MEMORANDUM �
TO: Garfield County Community Development o
FROM: Garfield & Hecht, P.C.
DATE: June 17, 2025
SUBJECT: 214 Center — Lot 2 updated site plan
On March 31, 2025, representatives of Citadel Glenwood, LLC met with planning staff to discuss
a new site plan for the remaining undeveloped portion of Lot 2 of the Glenwood Business Center
(aka Cooper Minor Subdivision). Citadel has since revised the site plan to address the comments
made during the meeting and prepared building elevations. The updated site plan and building
elevations are provided with this memo.
Development of Lot 2 is subject to BOCC Resolution No. 2023-42 recorded at Reception No.
995950 (the "Resolution") and the Cooper Minor Subdivision Plat recorded at Reception No.
995947 (the "Plat"). The Resolution and Plat impose several requirements that must be addressed
at the time of building permit.' Specifically, the following information must be provided at the
time of building permit:
A. For building permits that deviate from and exceed representations contained in the minor
subdivision application and traffic study based on type of uses and square footage,
provision of an updated traffic assessment based on actual uses proposed within the
building. Additional traffic improvements and updated County Access Permit may be
required based on assessment of actual uses.
B. Provision of detailed site plan including but not limited to confirmation of compliance with
off-street parking, landscaping, and general consistency with minor subdivision
representations.
C. Provision of detailed lighting and signage plans demonstrating compliance with the Land
Use and Development Code ("LUDC"), including demonstrating mitigation for lighting
impacts on adjacent residential properties.
' The Resolution also imposed a number of conditions and requirements that had to be satisfied before recording the
Plat. Those requirements were satisfied before the Plat was recorded in 2023 and are not addressed here.
D. Provision of detailed architectural elevations and building height calculations
demonstrating general conformance with the minor subdivision representations including
but not limited to building height maximum of 25 ft. and number of stories.
As described below, the development proposed in the site plan is consistent with the LUDC and
the minor subdivision application.
Development metrics
0 37 storage garages ranging from 1,000 to 1,500 SF
o Use: personal storage with common area restroom and RV dump station for use
by unit owners/lessees
■ use by right
■ consistent with uses and scope analyzed in traffic study submitted with
minor subdivision application
o Max building height: 23' 10"
o Lot 2 FAR including B Buildings: less than 50% per LUC Table 3-201
o Lot 2 Lot coverage including B Buildings: less than 85% per LUC Table 3-201
o Setbacks:
• Front: 100.19 feet
■ Side: 28 feet
■ Rear: N/A
■ LUC 7-1001(D): 100.19 feet
o Parking
• Total on -site parking: 57 spaces
• At least one parallel parking space in front of each garage
• 10 parallel parking spaces south of Building B 1
• LUC does not establish parking requirements for storage uses
• 20 parking spaces provided for existing—100,000 sq. ft. mini -
storage building
• Total square footage of B buildings is approximately half the size
of the mini -storage building with double the parking provided
o Landscape buffer between Building B3 and Donegan Road and between Building
B4 and Building A (mini -storage) — consistent with landscaped areas proposed in
2023 SUP amendment application
o Lighting and signage plan to be submitted with building permit application per
Plat Note 2.
Updated Building Plans for B 1 including elevations
o Restroom moved to the west end of Building B 1 (first building built); RV dump
station inside dumpster enclosure
o Exterior materials to match existing storage and flex building (various metal panel
profiles, same/similar colors)
o Overhead doors to be bronze to match existing buildings
o Exterior wallpacks to be shielded from residential (none on north side of Building
B3)
o Some units will have mezzanines and bathrooms as shown (final number TBD),
some will be one large open space for larger vehicles
o All units will have roof top packaged HVAC unit. Likely all will have large fan
for air circulation. All will be roughed in for bathrooms
o Fence/gate material still being decided but will be consistent with quality and
design of building exteriors
Citadel intends to submit its building permit application for the B Buildings in mid to early July.
As noted above, the lighting and sign plan will be included in the building permit application
submittal for review. Please contact me if there is any additional information or documentation
Citadel should include with its building permit application based on information presented above.