Loading...
HomeMy WebLinkAboutChris Hale Stormwater Memo Update COAFrom:Chris@mountaincross-eng.com To:Philip Berry Subject:RE: stormwater plan - eagle springs organic large solar Date:Tuesday, August 15, 2023 1:56:06 PM Philip: I reviewed the document and I had no comments. Let me know if you need anything else. Thanks. Sincerely, Mountain Cross Engineering, Inc. Chris Hale, P.E. 826 1/2 Grand Avenue Glenwood Springs, CO 81601 Ph: 970.945.5544 Fx: 970.945.5558 From: Philip Berry <pberry@garfield-county.com> Sent: Monday, July 31, 2023 11:08 AM To: Chris@mountaincross-eng.com Subject: stormwater plan - eagle springs organic large solar Attached is an updated version of their stormwater plan for application (MPPA-04-23-8956). I’m finalizing my staff report for the BOCC hearing that will be next Monday. This item is a recommended Condition of Approval that they are trying to fulfill as soon as possible. No giant rush on our end for review though. Please call if you have any questions or concerns. Thanks Philip Berry, AICP Planner Garfield County – Community Development Department 108 8th. St., Suite 401 Glenwood Springs, CO 81601 Pberry@garfield-county.com Office: 970-945-1377 (1580) Cell: 970-456-4404 neiengineering.com + 303-431-7895 12600 W Colfax Avenue, Suite C500, Lakewood, CO 80215 To: Joshua Mayer AES Clean Energy The AES Corporation 282 Century Place, Suite 2000 Louisville, CO 80027 From: NEI Electric Power Engineering, Inc. 12600 W Colfax Avenue, Suite C500 Lakewood, CO 80215 Date: July 12, 2023 Project Name: Eagle Springs Solar Project No.: 4084.001 Subject: Stormwater Memo (30% Review) Eagle Springs Solar is a proposed solar facility located near County Road 315 and 346, Garfield County, approximately 1 mile east of the Rifle Garfield County Airport. Disturbed area of this project will be limited to approximately 68.0 acres of the 301-acre lot. The project is expected to change approximately 64,843 sq-ft (1.49 ac; 2.19% lot coverage) of pervious area into impervious area. The impervious area will consist of four (4) concrete equipment pads, two (2) gravel access roads, and foundations for solar arrays. Onsite drainage patterns will be maintained with exception to minor grading related to proposed gravel roads; there a Drainage Report is not required per county standards. This memo is intended to provide Garfield County with drainage and land disturbance information with respect to this project. Existing Conditions The project site is mostly developed agricultural fields throughout the property. The undeveloped land cover consists of agriculture fallow, native vegetation, sparse weeds and grasses. The topography consists of rolling hills, plains and mesas. The existing soils on site are primarily type C. The site generally drains from southeast to northwest atop a mesa with approximately 160 ft of topographic relief. Stormwater runoff sheet flows northwest and AES Clean Energy Eagle Springs Solar STORMWATER MANAGEMENT PLAN p. ii collects in dispersed ephemeral ditches. These ditches convey flow northwest into an approximately 1.8 ac. detention basin. This basin discharges to the Last Chance Ditch, thence into Mamm Creek, thence into the Colorado River approximately 1.0 mile northwest of the project site. Proposed Conditions Construction activities associated with the proposed solar facility will affect approximately 68.0 acres onsite. However, much of the disturbed area will involve construction of support structures for solar panel arrays, leaving the surface beneath the panels undeveloped and pervious. This undeveloped area will be seeded with a grass mix to further reduce peak runoff. These solar arrays are not expected to result in a significant creation of impervious area. The project also proposes four (4) concrete equipment pads, an integrated switch gear pad, and gravel access roads. In total, the project will result in the generation of approximately 64,843 sf of impervious area which covers 2.19% of the project site. Grading activities will be localized around the gravel access road and existing drainage patterns will be maintained. Impervious Area Calculations Quantity Area (ft2) Impervious Factor Impervious Area (ft 2) Equipment Pads 3 7,920 1.0 23,760 Equipment Pad with Switchgear 1 11,991 1.0 11,991 Array Piles 3,705 ~0.037 1.0 139 Gravel Access Road 1 72,383 0.4 28,953 Total Area (ft2) 64,843 Total LOD (ft2) 2,961,082 Coverage Ratio 2.19% Table 1 – Impervious Area Calculations A gravel access road will cross existing stormwater conveyances; therefore, the