Loading...
HomeMy WebLinkAboutAsbestos Report 09.29.2026Aspen Growth Enterprises LLC Asbestos Sampling w1n@ Testing Report Project Site: 268 River's Bend Carbondale, CO 81623 Client: Mark and Betty Sloan Date of Service: 09/25/2026 Inspection Completed By: Report Prepared By: Registration No.: Page 1 of 29 Date of Report: 09/29/2026 Brandon G. Wade CDPHE Certification No.: 25746 Aspen Growth Enterprises LLC ACF - 25973 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 2 of 29 Table of Contents: Section 1: Executive Summary / Purpose of Work Pg. 3 Section 2: Definition of Homogeneous Areas & Sketch Pg. 4&5 Section 3: Regulations and Amendments Pg, 8 Sections 4: Results and Laboratory Analysis Chart Pg. 12 Section 5: Functional Spaces and Damage Report Pg. 14 Sections 6: Recommendations and Disclaimer Pg. 15 Sections 7: Sampling Chain of Customs Pg. 17 Section 8: PLM Reports — Eurofins Reservoirs Inc Pg, 19 Section 9: Photos of Sample Locations and Property Pg. 23 Section 10: Certification of Inspector & Firm Pg. 28 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 3 of 29 Purpose of Work Aspen Growth Enterprises, LLC was contacted September 25, 2026 to complete a limited asbestos building inspection of the single-family residential home located at 268 River's Bend Carbondale, CO 81623. The property is undergoing a remodel, including drywall and flooring in various locations as well as the patio near the kitchen, requiring inspection prior to remo\ A of suspect surfacing and miscellaneous materials. One load bearing wall will be modified for the installation of an elevator, requiring a demolition permit. Suspect Surfacing Material (Texture/Compound) was discovered and assessed in the areas of the home requiring renovation, including: Hand Texture on the Walls and Ceilings Throughout the Home (HA -A). Miscellaneous Materials with suspected Asbestos Containing Building Materials were sampled in the areas of the home requiring renovation, including: Drywall Core & Joint Compound on the Walls and Ceilings on the Walls and Ceilings Throughout the Home (HA-B), Insulation in the Walls and Ceilings (HA-C), Tub Mold in the Trailer (HA-D), Tile Flooring & Backer in the Trailer (HA-E), Decking on the Kitchen Patio (RA-F), Shower Surround in the Master Bathroom (HA-G), and Additional Insulation in the Walls and Ceilings (HA-H). No suspected Thermal System Insulators (TSI) were discovered or assessed in the areas of the building requiring renovation. All samples were taken in a random numerical order and the number of samples taken followed regulation standards. Brandon G. Wade, a certified and accredited Asbestos Building Inspector with the State of Colorado, performed the inspection at the request of the property owner and contractor. The Garfield County Assessor site shows that the building was constructed in 2005. The purpose of the asbestos inspection was to test for asbestos containing materials in the areas described above prior to removal or renovation. Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 4 of 29 Definition of Homogenous Areas I.B.57. - Homogenous Area means an area of surfacing material or thermal system insulation that is uniform in color, texture, and date of application." After a walkthrough of the building, the following homogeneous areas were defined. *functional spaces are described in the damage report. Homogenous Samples Area from Area Description of Homogeneous Area HA -A Surf. 268 Al - Hand Texture on the Walls and Ceilings 268 A5 Throughout the Home 268 B 1 Drywall Core & Joint Compound on the Walls HA-B Misc. 268 B2 and Ceilings on the Walls and Ceilings Throughout the Home HA-C Misc. 268 Cl 268 C2 Insulation in the Walls and Ceilings HA-D Misc. 268 DI 268 D2 Tub Mold in the Trailer HA-E Misc. 268 El 268 E2 268 F 1 268 F2 Tile Flooring & Backer in the Trailer Decking on the Kitchen Patio Shower Surround in the Master Bathroom HA-F Misc. HA-G Misc. 268 GI 268 G2 HA-H Misc. 268 H1 268 H2 Additional Insulation in the Walls and Ceilings Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com �I Eal Page 5 of 29 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 6 of 29 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 7 of 29 Colorado Regulation 8 Part B Revised 01/22/2O21 Important Definitions and Requirements Abatement, Renovation and Demolition III.A. Inspection III.A.1. Prior to any renovation or demolition in an area of public access which may disturb greater than the trigger levels of suspect asbestos -containing material (ACM), the facility component(s) to be affected by the renovation or demolition must