Loading...
HomeMy WebLinkAboutMemorandum CorrespondenceGlenwood Springs Office GARFIELD & HECHT, P.C. 910 Grand Avenue, Suite 201 Glenwood Springs, Colorado 81601 ATTORNEYS AT LAW Telephone (970) 947-1936 Since 1975 Facsimile (970) 947-1937 www.garfieldhecht.com MEMORANDUM � TO: Garfield County Community Development o FROM: Garfield & Hecht, P.C. DATE: June 17, 2025 SUBJECT: 214 Center — Lot 2 updated site plan On March 31, 2025, representatives of Citadel Glenwood, LLC met with planning staff to discuss a new site plan for the remaining undeveloped portion of Lot 2 of the Glenwood Business Center (aka Cooper Minor Subdivision). Citadel has since revised the site plan to address the comments made during the meeting and prepared building elevations. The updated site plan and building elevations are provided with this memo. Development of Lot 2 is subject to BOCC Resolution No. 2023-42 recorded at Reception No. 995950 (the "Resolution") and the Cooper Minor Subdivision Plat recorded at Reception No. 995947 (the "Plat"). The Resolution and Plat impose several requirements that must be addressed at the time of building permit.' Specifically, the following information must be provided at the time of building permit: A. For building permits that deviate from and exceed representations contained in the minor subdivision application and traffic study based on type of uses and square footage, provision of an updated traffic assessment based on actual uses proposed within the building. Additional traffic improvements and updated County Access Permit may be required based on assessment of actual uses. B. Provision of detailed site plan including but not limited to confirmation of compliance with off-street parking, landscaping, and general consistency with minor subdivision representations. C. Provision of detailed lighting and signage plans demonstrating compliance with the Land Use and Development Code ("LUDC"), including demonstrating mitigation for lighting impacts on adjacent residential properties. ' The Resolution also imposed a number of conditions and requirements that had to be satisfied before recording the Plat. Those requirements were satisfied before the Plat was recorded in 2023 and are not addressed here. D. Provision of detailed architectural elevations and building height calculations demonstrating general conformance with the minor subdivision representations including but not limited to building height maximum of 25 ft. and number of stories. As described below, the development proposed in the site plan is consistent with the LUDC and the minor subdivision application. Development metrics 0 37 storage garages ranging from 1,000 to 1,500 SF o Use: personal storage with common area restroom and RV dump station for use by unit owners/lessees ■ use by right ■ consistent with uses and scope analyzed in traffic study submitted with minor subdivision application o Max building height: 23' 10" o Lot 2 FAR including B Buildings: less than 50% per LUC Table 3-201 o Lot 2 Lot coverage including B Buildings: less than 85% per LUC Table 3-201 o Setbacks: • Front: 100.19 feet ■ Side: 28 feet ■ Rear: N/A ■ LUC 7-1001(D): 100.19 feet o Parking • Total on -site parking: 57 spaces • At least one parallel parking space in front of each garage • 10 parallel parking spaces south of Building B 1 • LUC does not establish parking requirements for storage uses • 20 parking spaces provided for existing—100,000 sq. ft. mini - storage building • Total square footage of B buildings is approximately half the size of the mini -storage building with double the parking provided o Landscape buffer between Building B3 and Donegan Road and between Building B4 and Building A (mini -storage) — consistent with landscaped areas proposed in 2023 SUP amendment application o Lighting and signage plan to be submitted with building permit application per Plat Note 2. Updated Building Plans for B 1 including elevations o Restroom moved to the west end of Building B 1 (first building built); RV dump station inside dumpster enclosure o Exterior materials to match existing storage and flex building (various metal panel profiles, same/similar colors) o Overhead doors to be bronze to match existing buildings o Exterior wallpacks to be shielded from residential (none on north side of Building B3) o Some units will have mezzanines and bathrooms as shown (final number TBD), some will be one large open space for larger vehicles o All units will have roof top packaged HVAC unit. Likely all will have large fan for air circulation. All will be roughed in for bathrooms o Fence/gate material still being decided but will be consistent with quality and design of building exteriors Citadel intends to submit its building permit application for the B Buildings in mid to early July. As noted above, the lighting and sign plan will be included in the building permit application submittal for review. Please contact me if there is any additional information or documentation Citadel should include with its building permit application based on information presented above.