH-3: 37.9 acres of mostly semi -arid range lands with scattered pinyon/juniper stands. This basin and corresponding outlet culvert were originally analyzed and permitted through Garfield County with the Upper Houser Loop Road study, and further refined with the Guest Cabin 2 permit (under construction). The proposed impervious areas associated with Guest Cabin 2 are included in this basin to analyze downstream culverts. Basin UH-6: 1.9 acres of predominantly irrigated pasture lands range land. This basin and corresponding outlet culvert were originally analyzed and permitted Garfield County with the Upper Houser Loop Road study and is currently under design for a future Community Barn. Impervious areas associated with the Community Barn have been included in this basin analysis to analyze downstream culverts. Confirmation of design assumptions will be made in support of future building permit application for the Community Barn. Basin UH-5: 2.3 acres of predominantly irrigated pasture lands range land. This basin and corresponding outlet culvert were originally analyzed and permitted in Garfield County with the Upper Houser Loop Road study and is currently under design for a future Community Barn. Impervious areas associated with the Community Barn have been included in this basin analysis to analyze downstream culverts. Confirmation of design assumptions will be made in support of future building permit application for the Community Barn. Basin MR-N: 1.44 acres of mostly semi -arid range lands and sagebrush. This basin and corresponding outlet culvert were originally analyzed and permitted through Garfield County with the Upper Houser Loop Road study, and further refined with the Main Residence permit (under construction). The proposed impervious areas associated with the northern portions of the Main Residence design are included in this basin to analyze downstream culverts. Basin P18: 11.7 acres of primarily pasture and semi -arid rangelands and tributary portions of gravel ranch road. Basin P19: 13.7 acres of primarily pasture and semi -arid rangelands and tributary portions of gravel ranch road. 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 pg. 3 Basin P20: 6.1 acres of primarily pasture and semi -arid rangelands and tributary portions of gravel ranch road. The 100-year peak runoff rates for each basin are summarized below in Table 1 Table 1: 100-Year Peak Runoff Rates Summary Drainage Basin ID Area acres Tc min. Weighted CN la in P in Ia/P Ratio 0100 cfs MR-N 2.21 10.0 89.00 0.25 2.58 0.10 4.65 P18 11.71 11.6 63.69 1.14 2.58 0.44 3.00 P19 13.70 25.2 68.29 1.11 2.58 0.43 4.31 P20 6.10 13.4 64.25 1.11 2.58 0.43 1.60 UH-3 37.90 97.8 71.23 0.81 2.58 0.31 6.29 U H-5 2.27 10.0 86.30 0.32 2.58 0.12 4.19 UH-6 1.90 10.0 86.32 0.32 2.58 0.12 3.51 Hydraulic Analysis Methods & Assumptions: The peak runoff rates outlined in Table 1 were used to size the proposed culverts. Hydraflow Express Extension was utilized to perform this analysis. Hydraflow Express employs an energy -based Standard Step methodology to estimate culvert flow capacities. For maintenance and efficiency purposes, a minimum culvert diameter of 24 inches was adopted. All proposed culverts will be constructed from ADS N-12 smooth interior pipes, utilizing a Manning's Roughness Coefficient of 0.013, which represents the flow roughness characteristics of the pipe material. To accurately estimate the capacities for each culvert, a flow increment of 0.25 cubic feet per second (cfs) was applied to each culvert