either be assumed to be ACM or must be inspected to determine if abatement is required. Inspections conducted prior to renovation may be focused on the suspect ACM to be affected by the renovation. Inspections conducted prior to demolition must comprehensively identify all ACM in and on the facility or on the component(s) affected by the demolition. III.A. La. Individuals performing these inspections must be a Building Inspector certified in accordance with this regulation. III.A.I.b. The inspection, sampling and assessments of the suspect ACM must be performed as required in Section III.A.3. and III.A.4. of this regulation. III.A.1.c. The analysis of samples collected during these inspections must be performed as required in Section III.A.4. of this regulation. III.A. I.d. Buildings, or those portions thereof, that were constructed after October 12, 1988 will be exempt from this inspection requirement if, after due diligence, the architect or project engineer responsible for the construction of the building, or a Colorado certified Asbestos Building Inspector, completes a form specified by the Division that no ACM was used as a building material in the initial construction of the building or subsequent renovations (if applicable). NOTE: The Division recommends that all buildings be inspected prior to any renovation or demolition activities, regardless of the date of construction. III.A. I .e. To prevent any real or potential conflicts of interest, Building Inspectors identifying ACM must be independent of the GAC that will subsequently abate the ACM identified. Inspectors need not be independent of the GAC if both the certified Inspector and the certified GAC are employees of the building owner. III.A.2. During renovation or abatement activities which will impact suspect materials in quantities greater than the trigger levels or during demolition activities, the asbestos inspection report must be available onsite at all times. The inspection report is not required to be on site during the first seventy-two (72) hours of abatement activities if the abatement is being conducted under situations addressed in Sections III.E.I.e.(i), III.E.l.e.(ii), III.E.2.d.(i). and III.E.2.d.(ii). III.A.3. For each area of public access inspected to determine the presence of ACM, the certified asbestos building inspector must: III.A.3.a. Identify, quantify and categorize homogenous areas of suspect ACM. III.A.3.b. Touch all suspect ACM to determine whether the material is friable. III.A.3.c. Either assume homogeneous areas are ACM or collect, in a random manner representative of the homogeneous area, bulk samples of suspect ACM as follows: III.A.3.c.(i) Surfacing material. Additional information on sampling surfacing materials can be found in the EPA "Pink Book," Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials (1985). Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 8 of 29 III.A.3.c.(i)(A) At least three bulk samples must be collected from each homogenous area that is 1,000 square feet or less. III.A.3.c.(i)(B) At least five bulk samples must be collected from each homogenous area that is greater than 1,000 square feet but less than or equal to 5,000 square feet. III.A.3.c.(i)(C) At least seven bulk samples must be collected from each homogenous area that is greater than 5,000 square feet. IIl.A.3.c.(i)(D) Surfacing material added onto base materials (e.g. sprayed or troweled on materials, textures, paints, etc.) must be sampled and analyzed separately from the base material. III.A.3.c.(ii) Thermal system insulation. Additional information on sampling thermal system insulation can be found in the EPA "Purple Book." Guidance for Controlling Asbestos -containing Materials in Buildings (1985). III.A.3.c.(ii)(A) At least three bulk samples from each homogenous area of thermal system insulation. III.A.3.c.(ii)(B) At least one bulk sample from each homogenous area of patched thermal system insulation that is less than 6 square or linear feet. III.A.3.c.(ii)(C) In a manner sufficient to determine whether the material is ACM, collect bulk samples from mechanical system fittings such as tees, elbows, or valves. III.A.3.c.(ii)(D) Bulk samples are not required where the certified asbestos building inspector has determined the thermal system insulation is fiberglass, foam glass, rubber, or other non -ACM insulation. III.A.3.c.(iii). Miscellaneous III.A.4.c.(iii)(A) In a manner sufficient to determine whether the material is asbestos -containing, collect bulk samples from each homogeneous area. A minimum of two samples of each homogeneous area of miscellaneous material must be collected. III.A.3.d. Provide an assessment of the condition of all friable ACM which must include: III.A.3.d.(0 The location and quantity or volume of the ACM. III.A.3.d.(ii) The condition of the ACM, including: type of damage or significant damage, severity of damage, and extent or spread of damage over the homogenous area including the quantity of damaged ACM and if a major asbestos spill is present. III.A.3.e. Provide a written report of the asbestos inspection findings. The report must include: III.A.3.e.(i) The name and address or location of the structure(s) and the location in the structure of the facility component(s) inspected. III.A.3.e.(ii) The certified asbestos building inspector's name, signature, certification number, and asbestos consulting fine name and registration number. III.A.3.e.(iii) A description of the scope and purpose of the inspection. III.A.3.e.(iv) A physical description of the facility corponent(s) inspected. The description must also include: III.A.3.e.(iv)(A) The location and quantity or volume of each homogenous area of all suspect ACM. III.A.3.e.(iv)(B) A blueprint or diagram clearly illustrating sample locations, and each homogenous area determined or assumed to be ACM. Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 9 of 29 III.A.3.e.(iv)(C) A description of the manner used to determine sampling locations. Additional information on sampling surfacing materials can be found in the EPA "Pink Book," asbestos in buildings: Simplified Sampling Scheme for Friable Surfacing Materials (1985). Additional information on sampling thermal system insulation can be found in the EPA "Purple Book," Guidance for Controlling Asbestos - containing Materials in Buildings (1985). III.A.3.e.(v). The assessment of friable ACM as required in Section III.A.3.d. The Inspector shall classify the ACM and materials assumed to be ACM into one of the following categories: III.A.3.e.(v)(A) Damaged or significantly damaged thermal system insulation ACM. III.A.3.e.(v)(B) Damaged friable surfacing ACM. III.A.3.e.(v)(C) Significantly damaged friable surfacing ACM. III.A.3.e.(v)(D) Damaged or significantly damaged friable miscellaneous ACM. III.A.3.e.(v)(E) ACM with potential for damage. III.A.3.e.(v)(F) ACM with potential for significant damage. III.A.3.e.(v)(G) Any remaining friable ACM or friable suspected ACM III.A.3.e.(vi) The certified asbestos building inspector's summary of findings. III.A.3.e.(vii) A copy of the analytical report including the name and address of the laboratory performing the analysis, the laboratory's registration and accreditation, the chain of custody form, the date of analysis, the name and signature of the person performing the analysis, the method of analysis, and the results of the analysis. III.A.4. Analysis III.A.4.a. Bulk samples collected under Section II1.A.3.c. and submitted for analysis must be analyzed for asbestos using laboratories accredited by the National Institutes of Standards and Technology (NIST). Laboratories must also be registered as required in subsection II.M. III.A.4.b. Bulk samples must be analyzed for asbestos content by PLM, using the United States Environmental Protection Agency's August 1994 Method EPA/600/R-93/116, "Method for Determination of Asbestos in Bulk Building Materials." III.A.4.c. With the exception of drywall systems (drywall, tape, and joint compound), bulk samples must not be composited for analysis. Drywall and associated joint compound utilized to fill seams and nail holes may be composited utilizing the procedures given in the January 5, 1994 Federal Register, Volume 59, No. 3. Any composite analysis must be performed by the laboratory who analyzed the bulk sample. Materials added onto drywall and other base materials (e.g. sprayed or troweled on materials, textures, paints, etc.) must be sampled and analyzed separately. III.A.4.d. If the asbestos content of a sample of friable ACM is estimated to be 1 % or less but greater than 0% by a method other than point counting, either the analytical process must be repeated by the accredited laboratory using the point counting technique utilizing PLM or the material will be assumed to be asbestos containing. If a result obtained by point count is different from a result obtained by visual estimation, the point count result must be used. Non -friable samples do not have to be point counted. III.A.4.e. Interpreting Bulk Sample Results III.A.4.e.(i) A homogeneous area is considered not to contain ACM only if the results of all samples required to be collected from that area show asbestos in amounts of one percent or less. Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 10 of 29 III.A.4.e.(ii) A homogeneous area will be determined to contain ACM based on a finding that the results of at least one sample collected from that area shows that asbestos is present in an amount greater than one percent. III.A.4.f. The name and address of each laboratory performing an analysis, the laboratory registration and accreditation, the date of analysis, and the name and signature of the person performing the analysis be submitted to the person requesting the asbestos building inspection and analysis. III.A.5. Abatement in accordance with Regulation Number 8, Part B is required prior to renovation if the amount of ACM to be disturbed in connection with the renovation: 1) is friable or will be made friable; 2) is in an area of public access or will impact an area of public access; and 3) exceeds the trigger levels. III.A.6. Abatement in accordance with Regulation Number 8, Part B is required prior to demolition if the amount of ACM to be disturbed in connection with the demolition: 1) is friable or will be made friable; 2) is in an area of public access or will impact an area of public access; and 3) exceeds the trigger levels. Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 11 of 29 Results Bulk sampling of building materials was made. Testing was performed in accordance with industry regulations. Random and Representative Sampling was performed of Homogenous Areas. All miscellaneous materials were sampled in accordance with the EPA directive dated February 28, 2018. (Reference Sampling Miscellaneous Materials EPA FAQ 39 and 43). Bulk samples were submitted and analyzed by Eurofins Reservoirs, Inc. The samples obtained were analyzed by method of Polarized Light Microscopy. Testing from this laboratory is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) Lab Code 101896-0 for Polarized Light Microscopy (PLM). The following table describes the samples taken of suspected Asbestos Containing Materials. Type of Sample Homogenous Physical Asbestos Client Sample # (Surfacing, TSI, Area (HA) Description Content Misc.) Room Location 268 Al Surf. HA -A Primary Bath Non -Detect Hand Texture Primary 268 A2 Surf. HA -A Bedroom Hand Non -Detect Texture 268 A3 Surf. HA -A Debris Hand Non -Detect Texture Hallway 1 Hand 268 A4 Surf. HA -A Texture Non -Detect 268 A5 Surf. HA -A Foyer Hand Non -Detect Texture 268 B 1 Misc. HA-B Trailer Drywall Core/J.C. Debris Non -Detect 268 B2 Misc. HA-B Foyer Drywall Core/J.C. Non -Detect Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 12 of 29 Trailer Wall 268 Cl Misc. HA-C Insulation Non -Detect Debris 268 C2 Misc. HA-C Bedroom Non -Detect Insulation Wall 268 DI Misc. HA-D Trailer Tub Non -Detect Mold Debris 268 D2 Misc. HA-D Trailer Tub Non -Detect Mold Debris Trailer Tile 268 E1 Misc. HA-E Flooring/Backer Non -Detect Debris Trailer Tile 268 E2 Misc. HA-E Flooring/Backer Non -Detect Debris 268 F 1 Misc. HA-F Kitchen Patio Non -Detect Decking 268 F2 Misc. HA-F Kitchen Patio Non -Detect Decking Primary Bath 268 GI Misc. HA-G Shower Non -Detect Surround Primary Bath 268 G2 Misc. HA-G Shower Non -Detect Surround 268 H 1 Misc. HA-H Ceiling Non -Detect Insulation Non -Detect 268 H2 Misc. HA-H Ceiling Insulation Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 13 of 29 Functional Spaces and Damage Report The functional spaces and the condition of the sampled materials are described in the table below. Condition will describe the level to which, if at all, the sampled material is damaged at the time of inspection. Good — Material with no visible damage or deterioration or showing only very limited damage or deterioration. Damaged — The surface is crumbling, blistered, water -stained, gouged, marred, or otherwise abraded over less than one -tenth if the damage is evenly distributed (one quarter if the damage is localized). Significantly Damaged — One -tenth of the surface is crumbling, blistered, water -stained, gouged, marred, deteriorated, showing adhesive failure or if the material is hanging from the surface (one quarter if the damage is localized). ACBM Location ACBM Characteristics Assessment Results Hom. Functional Friable/ % Amt of Potential Cause of Area Space Type Non- Asbestos Material Condition for Damage # Friable Inspected Damage >1,000 Hand sq. ft. but Texture on <5,000 HA- the Walls Surf. Friable ND sq. ft. Good High N/A A and Ceilings (Approx Throughout 4,270 sq. the Home ft.) Drywall Core & Joint Compound (Approx. HA- on the Walls Misc. Friable ND 4,270 sq. Good High N/A B and Ceilings ft.) on the Walls and Ceilings Throughout the Home Insulation in (Approx. HA- the Walls Misc. Friable ND 4,270 sq. Good High N/A C and Ceilings and Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 14 of 29 HA- Tub Mold in Misc. Non- ND (Approx. Good High N/A D the Trailer Friable 30 sq. ft) Tile HA- Flooring & Non- (Approx. E Backer in Misc. Friable ND 1,330 sq. Good High N/A the Trailer ft.) Decking on Non _ (Approx. HA-F the Kitchen Misc, Friable ND 120 sq. Good High N/A Patio ft.) Shower HA- G Surround in the Master Misc. Non- Friable ND (Approx. 80 sq. ft.) Good High N/A Bathroom Additional HA- Insulation in Non- (Approx. H the Walls Misc. Friable ND 4,270 sq. Good High N/A and Ceilings ft.) rotentiai for damage rated "high" as the affected materials are expected to be renovated. Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 15 of 29 Recommendations None of the materials sampled tested positive for asbestos. It is safe to proceed with removal of affected surfacing and miscellaneous materials in the homogenous areas specified above. Destructive sampling techniques were not used during this inspection. It is possible that additional materials are present that were not visible or accessible during this assessment. A demolition permit is required only if structural modifications are being made to exterior, load bearing, or roofing structures. If any previously unknown or undiscovered materials are found during demolition activities, which are suspect for asbestos content, then these materials should be tested for potential asbestos content prior to continuing any further demolition work. Disclaimer This inspection was performed using non-invasive sampling techniques. This report does not imply, or guarantee that every material on the property, or in the property building, which may have asbestos as a component, has been identified and/or sampled. A guarantee that all asbestos materials have been identified and/or sampled would require cost -prohibitive and destructive sampling protocols. Furthermore, identified asbestos containing materials may be in areas which are inaccessible or hidden due to their application during the construction process and their subsequent enclosure or covering with building and finish materials. Areas behind walls, inside chases, or other hidden, covered, or enclosed areas were not included within the scope of this inspection, as destructive techniques would have been required to access these areas. These areas should be inspected whenever renovation or demolition activities are scheduled which may disturb the materials within or beneath these barriers. "Overspray" or excess materials from the installation or application process of asbestos containing materials is common, should be expected in the vicinity of installed asbestos containing materials, and is often present either covered by other building materials or in hidden or unexpected locations. This inspection cannot determine the presence of these materials and their locations; therefore, the determination of these locations and material quantities is outside the scope of this inspection. Bulk material samples are obtained in accordance with applicable regulations, industry standard techniques and analyzed by a NVLAP accredited laboratory; however, due to the application and/or initial mixing process no guarantee can be made as to the "exact" percentage of asbestos content (this includes "no asbestos detected" and "trace" contents) which represents the entirety of the material (asbestos content fluctuations can and will occur throughout a building material). Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 16 of 29 Please call with any questions you may have concerning this report or recommendations. Brandon G. Wade Colorado Certified Building Inspector #25746 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com m 1 1 ... . ..... ........ :C rrCl i L no 1.4 cl ILf x C, z < nt O 3 L cr 0 Page 17 of 29 71 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 18 of 29 0 ffi;� 01 1 Mow .. . ....... IV Imw 1212W 93 MN-N. 9-4 to mu. III Ln Lu ir L c I Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com EV rr :�Y Rxs_ iai s Gl i>•ilnV� eurofins September 28. 2026 Brandon Wade Aspen Growth Enterprises LLC 2980 Mesa Ave. Grand Junction, CO 81504 Dear Brandon, Page 19 of 29 o•aaoc,ft, tiR:,--11Af, vmc l Subcontractor Number: Laboratory Report: RES 789991-1 Project WRO. #: None Given Project Description: 268 Rivers Bend 81523 Eurofins Reservoirs is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVL4P), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American Industrial Hygiene Association (AIHA LAP), Lab ID 101533 for Phase Contrast Microscopy (PCM) analysis_ This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively. Eurofins Reservoirs has analyzed the following samples for asbestos content as per your request, The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office. RES 789991-1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer, Eurofins Reservoirs will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed, as received and with the information provided by the customer (i.e. samplu volumes and areas). This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Eurofins Reservoirs_ Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986. Sincerely, by camyn Be g.11,- Jeanne Spencer President 0030,11 row Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com U z J z W c zy--� V O m � n 2 o z o a W w U 0` JV Q W Z 2 GA W _z NL �.L Z W J mpp J a N Jl a t N M O L W W C ry N s r G m N N O N � y d (� > m n a _ : O Cf7 EO E TW E. a p F` < z N O W 2= f%} C O O O U 0 0 0 0 0 0 0 0 0 0 O p C 0 0 0 0 0 0 0 0 0 0 0 U) o 0 Z C O N O N O N O N O N O O aD - d E 0 U oo 0 o 0 0 0 o c o o o 0 o o v. LL ¢ E U m m `. ❑ 0 0 0 0❑00❑ O❑ 000 m Z Z Z Z Z Z Z Z Z Z Z Z Z Z - a o0 :J 0 w n m Q N u) r fn d � o 0 0 0 0 0 0 0 0 0 0 0 0 0 N m V m y c0 v c0 V c0 N c'] V C ,O a a U 1L m m C C C C Q `a ❑ 1Oa a a a m y C N N N m pJ X C X C X C X C X C C o E C d N >N >N - - }L- m N LN N N - 1 ¢ m¢ m <( m¢ m¢ m¢ m U❑ -j¢>wX m y m � ❑ m m` T °o F ai U E z n 7 m m m G T T ❑ W a N ( O an N CO E E d d O 2 LL H ''''�f O- C _ ¢ ¢ Q Q ¢ m E o) m m m m m m o J rn rn rn n rm- co M c _ r- I Page 20 of 29 yx ES U �s sg i� Et Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com 0 Z Q Z J.I O R {per N pJ O z O L m a U O U � > Ja a W z = to 4 LU z M 0 W M su W D O En z O O m a 0 J a O J d U N W y� n a CL c z t ° q N - uj a w a N o N LU r N q M m O_ C m N N N 9 .II 0 >_ Eo E J O) d Oj Q' q q 0. Q h Q Z N fn W W' fA N N U O O U 0 0 0 U U C U O U o C O DC O 4, 0 0 0 0 0 0 0 G O O O O a)CDU m r r O) O) o 0 0 o O o a E U ! r 0 o o O O C N z y� A LL O n. U m N 0 0 0 0 0 0 0 0 0 coo 0❑ m z z z z z z z z z z z z z z N E W U m `a• c N;.i N u� C _C N t9 C D_ N N N N O T U N N a m cL N U E m m m Q a � U N N E f0 E 16 C O O U U 0 a E c m m m ,u o :, o N° m �� m o� E c � - E� Gl N N C C N N N •_ E N y1 _ +-• �F FT FT Q c0 U D Q C< d Q T cD U J Q} W 2 N � N N V N m N Q C C C (j m o N o 0 0 0 iV C N L LL � `m T N y 10 l0 10 f0 m LL U7 N N c EE c N m U U cl in W •'� m m m co m cc)0 a co ccccN❑ LL1,N N� � `o rn rn rn rn� a rn a> rn m m rn W W CO 4^i m q {gyp � Page 21 of 29 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com 0 z / z ' LU » 0 �§2 S\2 LU ® )` \ e�s u > \�\ E/» ) @ , o \ \ j \ ƒ 0 ( ° rc \ / 10 m & rL .0 \ ;a] \ ;�(D2k� E a ƒ[!x-\«a < r-< N0Wg$ \ & )\ 0\k. < k w 2 2 _ ] /IL \ 0 E. aC, C, z/c G §!!f 7CL CD Q CD 0 0 0 z{f( 3 ` zzzzzzz= /� -- J' ! \ § )) «))2mem/\ f \ ) 7)\I\«)) \}}/6 u<»uz<<<cn<In ) } i { ! !\\U) rig/ \ -- k.{a { -- L § ff g 33 ® e o B 7 ? \ 00 co +/( a m RO ] ( / $ 7 � \ Q Page 22 0 2 I Phone: (7)712-131 Aspen Growth EGmKs�es swae4Apn-rwt6cm .a ....s��. � Irv... Wow— •' `` - t s-�4f� T ` _ r Page 23 of 29 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 24 of 29 I, i�j, Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com i - I Q..yA. �npC• I.''N � - s � 't 1.w. �t•� !! 1 �I� / IJ��:✓l. Page 25 of 29 ►F �r �.� "Cu 2.2 V O � ~ allIt 1 ...�,.BF.• �, �.�:� ra �.,+�' �-lam y { 3 kvn ■ Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com Page 26 of 29 -rf,i3 u-7 ;►hry hSk1.J.�4 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com ■ ■ Page 27 of 29 i Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com of cots * 1876 Colorado Department of Public Health and Environment ASBESTOS CERTIFICATION* This certifies that Brandon G. Wade Certification No.: 25746 has met the requirements of 25-7-507, C.R.S. and Air Quality Control Commission Regulation No. 8, Part B, and is hereby certified by the .5W state of Colorado in the following discipline: Building Inspector* Lr;:: Issued: October 31, 2025 Expires: October 31, 2026 * This certificate is valid only with the possession ofa current Division -approved training course certiTcation in the discipline specified ahove. Aulhorapd r1F D ka&ssGenlative SEAL Page 28 of 29 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com r •� .a E z •�s� Mw. � 0 o Cf1 [� r���/I � La W i 7 Page 29 of 29 71 G O cc •� � - •W b � r CD 4 � y7 yyO an CC O F 7.x b C N N N O J p C ri - n CT, f 1 N �J,•. •^ " z z F 0 Phone: (970) 712-1381 Aspen Growth Enterprises swade@aspen-growth.com