project also proposes three (3) culverts, which will be discussed below. Stormwater Management Strategy Permanent stormwater management is not required for the proposed development. Project area drainage areas are to be maintained and runoff will decrease to due changed land use. The land use is being changed from agricultural row crops to grass cover. Using a grass seed mix to restore all areas of disturbance, stormwater quality will be improved. The seed mix will also decrease the quantity of peak stormwater runoff previously experienced on site. AES Clean Energy Eagle Springs Solar STORMWATER MANAGEMENT PLAN p. iii The pre and post development runoff volumes have been modeled using the TR-55 method in Autodesk’s Storm and Sanitary Analysis. Calculation details can be found in the attachments of this memo. The runoff volumes are as follows: 2-Year Runoff (CFS) 25-Year Runoff (CFS) Existing 16.24 66.15 Proposed 5.90 42.67 Table 2 – Pre & Post Development Basin Runoff Results Flood Zone The project site would be reported on Flood Insurance Rate Map (FIRM) community panel 0802051360B. Currently the panel is not printed, and flood hazard areas are unidentified. However, the project site is approximately 160 and 130 ft above the intermittent creeks to the north and west, respectively. Therefore, this project is not expected to be negatively impacted, nor negatively impact these creeks. Culvert Design This project proposes an access road which intersects existing drainage routes. This crossing requires culverts to maintain drainage through the site. The culverts are designed to convey the 25-yr peak flow from their contributing drainage basin. The 25-yr storm event (4% annual exceedance probability) is the typical design storm for stormwater conveyances per the County’s Land Use & Development Code (2013). The UDFCD’s modified rational method, an allowable reference per CDOT’s Drainage Design Manual (DDM, 2019), was used to quantify the 25-yr peak flow for each culvert’s contributing drainage basin. The following equation is referenced: Q25 =C25 ∙ I25 ∙ A Where Q25 is the 25-yr peak flow (cfs), A is the contributing drainage area (acres), I 25 is the rainfall intensity in inches per hour for a duration equal to the time of concentration, and C 25 is the runoff coefficient from equations based on NRCS soil groups and storm return period. For soil groups C/D, the runoff coefficient was determined from the equation: CC/D = 0.56i + 0.319 (i = % Imperviousness expressed as a decimal) The runoff coefficient, C, used was 0.33 and the rainfall intensity, I, used was 0.502 inches per Hour with a basin Tc of 2 hours. Rainfall depth was derived from “NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES”. AES Clean Energy Eagle Springs Solar STORMWATER MANAGEMENT PLAN p. iv Existing culverts are constructed of CMP, proposed culverts are to be RCP, which both have a roughness coefficient (n) of 0.012 per the DDM. The results of the hydraulics calculations are shown in Table 3 below. Table 3 – Culvert Sizing Results Summary The project proposes 1.49 ac of impervious area, which consists of concrete equipment pads, gravel access roads, and foundations for solar arrays. This impervious area constitutes 2.19% of the solar development area. The project will not alter existing drainage patterns, thus does not require a drainage report. The proposed access roads will require the installation of three (3) culverts. Initial sizing has been provided and will be refined as the site design develops. Attachments • Hydrology Basin Exhibit • Pre & Post Development SSA ASCII Report W W W W W W W W W W W W W W W W W W W W W W W W 562 5 563 0 563 5 5622 56 2 3 562 4 562 6 562 7 562 8 5629 5 6 3 1 56 3 2 563 3 563 4 5 6 0 5 5 6 0 5 5 6 0 5 56 0 5 5 6 1 0 5 6 1 0 5610 5615 562 0 5625 5 6 3 0 5 6 0 3 5 6 0 3 5 6 0 4 56 0 4 5 6 0 6 560 6 5 6 0 6 5 6 0 7 5607 5 6 0 7 5 6 0 8 5608 5 6 0 8 5 6 0 9 5 6 0 9 5609 5611 5 6 1 1 5 6 1 1 5 6 1 2 56 1 2 5612 56135614 5616 5617 5618 5619 5621 5622 5623 5624 5626 5 6 2 7 5 6 2 8 56 2 9 5 6 3 1 5632 DRAINAGE BASIN 1 (33.08 AC.) DRAINAGE BASIN 2 (0.69 AC.) DRAINAGE BASIN 3 (19.06 AC.) DRAINAGE BASIN 4 (18.36 AC.) DATE PROJECT TITLE: DESCRIPTION APV: PROJECT LOCATION: NO. KEY PLAN: PE STAMP: REVISIONS: SHEET NO:REV: SCALE AT 24" x 36": CHK: DWN: DES: DATE: PROJ NUM: SHEET TITLE & DESCRIPTION: 2180 South 1300 East, Suite 600 Salt Lake City, UT 84106-2749 (801) 679 - 3500 ELECTRIC POWER ENGINEERING, INC. 12600 W. COLFAX AVE, STE. C500 LAKEWOOD, CO 80215 (303) 431-7895 www.neieng.com 0 100'200'300'400' 1" = 200' A 3/29/23 HYDROLOGY_BASIN_EXHIBIT B 7/12/23 HYDROLOGY_BASIN_EXHIBIT --- --- - PL O T T E D : 7/ 1 2 / 2 0 2 3 1 1 : 2 7 A M H: \ P r o j e c t \ 4 0 0 0 \ 4 0 8 4 . 