MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE.
(2018 IECC'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR HUD
HOMES BUT DO APPLY FOR IRC/IBC MANUFACTURED HOMES
1) FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL
COMPLY WITH 2O15 I.R.C. 2018 I.E.C.C. AND MANUFACTURER'S INSTALLATION
REQUIREMENTS.
2) NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE
AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.REFER TO THE WILDFIRE RESILIENCY CODE HANDOUT ATTACHED
TO THE PLANS AND THE CWRC FOR ALL WILDFIRE CODE REQUIREMENTS. ONLY
THE SITE MITIGATION (HOME IGNITION ZONES) SHALL APPLY ALTHOUGH IT IS
HIGHLY RECOMMENDED TO COMPLY WITH ALL SECTIONS OF THE CWRC.
3) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS
COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION,
1000PSF.
4) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
5) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
6) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE
RMITS
7) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
8) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED
PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE
CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY.
EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY
INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES.
9) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
10)ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED.
11) UFER GROUNDS ARE REQUIRED TO BE INSPECTED AT FOOTING INSPECTION
12) INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
13) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING
PLANTS AND SEEDS.
14) REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON -
SEEDED AREA.
15) PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED.
16) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION.
17) FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER.