Loading...
HomeMy WebLinkAboutConditions of Permit2 3. 21 5 6 CONDITIONS OF PERMIT B LCO-09-26-10098 RANCH AT ROARING FORK HOA REPLACE EXISTING WATER TANK AND PIPING 14913 HIGHWAY 82, CARBONDALE THE GEOTECH ENGINEER OF RECORD IS REQUIRING AT A MINIMUM AN OBSERVATION AND/OR TEST FOR THE FOLLOWING, PLEASE SUBMIT A STAMPED ACCEPTANCE LETTER FROM THE ENGINEER OF RECORD. • COMPLETED EXCAVATION • PLACEMENT OF COMPACTION OF FILL • PIER/PILE DRILLING OPERATIONS • PROPOSED IMPORT OR ONSITE FILL MATERIAL • PLACEMENT AND COMPACTION OF PAVEMENT SUBGRADE. SUBBASE. BASE COURSE AND ASPHALT. BECAUSE THE DRILLED PIERS ARE NOT ALLOWED TO STAY OPEN OVERNIGHT. THE STRUCTURAL ENGINEER IS TO INSPECT THE PIER REBAR. THE COUNTY WILL INSPECT THE MAT SLAB REBAR. PLEASE PROVIDE THE REBAR APPROVAL FOR THE PIERS AT THE MATT SLAB INSPECTION. ALL INFRASTRUCTURE PIPING AND STORM\NfATER DRAINAGE IS TO BE INSPECTED BY THE CIVIL ENGINEER OF RECORD. A STAMPED LETTER FROM THE ENGINEER ACCEPTING ALL INFRASTRUCTURE INSTALLATION IS REQUIRED PRIOR TO THE FINAL INSPECTION. 3RD PARTY SPECIAL INSPECTIONS REQUIRED FOR BOLTING ,AND WELDING. PLEASE PROVIDE THE REPORT TO THE BUILDING INSPECTORS. THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 7. A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE RMITS 8. UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 9. DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES. 10. ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 11. PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING DEPARTMENT, WELDING AND BOLTING IS MINIMUM. 12. INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK. 13. CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. 14. REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON - SEEDED AREA. 15. PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED. 16. PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.