CONDITIONS OF PERMIT
B LCO-09-26-10098
RANCH AT ROARING FORK HOA
REPLACE EXISTING WATER TANK AND PIPING
14913 HIGHWAY 82, CARBONDALE
THE GEOTECH ENGINEER OF RECORD IS REQUIRING AT A MINIMUM AN
OBSERVATION AND/OR TEST FOR THE FOLLOWING, PLEASE SUBMIT A
STAMPED ACCEPTANCE LETTER FROM THE ENGINEER OF RECORD.
• COMPLETED EXCAVATION
• PLACEMENT OF COMPACTION OF FILL
• PIER/PILE DRILLING OPERATIONS
• PROPOSED IMPORT OR ONSITE FILL MATERIAL
• PLACEMENT AND COMPACTION OF PAVEMENT SUBGRADE. SUBBASE.
BASE COURSE AND ASPHALT.
BECAUSE THE DRILLED PIERS ARE NOT ALLOWED TO STAY OPEN OVERNIGHT.
THE STRUCTURAL ENGINEER IS TO INSPECT THE PIER REBAR. THE COUNTY
WILL INSPECT THE MAT SLAB REBAR. PLEASE PROVIDE THE REBAR APPROVAL
FOR THE PIERS AT THE MATT SLAB INSPECTION.
ALL INFRASTRUCTURE PIPING AND STORM\NfATER DRAINAGE IS TO BE
INSPECTED BY THE CIVIL ENGINEER OF RECORD. A STAMPED LETTER FROM
THE ENGINEER ACCEPTING ALL INFRASTRUCTURE INSTALLATION IS
REQUIRED PRIOR TO THE FINAL INSPECTION.
3RD PARTY SPECIAL INSPECTIONS REQUIRED FOR BOLTING ,AND WELDING. PLEASE
PROVIDE THE REPORT TO THE BUILDING INSPECTORS.
THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
7. A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE
RMITS
8. UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
9. DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED
PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE
CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY.
EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY
INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES.
10. ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
11. PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING
DEPARTMENT, WELDING AND BOLTING IS MINIMUM.
12. INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
13. CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING
PLANTS AND SEEDS.
14. REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON -
SEEDED AREA.
15. PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED.
16. PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.