0 0 1 - E a g l e S p r i n g s P V B E S S - 3 0 p c t P V B E S S - A E S \ 4 _ D W G s \ 2 _ N E I \ S o l a r \ P V C I V \ S t o r m w a t e r M e m o E x h i b i t \ D R A I N A G E M E M O E X H I B I T . d w g -- --- --- --- JPD 07/12/2023 EX-1.0 A 4084.001 JJS JJS JPD AE S T i t l e b l o c k 2 4 X 3 6 v 2 1 0 2 0 9 PRELIMINARY NOT FOR CONSTRUCTION FOR REVIEW & APPROVAL ONLY 200'100'0 200'400'600' 1"=200' N LEGEND: MODULE BUILDABLE AREA PARCEL BOUNDARY FENCE SETBACK LINE LoD LIMIT OF DISTURBANCE IRRIGATION LINES FENCE SETBACK LINE W OVERHEAD POWER LINESOHE DRAINAGE BASIN HYDROLOGY BASIN EXHIBIT SILT, CO HYDROLOGY BASIN EXHIBIT CIVIL Autodesk® Storm and Sanitary Analysis 2016 - Version 13.5.302 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. Eagle Springs Hydrology.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. SCS TR-55 Time of Concentration...... SCS TR-55 Storage Node Exfiltration.. None Starting Date ............. JUN-28-2023 00:00:00 Ending Date ............... JUN-29-2023 00:00:00 Report Time Step .......... 00:05:00 ************* Element Count ************* Number of rain gages ...... 3 Number of subbasins ....... 1 Number of nodes ........... 1 Number of links ........... 0 **************** Subbasin Summary **************** Subbasin Total Peak Rate Area Factor ID acres ------------------------------------------ Sub-01 128.81 484.00 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ Out-01 OUTFALL 0.00 0.00 0.00 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 13.041 1.215 Surface Runoff ........... 0.289 0.027 Continuity Error (%) ..... -0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 2.883 0.939 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ****************************************** Composite Curve Number Computations Report ****************************************** ------------------ Subbasin Sub-01 ------------------ Area Soil Soil/Surface Description (acres) Group CN ---------------------------------------------------------------------------------------- Row crops, straight row, Good 128.81 C 85.00 Composite Area & Weighted CN 128.81 85.00 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness ------------------ Subbasin Sub-01 ------------------ Sheet Flow Computations ----------------------- Subarea A Subarea B Subarea C Manning's Roughness: 0.20 0.00 0.00 Flow Length (ft): 100.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 2 yr, 24 hr Rainfall (in): 1.20 1.20 1.20 Velocity (ft/sec): 0.09 0.00 0.00 Computed Flow Time (minutes): 18.42 0.00 0.00 Shallow Concentrated Flow Computations -------------------------------------- Subarea A Subarea B Subarea C Flow Length (ft): 3464.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 Surface Type: Straight rows Unpaved Unpaved Velocity (ft/sec): 1.42 0.00 0.00 Computed Flow Time (minutes): 40.66 0.00 0.00 ================================================================================================ Total TOC (minutes): 59.08 ================================================================================================ *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- Sub-01 1.20 0.28 16.24 85.000 0 00:59:04 -------------------------------------------------------------------------- Analysis began on: Wed Jun 28 15:15:41 2023 Analysis ended on: Wed Jun 28 15:15:42 2023 Total elapsed time: 00:00:01 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Autodesk® Storm and Sanitary Analysis 2016 - Version 13.5.302 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. Eagle Springs Hydrology.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. SCS TR-55 Time of Concentration...... SCS TR-55 Storage Node Exfiltration.. None Starting Date ............. JUN-28-2023 00:00:00 Ending Date ............... JUN-29-2023 00:00:00 Report Time Step .......... 00:05:00 ************* Element Count ************* Number of rain gages ...... 3 Number of subbasins ....... 1 Number of nodes ........... 1 Number of links ........... 0 **************** Subbasin Summary **************** Subbasin Total Peak Rate Area Factor ID acres ------------------------------------------ Sub-01 128.81 484.00 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ Out-01 OUTFALL 0.00 0.00 0.00 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 23.908 2.227 Surface Runoff ........... 