and evaluated until just prior to roadway overtopping. This value was cross referenced to the total 100-year peak runoff rate assigned to each culvert based on its corresponding drainage basin. Below is a brief description of each proposed culvert, with Table 2 summarizing the results of the sizing analysis: • CULVERT #3: Located at the northeastern low point of Basin UH-3. This culvert was originally permitted and sized with the Upper Houser Loop Road, and subsequently with the Guest Cabin 2, currently' under construction. Its sizing is based on the peak flow associated with Basin-UH3 updated to include the impervious areas associated with Guest Cabin 2. • CULVERT #6: Located at the northern low point of Basin UH-5. This culvert was originally permitted and sized with the Upper Houser Loop Road. Its sizing is based on the peak flow associated with Basin-UH5 with assumptions made for impervious areas associated with the forthcoming Community Barn design. • CULVERT #7: Located at the northern low point of Basin UH-6. This culvert was originally permitted and sized and with the Upper Houser Loop Road. Its sizing is based on the peak flow associated with Basin-UH6 with assumptions made for impervious areas associated with the forthcoming Community Barn design. • CULVERT G1: Located at the northeastern low point of Basin P19. Its sizing is based on the peak flow associated with Basin 19 along with tributary Basins UH-3 and UH-6. 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 pg. 4 • CULVERT G2: Located at the northeastern low point of Basin P20. Its sizing is based on the peak flow associated with Basin 20. • CULVERT HMS: Located at the northern portion of Basin P20. Its sizing is based on historic irrigation flows as expressed by the Ranch Manager, matching the size of additional existing HMS ditch culverts throughout the property. Table 2 summarizes the peak runoff rates associated with each proposed culvert, along with their respective capacities based on sizing, depths, material types, and slopes. Table 2: Culvert Capacity Summary Culvert Tributary Drainage Q100 Size Capacity ID Basin ID cfs in cfs CULVERT #3 * UH-3 6.24 24 22.00 CULVERT #6 * UH-5 4.18 18 16.80 CULVERT #7 * UH-6 3.5 18 20.00 CULVERT G1 UH-3, UH-6, P19 6.39 24 37.25 CULVERT G2 P20 1.58 24 18.75 * Loop Road culvert previously permitted. Included to support basin routing Erosion Control: _ Erosion control measures are essential to mitigate drainage issues and prevent soil erosion during construction activities. While the responsibility for implementing these measures lies with the contractor under the State -issued Stormwater Management Plan (SWMP), the following erosion control practices are minimum recommendations to help reduce sediment transport and soil degradation. Construction activities inevitably create a risk of soil erosion and offsite sediment transport, particularly during rain events. To combat this, the contractor shall install and maintain the following Best Management Practices (BMPs) throughout the construction phase: • Pre -Construction Measures: Before any clearing, grubbing, lot grading, or construction work begins, the contractor shall establish temporary sediment control logs and/or embedded silt fencing around the anticipated limits of disturbance. • Culvert Protection: Hay bales and sediment control logs should be placed at the inlets and outlets of all culverts to prevent sediment from contaminating the culverts prior to the establishment of vegetation. • Topsoil