Loading...
HomeMy WebLinkAboutSubsoil Study for Foundation Design Report 06.23.261(+AKunw ni Associates, Inc 5020 County Road 154 Geotechnicat and Materials Engineers Glenwood Springs, CO 81601 and Environmental Scientists phone: (970) 945-7988 email: kagienwood@kumarusa.com www.kumarusa.com An Employee Owned Company Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado RECEIVED June 23, 2026 Lealon Montgomery & Jordyn Christianson 2601 County Road 233 GARFIELD COUNT Rifle, Colorado 81650 rOMMUNITY DEVELOPMEl' ileechristianson(aD-hotmail.com Project No.26-7-313 Subject: Subsoil Study for Foundation Design, Proposed Residence, Across from 2601 County Road 233, Garfield County, Colorado Dear Lealon and Jordyn: As requested, Kumar & Associates, Inc. performed a subsoil study for design of foundations at the subject site. The study was conducted in accordance with our agreement for geotechnical engineering services to you dated May 28, 2026. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: The proposed residence will be a single -story, wood -framed modular structure located on the site as shown on Figure 1. Ground floor will be structural over a crawlspace. Cut depths are expected to range between about 3 to 5 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: At the time of our field exploration, the building site was a vacant field. The ground surface appeared natural with a slight to moderate slope sown to the south. Vegetation consisted of grass and weeds with nearby cottonwood trees. An active irrigation ditch crosses the property uphill of the building site. The ditch will be piped as construction on the residence begins. Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating two exploratory pits at the approximate locations shown on Figure 1. The logs of the pits are presented on Figure 2. The subsoils encountered, below about one foot of topsoil consisted of medium dense/stiff silty sand and clay with scattered gravel. Results of swell -consolidation testing performed on relatively undisturbed samples of the sand and clay soils, presented on Figures 3 and 4, indicate low compressibility under existing low moisture content and light loading and moderate collapse potential when wetted. No free water was observed in the pits at the time of excavation and the soils were slightly moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable bearing pressure of 1,000 psf can be used for support of the proposed residence with a significant risk of settlement. The soils tend to compress after wetting and there could be post -construction foundation settlement and building distress if the bearing soils are wetted. Footings should be a minimum width of 24 inches for continuous Lealon Montgomery & Jordyn Christianson Project No. 26-7-313 June 23, 2026 Page 2 walls and 30 inches for columns. The topsoil and loose disturbed soils at the foundation bearing level should be removed and the exposed soils moistened and compacted. We should observe the completed excavation for bearing conditions. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 55 pcf for the on -site soil as backfill. Floor Slabs: The natural on -site soils, exclusive of topsoil, can be used to support lightly loaded slab -on -grade construction with a risk of settlement. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4-inch layer of relatively well graded sand and gravel such as %-inch road base should be placed beneath slabs for support. This material should consist of minus - inch aggregate with less than 50% passing the No. 4 sieve and less than 12% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on - site soils devoid of vegetation and topsoil. Underdrain System: It is our understanding the proposed finished floor elevation at the lowest level is at or above the surrounding grade. Therefore, a foundation drain system is not required. It has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below -grade construction, such as retaining walls, be protected from wetting and hydrostatic pressure buildup by an underdrain and wall drain system. A shallow crawlspace should not need to be protected with an underdrain with proper foundation wall backfill and surface grading. If the finished floor elevation of the proposed structure is revised to have a floor level below the surrounding grade, we should be contacted to provide recommendations for an underdrain system. All earth retaining structures should be properly drained. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. A swale will be needed uphill to direct surface runoff around the residence. Kumar & Associates, Inc.® Lealon Montgomery & Jordyn Christianson June 23, 2026 Project No.26-7-313 Page 3 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 10 feet from the building. Consideration should be given to the use of xeriscape to limit potential wetting of soils below the foundation caused by irrigation. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type of construction, and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory pits and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified at once so re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on -site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or if we may be of further assistance, please let us know. Respectfully Submitted, Kumar & Associates, Inc. 1J David A. Noteboom, Staff Engineer Reviewed by: 15222 Steven L. Pawlak, P.E. DAN/kac Attachments Figure 1 — L �dxrploratory oratory Pits Figure 2 — oPits Figures 3 & 4— Swell -Consolidation Test Results Table 1 — Summary of Laboratory Test Results Kumar & Associates, Inc _ \ \ ac drive {approx location of \ \ 1 Irrigation drainage J m approx. location of proposed cistern PROPERTY IS ACROSS FROM 2601 CR 233 30 0 3C 5u APPROXIMATE SCALE -FEET 26-7-313 I Kumar & Associates I LOCATION OF EXPLORATORY PITS I Fig. 1 PIT 1 PIT 2 0 0 WC=6.3 �; DD=95 WC=2.3—200=56 Sl DD=95 w WC=3.1 w w DD=107 = 5—200=16 5 WC=3.7 w o DD=94 L10 10 LEGEND TOPSOIL; SANDY SILT AND CLAY WITH ORGANICS, FIRM, SLIGHTLY MOIST TO MOIST, DARK BROWN. SAND AND CLAY (SC—CL) SILTY, SCATTERED GRAVEL TO GRAVELLY LAYERS, MEDIUM DENSE/STIFF, SLIGHTLY MOIST, BROWN, SLIGHTLY POROUS. HAND DRIVEN 2—INCH DIAMETER LINER SAMPLE. NOTES 3 1. THE EXPLORATORY PITS WERE EXCAVATED WITH A BACKHOE ON JUNE 12, 2026. 04 c 2. THE LOCATIONS OF THE EXPLORATORY PITS WERE MEASURED APPROXIMATELY BY PACING FROM FEATURES SHOWN ON THE SITE PLAN PROVIDED. M n i 3. THE ELEVATIONS OF THE EXPLORATORY PITS WERE NOT MEASURED AND THE LOGS OF THE EXPLORATORY PITS ARE PLOTTED TO DEPTH. 0 4. THE EXPLORATORY PIT LOCATIONS SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE M IMPLIED BY THE METHOD USED. M 5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE N APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL. i N 6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF EXCAVATION. PITS WERE c� BACKFILLED SUBSEQUENT TO SAMPLING. z 7. LABORATORY TEST RESULTS: i WC = WATER CONTENT (%) (ASTM D 2216); o DD = DRY DENSITY (pcf) (ASTM D 2216); M w —200= PERCENTAGE PASSING NO. 200 SIEVE (ASTM D 1140). N � .. m O � � U C 10 m N p O N m . U N p 26-7-313 Kumar & Associates LOGS OF EXPLORATORY PITS Fig. 2 C� rn 3 a 0 0 M O M n O1 O M M I I to N N O N z W SAMPLE OF: Very Sandy Silty Clay FROM: Pit 1 0 2' WC = 2.3 %, DID = 95 pcf 2 ADDITIONAL COMPRESSION / UNDER CONSTANT PRESSURE DUE TO WETTING .. 0 -� v J —2 3 Cn 1 —4 z 0 a -6 J O fN z O U -8 -10 -12 char t.at d. T ppH og to t . The It Ib. i .W - I d. "R Hall 1 6e npoauwe, Dp_a Io futl, of the •Yt— Ir c,dl m. Seel Rumor and t-UN�. f Swstl Cane + th In pe),-454 AS . OacO�daMO Alta /$'IY 6-�]M. doNo ,I 1.0 APPLIED PRESSURE - KSF 10 100 26-7-313 Kumar & Associates SWELL —CONSOLIDATION TEST RESULTS Fig. 3 SAMPLE OF: Sandy Silty Clay FROM: Pit 2 ® 6' WC = 3.7 %, DD = 94 pcf 2 ADDITIONAL COMPRESSION UNDER CONSTANT PRESSURE / DUE TO WETTING ,. 0 J —2 W 3 N 1 —4 z 0 a —6 J O N z O U —8 The- teat ree.ft ePpy any to the comp+" tried. Th. tewb g ".port eh.1' net tr wroduoed, .—pt In .. vnthoul the written approval of Kumar o d Atsoe:etr. Inc. Swell Coneofdatbn tewtlnQ performed In xcprdance pith ASM D-451E. 1.0 APPLIED PRESSURE — KSF 10 26-7-313 Kumar & Associates SWELL —CONSOLIDATION TEST RESULTS Fig. 4 & ® ] & k . § � � \ w w & )c§ ®a m22 -4mr m�k ��k k / m / j / z z kkm \ §0m mzz § � � ) % } k Ak z cnxq §�§ � §z =m� M / / CD k a q q q ƒ m n § A � CD 0 § 4 cla CD a s s � q O n Ca 0> 2m 2 � � m cn q ;u m cn a � Cl)