0.998 0.093 Continuity Error (%) ..... -0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 9.969 3.249 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ****************************************** Composite Curve Number Computations Report ****************************************** ------------------ Subbasin Sub-01 ------------------ Area Soil Soil/Surface Description (acres) Group CN ---------------------------------------------------------------------------------------- Row crops, straight row, Good 128.81 C 85.00 Composite Area & Weighted CN 128.81 85.00 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness ------------------ Subbasin Sub-01 ------------------ Sheet Flow Computations ----------------------- Subarea A Subarea B Subarea C Manning's Roughness: 0.20 0.00 0.00 Flow Length (ft): 100.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 2 yr, 24 hr Rainfall (in): 1.20 1.20 1.20 Velocity (ft/sec): 0.09 0.00 0.00 Computed Flow Time (minutes): 18.42 0.00 0.00 Shallow Concentrated Flow Computations -------------------------------------- Subarea A Subarea B Subarea C Flow Length (ft): 3464.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 Surface Type: Straight rows Unpaved Unpaved Velocity (ft/sec): 1.42 0.00 0.00 Computed Flow Time (minutes): 40.66 0.00 0.00 ================================================================================================ Total TOC (minutes): 59.08 ================================================================================================ *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- Sub-01 2.20 0.94 66.15 85.000 0 00:59:04 -------------------------------------------------------------------------- Analysis began on: Wed Jun 28 15:16:14 2023 Analysis ended on: Wed Jun 28 15:16:15 2023 Total elapsed time: 00:00:01 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Autodesk® Storm and Sanitary Analysis 2016 - Version 13.5.302 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. Eagle Springs Hydrology - Proposed.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. SCS TR-55 Time of Concentration...... SCS TR-55 Storage Node Exfiltration.. None Starting Date ............. JUN-28-2023 00:00:00 Ending Date ............... JUN-29-2023 00:00:00 Report Time Step .......... 00:05:00 ************* Element Count ************* Number of rain gages ...... 3 Number of subbasins ....... 1 Number of nodes ........... 1 Number of links ........... 0 **************** Subbasin Summary **************** Subbasin Total Peak Rate Area Factor ID acres ------------------------------------------ Sub-01 128.81 484.00 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ Out-01 OUTFALL 0.00 0.00 0.00 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 13.041 1.215 Surface Runoff ........... 0.146 0.014 Continuity Error (%) ..... -0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 1.461 0.476 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ****************************************** Composite Curve Number Computations Report ****************************************** ------------------ Subbasin Sub-01 ------------------ Area Soil Soil/Surface Description (acres) Group CN ---------------------------------------------------------------------------------------- Row crops, straight row, Good 59.52 C 85.00 Imperv-areas 1.34 - 98.00 > 75% grass cover, Good 67.95 C 74.00 Composite Area & Weighted CN 128.81 79.33 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness ------------------ Subbasin Sub-01 ------------------ Sheet Flow Computations ----------------------- Subarea A Subarea B Subarea C Manning's Roughness: 0.20 0.00 0.00 Flow Length (ft): 100.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 2 yr, 24 hr Rainfall (in): 1.20 1.20 1.20 Velocity (ft/sec): 0.09 0.00 0.00 Computed Flow Time (minutes): 18.42 0.00 0.00 Shallow Concentrated Flow Computations -------------------------------------- Subarea A Subarea B Subarea C Flow Length (ft): 3464.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 Surface Type: Straight rows Unpaved Unpaved Velocity (ft/sec): 1.42 0.00 0.00 Computed Flow Time (minutes): 40.66 0.00 0.00 ================================================================================================ Total TOC (minutes): 59.08 ================================================================================================ *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- Sub-01 1.20 0.14 5.90 79.330 0 00:59:04 -------------------------------------------------------------------------- Analysis began on: Wed Jun 28 15:12:53 2023 Analysis ended on: Wed Jun 28 15:12:54 2023 Total elapsed time: 00:00:01 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Autodesk® Storm and Sanitary Analysis 2016 - Version 13.5.302 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. Eagle Springs Hydrology - Proposed.