Management: Topsoil designated for removal and reuse shall be stockpiled with sediment control logs or silt fencing around their perimeters. If stockpiles are to remain for more than 15 days, temporary seed should be applied to prevent erosion and weed growth. • Ditch Control: Install sediment control logs within the flowline of ditches at appropriate intervals to reduce flow velocities and capture sediment. • Site Inspections: The site must be inspected and recorded in accordance with the State issued SWMP. Silt deposits behind silt fencing and sediment control logs should be regularly cleared to ensure the effectiveness of the erosion control system. These inspections and maintenance activities must be documented in a logbook readily available for inspection. 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 pg. 5 Vegetation Establishment: Seed and mulch shall be applied over disturbed cut and fill slopes, with watering as necessary, to establish permanent vegetative ground cover. Slope Stabilization: Erosion control blankets and/or hydromulching shall be applied to all cut and fill slopes that exceed a 3:1 slope ratio. Vehicle Tracking Control: Vehicle tracking control devises shall be installed at the entrance to Sweetwater Road to prevent tracking onto the public roadways. Temporary erosion control measures installed during construction should remain in place and be maintained until new vegetation is established at a 70% growth level. Once soil stabilization is satisfactory, temporary erosion control structures may be removed. Given the dynamic nature of construction sites, the final location and selection of BMPs shall be at the contractor's discretion. All necessary permits must be acquired prior to the commencement of construction, and the criteria outlined in these permits must be adhered to until the associated permits are closed. Conclusions - The drainage analysis indicates that the proposed access road improvements will not adversely impact the subject property or surrounding areas. Onsite runoff will be appropriately managed via the designed storm channels and culverts. Erosion control BMPs will be enforced prior to construction, with supplemental drainage reports prepared for future Site Plan and Building Permit applications associated with further development on Sweetwater Ranch. For further questions or additional information, please feel free to contact me. O�: •`�E K Slyy' `S'F / • 42787 s, / ON* F°U K-� U]f6:7026 04 2e 14:59:09-06'00' Prepared by: Jesse K. Swann, PE Encl: Exhibit A: Drainage Basin Delineation Map NOAA Rainfall Depth Chart SSA Input/output Data Hydraflow Culvert Hydraulic Calcs 502 Main Street, Suite A3, Carbondale, CO 81623 970-704-0311 =1 N m-:rig 11e1HX3 J-UOd3U MI ONI�JIDNISNISjii dOS 0DA.LNnoD (1131d'dVD HDNVRl 2131VMi33MS (1b 2131VAA13IMS 86/-500 .1N Ng R zi z OD 3!E)VL. OD0131A8V9 ego L BASIN ROUTING SCHEMATIC SWEETWATER RANCH - ROAD 2 - NEW LEAF LANE COUNTY OF GARFIELD, STATE OF COLORADO. LEGEND UH3 uli6 XX DRAINAGE BASIN #3 #7 XX CULVERT P19 XX DRAINAGE BASIN (EAGLE COUNTY) O CULVERT (EAGLE COUNTY) UH5 G1 ##6 P17 P13 P18 E16 E15 P14 P20 P11 P10 P15 P12 P9 Pik) G2 E13 E14 E10 Ell E12 E8 E9 P1 P2 P3 P4 P5 P6 P7 E1 E3 E5 E6 SWEETWATER CREEK SOPRIS ENGINEERING LLC 502 MAIN STREET • SUITE A3•CARBONDALE CO 81623 (970) 704.0311 - soprisengineering.com G:\2024\34008 SWEETWATER_RANCH\CIVIL\CIVIL DWGS\LXHIBITS\DRAINAGE\ROADS\34008 ROAD 2 DRAINAGE BASINS.DWG - Mar 24, 2026 - 3:17pm Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=39.7551&ton=... NOAA