Loading...
HomeMy WebLinkAboutFigure 2 Bank stabilization cross section 8.12.26Cobble fill behind retainage boulders (8" minus) General Notes 1. Collapsed embankment to be reinforced with 2' boulders interlocking as retainage 2. Fill behind retainage boulders to be 8"- minus cobble. 3. New embankment set at 2:1 slope 4. Cap cobble fill with 6" topsoil to match existing grade Boulder retainage anchored on pond bottom; 2:1 slope Final Planting Grade (Match existing) WSEL BANK STABILIZATION: TYPICAL CROSS SECTION Existing embankment and pond bottom contour Max Depth 3.5' Along Entire Work Area 6" layer of fines over structural fill for growth medium Existing embankment soft soils damaged/eroding due to muskrat excavation Existing Bank-Typical Open Water AreaStabilization Fill Area 5. Reseed or place sod as desired Environmental Solutions, Inc. 600 CR 216 Rifle, CO 81650 Phone: (970) 618-6841 steve.dahmer@esinc.biz FIGURE NO. Aprvd by:SDD Date: Job No:File Name:CLIENT: SAHNOW POND GARFIELD COUNTY 2 SAHNOW 437 AUG 26SDD Adam Sahnow Drawn by: BANK STABILIZATION CROSS SECTION C:\Environmental Solutions\ES LOGO FINAL.tif