HomeMy WebLinkAboutVegetation Management & Fire Mitigation PlanL E S T E R
DEVELOPMIZOMMI ENT
:u Vegetation Management & Fire Mitigation Plan
Project: Lot 7, White Cloud Ridge - Carbondale, CO
Applicant: Lester Development
Residence Size: -6,500 sq. ft. Single -Family Home
Permit Type: Major Grading & Building
Prepared for: Garfield County Building & Fire Authorities
> 1.Objectives
• Minimize wildfire risk through strategic vegetation clearance and site design
• Establish and maintain defensible space around the structure
• Comply with Garfield County's WUI standards and Appendix J of the 2015 IBC
• Ensure year-round fire -safe conditions through long-term maintenance
<> 2. Site Conditions
• Vegetation Type: High desert shrubs, grasses, small stands of Gambel oak
• Slope: Gently sloped with some terrain variation (520%)
• Access: Private road access with proposed fire turnaround and driveway
improvements
• Exposure: South -facing rear; adjacent lots are undeveloped or grassland
11> 3. Defensible Space Zones
L E S T E R
DEVELOPMENT
Zone Distance from Actions
Home
Zone 1 0-5 ft - Remove flammable vegetation, wood mulch, and
debris
- Use rock, gravel, or pavers for landscaping
- Trim trees back from roof/chimney
- 15' clearance around propane tanks and utilities
Zone 2 5-30 ft - Thin tree crowns to 10' spacing
- Remove ladder fuels
- Mow grass to 4"
- Firewood stored >30' from home
Zone 3 30-100 ft - Thin native brush and trees to reduce fuel continuity
- Maintain open areas
- Remove dead/dying trees and debris
- Retain healthy, spaced vegetation to reduce erosion
4. Construction & Material Practices
• Class A fire -rated roofing (e.g., metal or tile)
• Non-combustible siding (e.g., stucco, fiber cement)
• Vents screened with 1/8" metal mesh
• Dual -pane tempered windows
9 Decks and eaves enclosed or ignition -resistant
L E S T E R
DEVELOPMENT
'> 5. Driveway Access & Emergency Features
• Driveway will meet 12' min. width and 13.5' vertical clearance
• Emergency turnaround provided at build site
• Reflective address marker (min. 4" height) at road entry
• Temporary water source during construction if required by Fire Marshal
< 6. Maintenance Plan
• Vegetation management performed seasonally and after significant wind events
• Annual fire mitigation inspection and cleanup
• Firewood relocated seasonally (Oct —May) if stored on -site
• Ongoing compliance with Garfield County and Firewise guidance
0 7. Summary
This Vegetation Management & Fire Mitigation Plan is designed to reduce wildfire risk
through defensible space creation, fuel reduction, fire -safe construction practices, and
ongoing site maintenance. All work will comply with local codes, Firewise USA® principles,
and be verified by the local Fire District as required.