Atlas 14, Volume 8, Version 2 Location name: Gypsum, Colorado, USA* Latitude: 39.7551°, Longitude:-107.1036' Elevation: 6997 ft**t 'source: ESRI Maps " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Senja Penca, Deborah Martin, Sandra Pavlovic, Ishani Roy, Mchael St. Laurent, Carl Trypaluk, Dale Unruh, Mchael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps_8_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1� Average recurrence interval ears Duration )^2 1 5 10 1 25 1 50 100 200 500 1000 (0249-0.403)I 0.320-0 588)' 0.373 0 694) (0.424-0 847 0An-1 02 0.544128 0.598-1A7 (--- - 5-min 0.108-05 71) (0.140-017- (0.198-0 316 • 0.198 0.257 0.362 0.459 0.606 0.731 --J 0.864 1.01 1.22 1.38 10-min 0.159-0.251); 0.206-0.326 .289-0.462) 0.365-0.589 (0.468-0.832 (0.646-1.02) (0.621-124 050(.691-1.0.796-1.87 875-2.15 ) -min I -, 0.313-&- 0.560 0.739 0.891 1.05 1.23 1.48 1.69 07-2 �1515(0.1-0306),�1.0398)0.35-00445-0)J 5 .2. .71-1.02 .666-1240.757-1.510841.83I0.971-228 30-min 0 -30-47f 0.244-0.386)' 0.400 0.561 (0.320-0.508) (0.448-0.715) F 0.699 ) 0.894 1,05 (0.554 0 897 0.683-1.21 0.780.1.44 1.21 1.38 1.60 1.78 0.8861.72) 0 938-2.03 1.04-2.45 1.13-2.76 1.86 0.384 60-min 9A (0.390-0818); 0.523-0836) (0. 33.1.02 0.59--1634 0.855-1.58 0.935-1.85) (1. 02.16 1. 0-2.57j] 1.18-2.88Z 1.57 78 2-hr 0.465 0.378 0 585]j .463-0 721 1 0.804 0 9a7) (0 0.89614) (0.843 0.938 1.89 1.01�96) (1.08-2.28)l 1.17-2.86 1.24-2.96) 3-hr I IF 0.800 1 1.13 11 1.28 1.44 1.81 1.97 60 229 1.20-2.69 1.273.00 !, 0.437.672 .517-0.7970.681.01 (0.755-1.19 (0.876-1A9 0.940 1.08 1.27 I 0.98-1.72 1.04-2.00 (m1 0782 6-hr 0688 (0.5006.537.8 -0.96960 ) _0.939 S0.9 .767-117)!O4-1.35 98-1.8 -1.91 1.17-2.19(1.24-2.52)(1.342. __ 1.423.28) - - -0.636 1. 12-hr 0 0.86 O, I J ' 0.979-1A7 (1 123.6, 1.28 2?10) 1.40-2.40 1.51 276 1.59 3.17) (1.73 3672 1.844.13) 24-h r 0.868-1.29 -0.8-98 1.02-21 A8 1.2341881 1.41 2110 1. 30461 4.79.3.00 3.26 1.923.46 2.04 3 97 (223.4.67 1 2.375.20 2 33-410 2A8r172 (2.72 5357) 2.90-6 21 2-day 1. 031057 1.2441878 J 1.49 2815 2.05 1. 1-2.49) 410 (2: 63 5S� 1.97 3 3-day11 1. 4-41 78 1.42-2.00 1.70-2A3 1.84 2 80) 224-3.48 2A6.3.98 2.64-4.58 .8.18 .26 (306 818) 326.6.87 4-day 1.3761?92 1.568419 2.87 4 92 3.04 fi 63 3.30 6 59) 3.50 7.31 1.87?2 65 2: 3 3 05 4 3J6 2.67 4 30 2.441 7-day 70 2934 32".53 6 28 3. 2 7828) (3.93.8.04 (1 1.90 2?63 2. 4 3312 .52 3854 2.84-4.30-08.4.86 .45 r--1� i 5.84 4.09-7.89 4.30 8.6910dy(1.za210 2.130 2.�3528-396)i 3.1847)3.4535 3.64.6.05 3.81 _ 8.04 3.17 20-day (2.753 68 3.02 4 07 3.48 4 71 _ 3.86528 4.27 625 (4. 8-6 98 4.8317.84 5.02 8 79 5.35- 0.1) (5.60 z f ) I ) s_ -i 30-day (3. 0 4.51) (3.i5-0.99) (4.325.78 J 8 6A7 (62B 7260) 5.62 SA8 t5.90 9344) 56.IF 8 10.5 SA5-111.9) (6.715 3.0) 6.95 45-day (4_ 6 5.59) (4.72 64.87 .2 (5.45-7.21 �6.02-8.05� (6;58 9938) (7. 05 0_4)s7_3o211.5) (7.50�12.7 .6 �14.3) (8.09 5.4) 60-day 5.71 6.36 7.38 8.20 9.26 10.0 10.8 11.5 12.4 13.0 (5.02-6.53) (5tW-128 (6A"A7) (7.12-9A5) 7.74-10.9 8.21-12.0 (8.51-13:3) (8.69-14.6) (8.99-16.2) (9.22-17.4) i Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). lumbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) Is 5 %. Estimates at ipper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. 'lease refer to NOAA Atlas 14 document for more information. PF graphical 1 of 4 10/17/2024, 10:16 AM Sweetwater Ranch Project SSA Input/Output Subbasin Hydrology Subbasin: MR-N Input Data Area (ac)_.._......................................... 2.21 Peak Rate Factor ............ ._.................... 484 Weighted Curve Number ............ ......... 89 Rain Gage ID ............... „.„...................... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Desaiption (acres) Group Number 1.44 - 89 Composite Area & Weighted CN 1.44 89 Time of Concentration TOC Method: SCS TR-55 Sheet Flow Equation: To = (0.007 ` ((n ` Lf)A0.8)) / ((P^0.5) " (SfA0.4)) Where: To = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16.1345 " (SfA0.5) (unpaved surface) V = 20.3282 • (SfA0.5); (paved surface) V =15.0 " (SfA0.5) (grassed waterway surface) V =10.0 " (SfA0.5) (nearly bare & untilled surface) V = 9.0 ` (SP0.5) (cultivated straight rows surface) V = 7.0 " (SfA0.5) (short grass pasture surface) V = 5.0 • (SfA0.5) (woodland surface) V = 2.5 ` (SfA0.5) (forest w/heavy litter surface) To = (Lf / V) / (3600 sec/hr) Where To Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1.49"(RA(2/3)) `(SfA0.5)) / n R =Aq/Wp To = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft') Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 10 Subbasin Runoff Results Total Rainfall (in) .................... ......... — 2.58 Total Runoff (in) .......„ ............................ 1.53 Peak Runoff (cfs)..................................- 4.65 Weighted Curve Number ....................... 89 Time of Concentration (days hh:mm:ss) 0 00:10:00 Page 1 Sweetwater Ranch Project SSA Input/Output Subbasin : P01 Input Data Area(ac)................................................. 9.75 Peak Rate Factor .................:.................. 484 Weighted Curve Number....... .................. 72.73 Rain Gage ID .......................................... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Croup Number 0.06 - 89 5.33 74 0.89 - 63 3.47 73 Composite Area & Weighted CN 9.75 72.73 Time of Concentration Subarea Subarea Subarea Sheet Ffow Computations A B C farming's Roughness 0.15 0 0 Flow Length (ft) : 300 0 0 Slope (%) : 25 0 0 2 yr. 24 hr Rainfall (in) 1.22 0 0 Velocity (ft/sec) : 0.36 0 0 Computed Flow Time (min) : 13.91 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computation A B C Flow Length (ft) : 821 82 0 Slope (%) : 17.66 1 0 Surface Type: Grass pastureare & untille Unpaved Velocity (ft/sec) : 2.94 1 0 Computed Flow Time (min) : 4.65 1.37 0 Total TOC (min) ..................9.97 Subbasin Runoff Results Total Rainfall (in) . 2.58 Total Runoff (in) ..................................... 0.6 Peak Runoff (cfs).................................... 7.52 Weighted Curve Number ........................ 72.73 Time of Concentration (days hh:mm:ss) 0 00:09:58 Page 2 Sweetwater Ranch. Project SSA InpuUOutput Subbasin : P18 Input Data Area(ac)................................................. 11.71 Peak Rate Factor .................................... 484 Weighted Curve Number ........................ 63.69 Rain Gage ID .......................................... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 0.22 89 11.25 63 0.23 73 Composite Area & Weighted CN 11.7 63.69 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft) Slope (k) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) Shallow Concentrated Flow Computatior Flow Length (ft) Slope (k) : Surface Type: Velocity (fUsec) : Computed Flow Time (min) : Total TOG (min) ..................11.64 Subbasin Runoff Results Subarea Subarea Subarea A B C 0.15 0 0 300 0 0 17.3 0 0 1.22 0 0 0.31 0 0 16.12 0 0 Subarea Subarea Subarea A B C 570 6% 0 22.8 6.4 0 Grass pastur6are & untille Unpaved 3.34 2.53 0 2.84 4.32 - 0 Total Rainfall (in) ..................................... 