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. SCS TR-55 Time of Concentration...... SCS TR-55 Storage Node Exfiltration.. None Starting Date ............. JUN-28-2023 00:00:00 Ending Date ............... JUN-29-2023 00:00:00 Report Time Step .......... 00:05:00 ************* Element Count ************* Number of rain gages ...... 3 Number of subbasins ....... 1 Number of nodes ........... 1 Number of links ........... 0 **************** Subbasin Summary **************** Subbasin Total Peak Rate Area Factor ID acres ------------------------------------------ Sub-01 128.81 484.00 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ Out-01 OUTFALL 0.00 0.00 0.00 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 23.908 2.227 Surface Runoff ........... 0.693 0.065 Continuity Error (%) ..... -0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 6.921 2.255 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ****************************************** Composite Curve Number Computations Report ****************************************** ------------------ Subbasin Sub-01 ------------------ Area Soil Soil/Surface Description (acres) Group CN ---------------------------------------------------------------------------------------- Row crops, straight row, Good 59.52 C 85.00 Imperv-areas 1.34 - 98.00 > 75% grass cover, Good 67.95 C 74.00 Composite Area & Weighted CN 128.81 79.33 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness ------------------ Subbasin Sub-01 ------------------ Sheet Flow Computations ----------------------- Subarea A Subarea B Subarea C Manning's Roughness: 0.20 0.00 0.00 Flow Length (ft): 100.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 2 yr, 24 hr Rainfall (in): 1.20 1.20 1.20 Velocity (ft/sec): 0.09 0.00 0.00 Computed Flow Time (minutes): 18.42 0.00 0.00 Shallow Concentrated Flow Computations -------------------------------------- Subarea A Subarea B Subarea C Flow Length (ft): 3464.00 0.00 0.00 Slope (%): 2.50 0.00 0.00 Surface Type: Straight rows Unpaved Unpaved Velocity (ft/sec): 1.42 0.00 0.00 Computed Flow Time (minutes): 40.66 0.00 0.00 ================================================================================================ Total TOC (minutes): 59.08 ================================================================================================ *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- Sub-01 2.20 0.66 42.67 79.330 0 00:59:04 -------------------------------------------------------------------------- Analysis began on: Wed Jun 28 15:13:20 2023 Analysis ended on: Wed Jun 28 15:13:21 2023 Total elapsed time: 00:00:01 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis From:Chris@mountaincross-eng.com To:Philip Berry Subject:RE: stormwater plan - eagle springs organic large solar Date:Tuesday, August 15, 2023 1:58:44 PM Philip: No additional comments on these, either. Thanks again. Sincerely, Mountain Cross Engineering, Inc. Chris Hale, P.E. 826 1/2 Grand Avenue Glenwood Springs, CO 81601 Ph: 970.945.5544 Fx: 970.945.5558 From: Philip Berry <pberry@garfield-county.com> Sent: Monday, July 31, 2023 3:50 PM To: Chris@mountaincross-eng.com Subject: RE: stormwater plan - eagle springs organic large solar I apologize, I also have these updated documents. I don’t think I forwarded them all to you. Sorry about that. Philip Berry, AICP Planner Garfield County – Community Development Department 108 8th. St., Suite 401 Glenwood Springs, CO 81601 Pberry@garfield-county.com Office: 970-945-1377 (1580) Cell: 970-456-4404 From: Philip Berry Sent: Monday, July 31, 2023 11:08 AM To: Chris@mountaincross-eng.com Subject: stormwater plan - eagle springs organic large solar Attached is an updated version of their stormwater plan for application (MPPA-04-23-8956). I’m finalizing my staff report for the BOCC hearing that will be next Monday. This item is a recommended Condition of Approval that they are trying to fulfill as soon as possible. No giant rush on our end for review though. Please call if you have any questions or concerns. Thanks Philip Berry, AICP Planner Garfield County – Community Development Department 108 8th. St., Suite 401 Glenwood Springs, CO 81601 Pberry@garfield-county.com Office: 970-945-1377 (1580) Cell: 970-456-4404