Final Inspection Report
Date: 9-8-26
Client: CTL Thompson (Project No. GS06848.001)
Project: Garfield County Airport Hangars -Phase 2
Address: 375 C.R. 352 Rifle, CO
Building Permit No: BLCO-08-24-8866
General Contractor: High Performance Hangars
Contractor that Performed Work: T.P.I. Industrial
Report #4
Page 1 of 1
Inspection of shop fabrication or field work at job site: Field
Report: Inspected high strength A325 bolting at the flange bracing that wasn't
installed & inspected on the 1st inspection visit for the 2nd building constructed.
The high strength A325 bolting inspected above appeared to be in substantial
conformance with the plans, and the AISC/RCSC Specification for high strength
bolting.
Inspector/Technician: Douglas E Young 9 J �Jw
Sbn°..,:i d'!i, .W4kv Spe&'lledu Inspector