2.58 Total Runoff (in) ...................................... 0.29 Peak Runoff (cfs).................................... 3 Weighted Curve Number ........................ 63.69 Time of Concentration (days hh:mm:ss) 0 00:11:38 Page 19 Sweetwater Ranch Project SSA Input/Output Subbasin : P19 Input Data Area(ac)................................................. 13.7 Peak Rate Factor .................................... 484 Weighted Curve Number ........................ 68.29 Rain Gage ID .......................................... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 0.33 89 5.69 74 7.55 63 0.14 73 Composite Area & Weighted CN 13.71 68.29 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A a C Manning's Roughness: 0.15 0 0 Flow Length (ft) : 300 0 0 Slope (%) : 14 0 0 2 yr, 24 hr Rainfall (in) : 1.22 0 0 Velocity (ft/sec) : 0.28 0 0 Computed Flow Time (min); 17.55 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computation A B C Flow Length (ft) : 1128 0 0 Slope (k) : 12.4 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity (ft/sec) : 2.46 0 Computed Flow Time (min) : 7.64 0 Total TOG (min) .................25.19 1 Subbasin Runoff Results Total Rainfall (in) ..................................... 2.58 Total Runoff (in) ...................................... 0.43 Peak Runoff (cfs).................................... 4.31 Weighted Curve Number ........................ 68.29 Time of Concentration (days hh:mm:ss) 0 00:25:11 Page 20 Sweetwater Ranch Project SSA Input/Output Subbasin : P20 Input Data Area(ac)............. _..... „........................... 6.1 Peak Rate Factor .............._.................. .. 484 Weighted Curve Number ........................ 64.25 Rain Gage ID ....... . ....................„........... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 0.29 - 89 5.81 - 63 Composite Area & Weighted CN 6.1 64.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.15 0 0 Flow Length (ft) : 300 0 0 Slope (%) : 7.3 0 0 2 yr, 24 hr Rainfall (in) : 1.22 0 0 Velocity (ft/sec) : 0.22 0 0 Computed Flow Time (min) : 22.77 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computat A B C Flow Length (ft) : 212 522 0 Slope (%) : 15 11 0 Surface Type : 3rass pasturere & untille Unpaved Velocity (ft/sec) : 2.71 3.32 0 Computed Flow Time (min) : 1.3 2.62 0 Total TOC (min) ..................13.35 Subbasin Runoff Results Total Rainfall (in) .............................. 2.58 Total Runoff (in) ................................ 0.31 Peak Runoff (cfs) .............................. 1.6 Weighted Curve Number .................. 64.25 ###JI##tf##################### 0 00:13:21 Page 21 Sweetwater Ranch Project SSA Input/output Subbasin : UH-3 Input Data Area(ac).......................................... 37.9 Peak Rate Factor ............................. 484 Weighted Curve Number .................. 71.23 Rain Gage ID ........................:.......... Rain Gage-100yr Composite Curve Number 32 Soil/Surface Description Area (acres) Soil Group Curve Number Gravel roads 0.3 C 89 Pinyon & Juniper range, Fair 30.4 C 73 Sagebrush range, Fair 7.2 C 63 Composite Area & Weighted CN 37.9 71.23 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0.15 0 Flow Length (ft) : 300 3985 0 Slope (%) : 8.7 11.6 0 2 yr, 24 hr Rainfall (in) : 1.22 1.22 0 Velocity (ft/sec) : 0.14 0.44 0 Computed Flow Time (min) 36.95 149.8 0 Subarea Subarea Subarea Shallow Concentrated Flow Computat A B C Flow Length (ft) : 1023 0 0 Slope (%) : 15 0 0 Surface Type : Woodland Unpaved Unpaved Velocity (ft/sec) : 1.94 0 0 Computed Flow Time (min) : 8.79 0 0 Total TOC (min) ..................97.77 Subbasin Runoff Results Total Rainfall (in) .............................. 2.58 Total Runoff (in) ................................ 0.54 Peak Runoff (cfs) .............................. 6.29 Weighted Curve Number .................. 71.23 ######tttt#ttttlltt#tttt#tt#tt#tt#tt#### 0 01:37:46 Page 22 Sweetwater Ranch Project SSA InputlOutput Subbasin : UH-5 Input Data Area (ac) ............................ Peak Rate Factor ................ Weighted Curve Number.... Rain Gage ID ..................... Composite Curve Number Soil/Surface Description < 50% grass cover, Poor Gravel roads Composite Area & Weighted CN Time of Concentration ...... 2.27 ...... 484 86.3 ...... Rain Gage-100yr 32 Area Soil Curve (acres) Group Number 1.84 C 86 0.2 C 89 2.04 86.3 User -Defined TOC override (minutes): 10.00 Subbasin Runoff Results Total Rainfall (in) .............................. 2.58 Total Runoff (in) ................................ 1.33 Peak Runoff (cfs) .............................. 4.19 Weighted Curve Number .................. 86.3 #####►f#p#tttf################t7 0 00:10:00 Page 23 Sweetwater Ranch Project SSA Input/Output Subbasin : UH-6 Input Data Area(ac).......................................... 1.9 Peak Rate Factor ............................. 484 Weighted Curve Number .................. 86.32 Rain Gage ID ................................... Rain Gage-100yr Composite Curve Number 32 Area Soil Curve Soil/Surface Description Log"Group Number < 5m',, grass cover, Poor 1.7 C 86 Gravel roads 0.2 C 89 Composite Area & Weighted CN 1.9 86.32 Time of Concentration User -Defined TOC override (minutes): 10 Subbasin Runoff Results Total Rainfall (in) .............................. 2.58 Total Runoff (in) ................................ 1.33 Peak Runoff (cls) .............................. 3.51 Weighted Curve Number .................. 86.32 #### #######*############## 0 00:10:00 Page 24 Culvert Report Hydraflow Express Extension for Autodesk® Civil 3DO by Autodesk, Inc CULVERT G1 Invert Elev Dn (ft) = 7512.10 Pipe Length (ft) = 76.40 Slope. (%) = 18.19 Invert Elev Up (ft) = 7526.00 Rise (in) = 24.0 Shape = Circular Span (in) = 24.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 7532.75 Top Width (ft) = 20.00 Crest Width (ft) = 20.00 Q&VaffG1 Tuesday, Apr 14 2026 Calculations Qmin (cfs) = 36.00 Qmax (cfs) = 38.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 37.25 Qpipe (cfs) = 37.25 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 11.90 Veloc Up (ft/s) = 11.97 HGL Dn (ft) = 7514.07 HGL Up (ft) = 7527.94 Hw Elev (ft) = 7532.75 Hw/D (ft) = 3.38 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for AutodeskO Civil 3D® by Autodesk, Inc. Tuesday, Apr 14 2026 CULVERT G2 Invert Elev Dn (ft) = 7551.38 Calculations Pipe Length (ft) = 44.50 Qmin (cfs) = 16.00 Slope (%) = 11.17 Qmax (cfs) = 19.00 Invert Elev Up (ft) = 7556.35 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 18.75 No. Barrels = 1 Qpipe (cfs) = 18.75 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.35 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.14 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 7553.16 HGL Up (ft) = 7557.91 Embankment Hw Elev (ft) = 7559.00 Top Elevation (ft) = 7559.00 Hw/D (ft) = 1.32 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 20.00 . M as�m rim rim rssm Assam aim ism rs+m e.o+.s.— xa ram.: aLvmr Q aM �x